← The Saudi aviation reference, in one place.
AC 90-117 - Data Communications
Reproduced for study. Always verify against the official GACAR at gaca.gov.sa.
U
.S. Department
of Transportation
Federal Aviation
Administration Advisory
Circular
Subject: Data Link Communications Date: 10/3/17 AC No: 90-117
Initiated by: AFS-400 Change:
This advisory c ircular (AC) applies to all pilots, certificate holders, operators, and/or program
managers conducting data link communication operations and to those providing data
communication services on behalf of operators to meet Federal Aviation Administration (FAA) and International Civil Aviation Organization (ICAO) requirements.
The AC provides an overview of data link communication operations for U. S. domestic
operations and in oceanic and remote continental airspace. It includes operational use guidance,
minimum performance and services of communication service provider (CSP), performance monitoring, training requirements, and discrepancy reporting.
Michael Zenkovich
Deputy Executive D irector, Flight Standards Service
10/3/17 AC 90 -117
CONTENTS
Paragraph Page
Chapter 1. General ...................................................................................................................... 1-1
1.1 Purpose of this Advisory Circular (AC) ....................................................................... 1-1
1.2 Applicability .................................................................................................................. 1-1
1.3 Where You Can Find This AC ...................................................................................... 1-1
1.4 What This AC Cancels .................................................................................................. 1-1
1.5 Scope ............................................................................................................................. 1-2
1.6 AC Format ..................................................................................................................... 1-2
1.7 Version References ....................................................................................................... 1-2
1.8 FAA Document References .......................................................................................... 1-2
1.9 References (current editions) ........................................................................................ 1-2
1.10 Airworthiness .............................................................................................................. 1-5
1.11 Regulatory Basis for Data Link Communication ........................................................ 1-5
1.12 AC Feedback Form ..................................................................................................... 1-5
Chapter 2. Data Link Communication Overview ....................................................................... 2-1
2.1 Introduction ................................................................................................................... 2-1
2.2 What Are Data Link Communications? ........................................................................ 2-1
2.3 FANS ............................................................................................................................ 2-2
2.4 CPDLC and ADS -C ...................................................................................................... 2-2
2.5 ATN .............................................................................................................................. 2-4
2.6 B2 .................................................................................................................................. 2-4
2.7 FANS 1/A(+) and ATN ................................................................................................ 2-5
2.8 ACARS ATS ................................................................................................................. 2-5
2.9 Tower Data Link System (TDLS) ................................................................................. 2-5
2.10 CPDLC -DCL ............................................................................................................... 2-5
2.11 PDC ............................................................................................................................. 2-7
2.12 Data Authority ............................................................................................................. 2-9
2.13 ATS Us and Aircraft Interoperability ......................................................................... 2-10
2.14 Performance -Based Communication and Surveillance (PBCS) Concept ................. 2-17
2.15 RCP and RSP Specifications Supporting ATM Operations ...................................... 2-18
2.16 Required Surveillance Performance (RSP) ............................................................... 2-23
ii
10/3/17 AC 90 -117
2.17 High Frequency Data Link (HFDL) .......................................................................... 2-28
2.18 Future U.S. Domestic Airspace Data Link Communication Services ...................... 2-29
2.19 Data Communication Services Strategy .................................................................... 2-30
Chapter 3. Aircraft Eligibility ..................................................................................................... 3-1
3.1 Introduction ................................................................................................................... 3-1
3.2 Aircraft Eligibility ......................................................................................................... 3-1
3.3 Statement of Compliance (SOC) ................................................................................... 3-1
3.4 Configuration Control ................................................................................................... 3-3
3.5 Maintenance .................................................................................................................. 3-4
Chapter 4. Communication Service Providers (CSP) ................................................................. 4-1
4.1 CSP for Oceanic and Remote Continental Operations ................................................. 4-1
4.2 RCP 240 CSP Allocations ............................................................................................. 4-2
4.3 RCP 400 CSP Allocations ............................................................................................. 4-3
4.4 RSP Allocation Requirements ...................................................................................... 4-4
4.5 Alternate Means of Compliance ................................................................................... 4-5
4.6 CSP for U.S. Operations ............................................................................................... 4-5
4.7 CSP Monitoring ............................................................................................................ 4-8
Chapter 5. Operational Use Of Data Link Communications ...................................................... 5-1
5.1 Operational Use ............................................................................................................. 5-1
5.2 Data Link Operational Guidance .................................................................................. 5-2
5.3 Logon/Notification ........................................................................................................ 5-2
5.4 En Route ........................................................................................................................ 5-4
5.5 Voice Monitoring .......................................................................................................... 5-5
5.6 Free Text Messages ....................................................................................................... 5-6
5.7 Data Link Communication Failures .............................................................................. 5-6
5.8 ADS -C ........................................................................................................................... 5-6
5.9 Exiting CPDLC and ADS -C Areas ............................................................................... 5-7
5.10 Logoff/D isconnect ....................................................................................................... 5-7
Chapter 6. Performance Monitoring ........................................................................................... 6-1
6.1 Performance Monitoring ............................................................................................... 6-1
6.2 Oceanic and Remote Continental Airspace .................................................................. 6-1
iii
10/3/17 AC 90 -117
6.3 Performance Website .................................................................................................... 6-2
6.4 Substandard Performance ............................................................................................. 6-2
6.5 Corrective Aircraft Action ............................................................................................ 6-2
6.6 Data Link Performance Eligibility ................................................................................ 6-2
6.7 Procedures to Report Problems ..................................................................................... 6-2
6.8 Performance Monitoring in U.S. Domestic Airspace ................................................... 6-2
Chapter 7. Training ..................................................................................................................... 7-1
7.1 Training D ocumentation ............................................................................................... 7-1
7.2 Objectives ...................................................................................................................... 7-1
7.3 Ground and Flight Training .......................................................................................... 7-1
7.4 Pilot Knowledge Subject Areas .................................................................................... 7-2
7.5 Pilot Procedural Training Items .................................................................................... 7-3
7.6 Dispatcher Training ....................................................................................................... 7-4
7.7 Maintenance Training ................................................................................................... 7-5
Chapter 8. Reports ...................................................................................................................... 8-1
8.1 Introduction ................................................................................................................... 8-1
8.2 Common Reasons to Report ......................................................................................... 8-1
8.3 Oceanic and Remote Continental Problem Reporting .................................................. 8-1
8.4 U.S. Domestic Airspace Problem Reporting ................................................................ 8-1
8.5 Problem Reporting Process ........................................................................................... 8-1
Appendix A. Foreign Operators ................................................................................................. A-1
A.1 General ......................................................................................................................... A-1
A.2 Title 14 CFR Part 129 .................................................................................................. A-1
A.3 Application Process ..................................................................................................... A-1
A.4 Unique Address ............................................................................................................ A-1
A.5 U.S. Interoperability Requirements ............................................................................. A-1
A.6 Training ........................................................................................................................ A-2
A.7 Unsafe Per formance or Conditions .............................................................................. A-2
A.8 U.S. Domestic Airspace ............................................................................................... A-2
Appendix B. Data Link Communications Minimum Equipment List (MEL) and
Master Minimum Equipment List (MMEL) Provisions ........................................B -1
B.1 Inoperative Equipment ..................................................................................................B -1
iv
10/3/17 AC 90 -117
Appendi x C. Summary of Airspace Requirements .....................................................................C -1
C.1 Summary of Airspace Requirements ............................................................................C -1
Appendix D. Flight Planning ..................................................................................................... D-1
D.1 Filing Required Communication Performance (RCP)/Required Surveillance
Performance (RSP) Capabilities .................................................................................. D-1
D.2 Regulatory Basis .......................................................................................................... D-1
D.3 Example ....................................................................................................................... D-2
D.4 Item 10a Descriptors .................................................................................................... D-2
D.5 Item 10b Descriptors .................................................................................................... D-3
D.6 Item 18 RSP Specification ........................................................................................... D-3
D.7 Field 18/DAT for CPDLC or Pre -Departure Clearance (PDC) ................................... D-4
Appendix E. Voice Phraseology ................................................................................................. E-1
Appendix F. Controller -Pilot Data Link Communication (CPDLC) Uplink and
Downlink Tables .................................................................................................... F-1
Appendix G. Terminology and Acronyms ................................................................................. G-1
G.1 Terminology ................................................................................................................. G-1
G.2 Acronyms ..................................................................................................................... G-5
v
10/3/17 AC 90 -117
List of Figures
Figure 2 -1. Overview Data Link System ................................................................................... 2-1
Figure 2 -2. ADS -C Event Sequence .......................................................................................... 2-3
Figure 2 -3. Data Link Communication Services on Departure Procedure ................................ 2-6
Figure 2 -4. Next Data Authority Notification ......................................................................... 2-10
Figure 2 -5. Air Traffic Service Unit (ATSU) and Aircraft Interoperability
Designators ........................................................................................................... 2-11
Figure 2 -6. Performance -Based CNS/ATM Model ................................................................. 2-17
Figure 2 -7. Actual Communications Performance (ACP) ....................................................... 2-19
Figure 2 -8. RCP 240 Illustration ............................................................................................. 2-20
Figure 2 -9. RCP 400 Illustration ............................................................................................. 2-22
Figure 2 -10. RSP 180 Illustration .............................................................................................. 2-25
Figure 2 -11. RSP 400 Performance ........................................................................................... 2-27
Figure 2 -12. Data Communication Services Strategy ............................................................... 2-29
List of Tables
Table 2 -1. PDC vs. CPDLC -DCL ............................................................................................ 2-9
Table 2 -2. Interoperability Designators and Descriptions ...................................................... 2-12
Table 2 -3. Types of Data Link Systems and Operations ........................................................ 2-16
Table 2 -4. RCP 240 Transaction Time and Continuity Allocations —CPDLC ..................... 2-21
Table 2 -5. RCP 240 Availability Criteria (Aircraft System) .................................................. 2-21
Table 2 -6. RCP 240 Integrity Criteria (Aircraft System) ....................................................... 2-21
Table 2 -7. RCP 400 Transaction Time and Continuity Allocations —CPDLC ..................... 2-23
Table 2 -8. RCP 400 Avail ability Criteria (Aircraft System) .................................................. 2-23
Table 2 -9. RCP 400 Integrity Criteria (Aircraft System) ....................................................... 2-23
Table 2 -10. RSP 180 Surveillance Data Delivery and Continuity Allocations —ADS -C ........ 2-26
Table 2 -11. RSP 180 Availability Criteria (Aircraft System) .................................................. 2-26
Table 2- 12. RSP 180 Integrity Criteria (Aircraft System) ....................................................... 2-26
Table 2 -13. RSP 400 Surveillance Data Delivery and Continuity Allocations —ADS -C ........ 2-28
Table 2 -14. RSP 400 Availability Criteria (Aircraft System) .................................................. 2-28
Table 2 -15. RSP 400 Integrity Criteria (Aircraft System) ....................................................... 2-28
Table 4 -1. RCP 240 Transaction Time and Continuity Allocations to CSP ............................ 4-2
Table 4 -2. RCP 240 CSP Availability and Outages Pa rameters .............................................. 4-2
Table 4 -3. RCP 400 Transaction Time and Continuity to CSP Allocation .............................. 4-3
Table 4 -4. RCP 400 Availability and Outages Parameters ...................................................... 4-3
vi
10/3/17 AC 90 -117
Table 4 -5. RSP 180 Data Delivery Time and Continuity Criteria ........................................... 4-4
Table 4 -6. RSP 180 Availability and Outages Parameters ....................................................... 4-4
Table 4 -7. RSP 400 Data Delivery Time and Continuity Criteria ........................................... 4-5
Table 4 -8. RSP 400 Availability and Outages Parameters ....................................................... 4-5
Table 4 -9. Data Communications Network Services (DCNS) Performance Baseline ............. 4-7
Table 5 -1. CPDLC Connection Failure Responses .................................................................. 5-5
Table B -1. Minimum Equipment Lis t Example ....................................................................... B-1
Table B -2. Example of a Data Link Communication MMEL Provision ................................. B-2
Table C -1. Summary of Airspace Requirements ..................................................................... C-1
Table C -2. Subnetwork Designators ........................................................................................ C-3
Table C -3. Preferred Original Equipment Manufacturer Annotat ion ...................................... C-3
Table D -1. Item 10a Flight Plan COM Descriptors ................................................................. D-3
Table D -2. Item 10b Flight Plan Descriptors for Surveillance Equipment .............................. D-3
Table D -3. Voice, PDC, DCL .................................................................................................. D-4
Table D -4. DCL and En Route Data Link Clearances ............................................................. D-6
Table D -5. PDC Only and En Route Data Link ....................................................................... D-7
Table D -6. En Route Data Link Clearances Only .................................................................... D-7
Table E -1. Voice Phraseology Related to Controller -Pilot Data Link Communication
(CPDLC) From Pilot ............................................................................................... E-1
Table E -2. Voice Phraseology Related to CPDLC From the ATSU ........................................ E-2
Table F -1. Color Key ................................................................................................................ F-1
Table F -2. Response Attribute of CPDLC Message Element for Uplink Messages ................ F-1
Table F -3. Response Attribute of CPDLC Message Element for Downlink Messages ........... F-2
Table F -4. Route Uplink Message Elements (RTEU) .............................................................. F-3
Table F -5. Route Downlink Me ssage Elements (RTED) ......................................................... F-7
Table F -6. Lateral Uplink Message Elements (LATU) ............................................................ F-8
Table F -7. Lateral Downlink Message Elements (LATD) ..................................................... F-11
Table F -8. Level Uplink Message Elements (LVLU) ............................................................ F-13
Table F -9. Level Downlink Message Elements (LVLD) ....................................................... F-20
Table F -10. Crossing Constraint Uplink Messages (CST U) .................................................... F-24
Table F -11. Speed Uplink Messages (SPDU) .......................................................................... F-28
Table F -12. Speed Downlink Messages (SPDD) ..................................................................... F-31
Table F -13. Air Traffic Advisory Uplink Messages (ADVU) ................................................. F-32
Table F -14. Air Traffic Advisory Downlink Messages (ADVD) ............................................ F-36
Table F -15. Voice Communication Uplink Messages (COMU) .............................................. F-37
vii
10/3/17 AC 90 -117
Table F -16. Voice Communication Downlink Messages (COMD) ......................................... F-39
Table F -17. Spacing Uplink Messages (SPCU) ....................................................................... F-40
Table F -18. Spacing Downlink Messages (SPCD) .................................................................. F-42
Table F -19. Emergency/Urgency Uplink Messages (EMGU) ................................................. F-44
Table F -20. Emergency/Urgency Downlink Messages (EMGD) ............................................ F-45
Table F -21. Standard Response Uplink Message s (RSPU) ...................................................... F-46
Table F -22. Standard Response Downlink Messages (RSPD) ................................................. F-47
Table F -23. Supplemental Uplink Messages (SUPU) .............................................................. F-48
Table F -24. Supplemental Downlink Messages (SUPD) ......................................................... F-49
Table F-25. Free Text Uplink Messages (TXTU) .................................................................... F-49
Table F -26. Free Text Downlink Messages (TXTD) ............................................................... F-50
Table F -27. System Management Uplink Messages (SYSU) .................................................. F-51
Table F -28. System Management Downlink Messages (SYSD) ............................................. F-53
Table F -29. FANS 1/A Uplink Messages Not Recommended for Use .................................... F-54
Table F -30. FANS 1/A Downlink Messages Not Recommended for Use ............................... F-57
Table F -31. ATN B1 Uplink Messages Not Recommended for Use ....................................... F-58
Table F -32. ATN B1 Downlink Me ssages Not Recommended for Use .................................. F-58
viii
10/3/17 AC 90 -117
CHAPTER 1. GENERAL
1.1 Purpose of this Advisory Circular (AC) . This AC provides guidance for aircraft
eligibility and operational use of data link communications in the United States and in
oceanic and remote continental airspace. This document also provides explanations of
data link systems to inform those who may b e new to using digital aircraft
communication and surveillance systems. This AC provides new guidance associated
with updated and/or new operational authorization. The regulatory source basis for this AC is Title 14 of the Code of Federal Regulations (14 C FR) part 91, § 91.123
. For more
information, see paragraph 1.11.
1.1.1 AC Terms . The term “must” is used in this AC to indicate a mandatory requirement
driven by regulation or required for a system to operate pr operly. The term “should” is
used to indicate a recommendation. The term “operator” refers to the certificate holder, program manager, and operator/company. Future Air Navigation System (FANS) 1/A(+)
is used to denote both FANS 1/A and/or FANS 1/A+.
1.1.2 Altern ative Method of Compliance . In lieu of following the guidance in this AC without
deviation, operators may elect to follow an alternative method, provided the alternative method is found to be acceptable to the Federal Aviation Administration ( FAA ). This AC
does not change, add, or delete regulatory requirements or authorize deviations from regulatory requirements.
1.2 Applicability. This AC applies to operators under 14 CFR parts 91, 91 subpart K
(part 91K ), 121, 125, 129 , and 135 conducting data link communications operations in
the United States or in oceanic and remote continental airspace. This AC also applies
where the foreign authority has adopted International Civil Aviation Organization
(ICAO ) data link communication standards.
Note: Part 91 operators do not require operational authorization for the use of
data link in the United States . For data l ink operations in oceanic and remote
continental airspace and/or foreign countries requiring specific data link approval, part 91 operators may apply to their responsible Flight Standards office for a l etter
of authorization (LOA). Pilots using “J” codes f or U.S. domestic data link
en route require a data link authorization prior to entering oceanic and remote
continental airspace. P art 91 operators filing J codes for U.S. domestic data link
services must have a data link authorization to file J5 –J7 in oceanic and remote
continental airspace (s ee Appendix D
, Flight Planning).
1.3 Where You Can Find This AC. You can find this AC on the FAA ’s webs ite at
http://www.faa.gov/regulations_policies/advisory_circulars .
1.4 What This AC Cancel s. AC 120- 70C, Operational Authorization Process for Use of
Data Link Communication System, dated August 3, 2015, is cancelled.
10/3/17 AC 90 -117
1.5 Scope. The scope of this AC is limited to the interoperability designators listed in
Table 2- 2, Interoperability Designators and Descriptions. Aeronautical Information
Services (AIS) and Meteorological Information (METI) Services are excluded from the
scope of this AC.
1.6 AC Format. Chapter 2 , Data Link Communication Overview, is intended to inform those
not familiar with data link communications. Chapters 3 -8 provide aircraft eligibility and
operational guidance with the following topics:
• Chapter 3 , Aircraft Eligibility,
• Chapter 4 , Communication Service Provider s (CSP),
• Chapter 5 , Operational Use of Data Link Communications,
• Chapter 6 , Performance Monitoring,
• Chapter 7 , Training, and
• Chapter 8 , Reports.
1.7 Version References. The most current version of a document is designated by
parentheses “ ( )” placed at the end of the number designation. Specific versions are
indicated by a letter. If no letter appears after the document designation, then all versions
of the document are applicable . As a convenience, most references are hyperlinked to a
website containing the most current document . The most current ACs or Technical
Standard Orders ( TSO ) are available by clicking the following links :
1. ACs.
2. TSOs .
1.8 FAA Document References. This AC, along with AC 20 -140( ), provides all the
information necessary for data link communication compliance in the United States and
in oceanic and remote continental airspace and should be considered the “source documents” for the operational use of data link by U .S. ope rators and pilots. ICAO
documents are referenced in this document as a convenience to the operator.
1.9 References (current editions) .
1. Title 14 CFR Parts 21, 23, 25, 27, 29, 43, 91, 91K , 121, 125, 129, and 135
2. ACs:
• AC 20- 140, Guidelines for Design Approval of Aircraft Data Link
Communication Systems Supporting Air Traffic Services ( ATS).
• AC 20- 160, Onboard Recording of Controller Pilot Data Link Communication in
Crash Survivable Memory.
10/3/17 AC 90 -117
3. TSOs :
• TSO -C160a , Very High Frequency (VHF) Digital Link (VDL) Mode 2
Communications Equipment.
• TSO -C177 ( ), Data Link Recorder Equipment.
4. ICAO Documents :
• Annex 6 , Operation of Aircraft , Part I, International Commercial Air Transport.
• Annex 6 , Operation of Aircraft, Part II, International General Aviation .
• Annex 10 , Aeronautical Telecommunications, Volume II, Communication
Procedures including those with PANS status.
• Annex 10 , Aeronautical Telecommunications, Volume III, Communication
Systems , Part 1, Digital Data Communications Systems .
• Annex 11 , Air Traffic Services.
• Annex 15 , Aeronautical Information Services.
• Annex 19 , Safety Management.
• Document 4444 , Procedures for Air Navigation Services - Air Traffic
Managem ent.
• Document 7030 , Regional Supplementary Procedures.
• Document 8400 , Procedures for Air Navigation Services, ICAO Abbreviations
and Codes .
• Document 8585 , Designators for Aircraft Operating Agencies, Aeronautical
Authorities and Service s.
• Document 9694 , Manual of Air Traffic Services Data Link Applications .
• Document 9869 , Performance- Based C ommunication and S urveillance
(PBCS) Manual .
• Document 10037 , Global Operational Data Link (GOLD) Manual , ICAO Global
Guidelines for Data Link Operations.
• Document 10063 , Manual on Monitoring the Application of Performance -Based
Horizontal Separation Minima.
• North Atlantic Document 007 , North Atlantic Operations and Airspace Manual.
This document is published on behalf of the North Atlantic Systems Planning
Group by the European and North Atlantic Office of ICAO and includes data link material.
• North Atlantic Oceanic Errors Safety Bulletin (OESB) .
10/3/17 AC 90 -117
5. RTCA and European Organization for Civil Aviation Equipm ent
(EUROCAE ) Documents :
• DO-219, Minimum Operational Performa nce Standard (MOPS) for ATC
Two-Way Data Link Communications , dated August 27, 1993.
• DO-258A /ED-100A , Interoperability Requirements for ATS Applications Using
ARINC 622 Data Communications, dated April 7, 2005.
• DO-264/ED-78A, Guidelines for Approval of the Provision and Use of Air
Traffic Services Supported by D ata Communications, dated December 14, 2000.
• DO-280B Change 1 /ED-110B Change 1, Volume s 1 and 2, Interoperability
Requirements Standard for Aeronautical Telecommunication Network Baseline 1
(ATN B1 Interop Standards ), dat ed March 18, 2014.
• DO-290 Changes 1 and 2 /ED-120 Changes 1 and 2, Safety and Performance
Requirements Standard for Air Traffic Data Link Services in Continental
Airspace (Continental SPR Standard), dated April 29, 2004.
• DO-305A /ED-154A , Future Air Navigation System 1/A - Aeronautical
Telecommunication Network Interoperability Standard (FANS 1/A - ATN B1
Interop Standard) , dated March 21, 2012.
• DO-306 Change 1 /ED-122 Change 1, Safety and Performance Standard for
Air Traffic Data Link Services in Oceanic and Remote Airspace (Oceanic SPR
Standard), dated March 2011.
• DO-350A , Safety and Performance Requirements Standard for Baseline 2 ATS
Data Communications (Baseline 2 SPR Standard) , Volume s 1 and 2.
• ED-85A, DLASD for the Dep arture Clearance Data- Link Service .
• ED-89A, DLASD for the ATIS Data -link Service .
• ED-93, Minimum Aviation System Performance Standard for CNS/ATM
Message Recording Syst ems-Amendment 1, dated November 23, 1998.
• ED-106A , DLASD for the Oceanic Clearance Data- link Service .
6. Data Communications Network Service (DCNS) Alternative Media
Description . The DCNS Alternative Me dia Description define s the
qualification requirements for any media proposed to be used for domestic en route air traffic control (ATC) operations.
7. NAS Data Communicatio ns Guide . This document introduces operators to
data link communications operations within the U nited States National
Airspace. It discusses Controller -Pilot Data Link Communication –Departure
Clearance ( CPDLC -DCL ) and outlines the roles of the Airline Operations
Center, clearance delivery controllers, and pilots . The document describes the
general procedures for logging on /notifying , loading the flight plan, receiving
the CPDLC -DCL, responding to the CPDLC -DCL mess age, and
disconnecting /logging off. Examples of d ifferent types of revised
CPDLC -DCLs are provided with guidance for reviewing, processing ,
10/3/17 AC 90 -117
and responding to the clearances. Additionally, this guide provides general
information on the use of data link comm unications during en route
operations.
8. Data Link Communication Compliance Guide . This guide expedites
the compliance process as it condenses into one location the information
required for data link operations.
1.10 Airworthiness. For airworthiness guidance for new aircraft and systems, refer to
AC 20-140( ).
1.11 Regulatory Basis for Data Link Communication. CPDLC is an acceptable method of
delivering and accepting an ATC clearance i n accordance with part 91, § 91.123.
With data link communication technology, both digital and voice communication are
available to ATC and the pilot . Depending on the operation, data link communication
may be the most suitable method of communication as deemed necessary fo r ATC and
pilot purposes.
1.11.1 CPDLC Compliance and Voice Communication. CPDLC is not sufficient as a means
of compliance to the voice communication equipment requirements as per § § 91.129 ,
91.130, 91.131, 91.135, 91.205, and 91.511; part 121, §§ 121.99 and 121.122 ; and
part 135, § 135.165 , and is not required by these rules . For data link communications,
two-way radio voice communication or other means of communication approved by
the FAA must also be available .
1.11.2 Flight Plan Filing and Data Link Communication Capability . Pilots and operators must
file an accurate flight plan in accordance with §§ 91.169 and 91.153(a) (9). The Air
Traffic Service Unit ( ATSU) evaluates flight plan designator(s) to provide filed services.
Pilots and operators should use the guidanc e in this AC and other appropriate documents
to determine the data link communication de signator (s) for their route (s ee Appendix D).
1.11.3 Cockpit Voice Recorder (CVR) and Flight Data Recorder (FDR) . Operators must comply
with the CVR and FDR requirements of §§ 91.609(j) , 121.359(k) , and 135.151(h) , and
part 125, § 125.227(i) . FAA Information for Operators ( InFO) 16004 provides additional
guidance concerning the appli cability of these regulations.
1.12 AC Feedback Form. For your convenience, the AC Feedback Form is the last page of
this AC. Note any deficiencies found, clarifications needed, or suggested improvements
regarding the contents of this AC on the Feedback Form.
10/3/17 AC 90 -117
CHAPTER 2. DATA LINK COMMUNICATION OVERVIEW
2.1 Introduction. This chapter is intended to be informative for those not familiar with
data link communication. For those already knowledgeable, Chapters 3 through 8 of this AC are devoted to data link eligibility and use.
2.2 What Are Data Link Communications? “Data link” is a generic term encompass ing
different types of data link systems and subnetworks. Figure 2 -1, Overview Data Link
System, provides an overview of a data link system, including subnetworks. While many
data link capable aircraft have access to very high frequency ( VHF ) data link (VDL) ,
not all aircraft have access to additional satellite and/or high frequency ( HF) data link
capability. Similarly, not all communication service providers (CSP ) have HF data link
capability.
Figure 2 -1. Overview Data Link System
2.2.1 Aircraft Communication Addressing and Reporting System (ACARS) and Aeronautical
Telecommunications Network (ATN) . There are ACARS -based applications and
ATN-based applications. The VDL Digital Link Mode 2 subnetwork supports both
ACARS -based and ATN-based applications. The other subnetworks listed in this section
support ACARS-based applications only. Controller Pilot Data Link Communication (CPDLC) and Automatic Dependence Surveillance- Contract (ADS -C) can be Future
Air Navigation System ( FANS ) 1/A(+) or ATN -based. The FANS 1/A- based services
are used over the ACARS networks and the ATN-based services are used over the
10/3/17 AC 90 -117
ATN networks. The ACARS and ATN networks are not compatible. This AC
concentrates on CPDLC and ADS -C using FANS 1/A(+) unless specifically denoted
as ATN.
2.2.2 Data Link Subnetwork. Data link s ystems send messages over several communication
subnetworks:
• VDL Mode 0/A (i.e., ACARS) ,
• VDL Mode 2,
• Satellites, and/or
• High Frequency D ata Link (HFDL).
2.2.3 Data Link Systems . Data link communications is a means of transmitting and receiving
digital informa tion. ATS d ata link s ystems include the following:
• FANS 1/A(+),
• ATN Baseline 1 (B1) ,
• Baseline 2 (B2), and
• ACARS Air Traffic Service (ATS).
2.3 FANS. FANS 1/A is ACARS -based and provides direct data link communication
between the pilot and the air traffic contr oller via FANS 1/A avionics and FANS 1/A
ground end systems . In the early 1980s, International Civil Aviation Organization
(ICAO) began an effort to establish data link architecture under its FANS structure.
Boeing developed FANS 1 to DO- 219 and ARINC 745 using ARINC 622 binary
character data format followed by Airbus with its FANS A. These two systems are
referred to as FANS 1/A. The “ +” at the end of FANS 1/A indicates an updated system
version that includes a message latency monitor to detect old messages that may no longer apply. FANS messages can be sent over a variety of subnet works
depending on:
• Aircraft equipment,
• Configuration/media management, and
• Subnetwork availability .
2.4 CPDLC and ADS -C.
2.4.1 CPDLC . CPDLC is a means of communication between controller and pilot, using
data link for air traffic control ( ATC ) communications . Messa ges from an aircraft to the
Air Traffic Service Unit ( ATSU) may follow a standard format or may be free text.
Messages from a controller normally follow a stand ard format and usually require a
response from the pilot ( see Appendix F, Controller Pilot Data Link Communication
10/3/17 AC 90 -117
(CPDLC ) Uplink and Downlink Tables, for uplink message (UM) and downlink message
(DM) sets).
2.4.2 ADS -C. ADS -C is an automated surveillance information system that send s position and
other flight reports to the ATSU. After initial logo n/notification , a link is established
between the ground system and the aircraft . Without pilot input, the oceanic
ATSU/Aeronautical Operational Control ( AOC ) can establish a “contract ” with the
aircraft to receive reports of aircraft identification, aircraft position, altitude,
Mach number, vertical rate, true track, magnetic heading, ground speed, navigation
waypoints, and meteorological data.
2.4.2.1 ADS -C Contract Types. Depending on the aircraft type, there can be up to
five separate connections to different ground facilities (i.e., ATSU/AOC)
at any one time . Each connection can have one Periodic contract, one Event
contract, and one Demand contract.
1. Periodic. The ATSU can set or alter the update rate or time interval as needed (a higher update rate is usually required in high traffic
areas or associated with reduced separation).
2. Event. The aircraft system will communicate an event as established by the ATSU if there is a change in waypoint, vertical rate, lateral deviation or altitude. An event contract remains in effect until the ATSU cancels it or until the event(s) used to trigger the report occurs. The waypoint change event contract will trigger a report for all waypoint changes. All other eve nt contracts will
trigger a report on the first occurrence and then, if necessary, the
ATSU will need to request a new event contract indicating all desired event types. (See Figure 2 -2, ADS -C Event Sequence.)
3. Demand. The ATSU can request a single update as needed. This does not affect an existing contract preset rate.
Figure 2 -2. ADS -C Event Sequence
10/3/17 AC 90 -117
2.4.2.2 ADS -C Emergency. An ADS -C emergency can be triggered by the pilot
by the following means :
1. Manually, by selecting the ADS -C emergency function;
2. Indirectly, by triggering another type of emergency alerting system
(e.g., transmission of a CPDLC emergency message or selection of
a Secondary Surveillance Radar (SSR) emergency code); and
3. Covertly (The availability of that functionality may vary between aircraft ty pes).
Note: Once an ADS -C emergency has been triggered, under normal
circumstances, the avionics will continue to transmit ADS -C
emergency periodic reports until the pilot de-selects the ADS -C
emergency function.
2.5 ATN. ATN is a n inter -network architecture permitting ground, air -ground, and avionic s
data subnetworks to exchange digital data for the safety of air navigation and for the regular, efficient, and economic operation of ATS . ATN i s in limited use in Europe,
but not available in U.S. domestic airspace . The system is terrestrial based and
not available over oceanic and remote continental areas.
2.5.1 ATN B1 . ATN B1 consists of the following :
• Context management (CM) application for Data Link Initiation Capability (DLIC)
service; and
• CPDLC application for AT C Communication Management (ACM), AT C Clearance
(ACL) , and ATC Microphone C heck (AMC) services .
2.6 B2. B2 is ATN- based and will enable extended capabilities not possible with ATN B1
or FANS 1/A(+) as shown in Table 2- 2, Interoperabil ity Designators and Descriptions .
The FAA plans to implement the B2 CM , CPDLC, and ADS -C ATN- based applications
over the Internet Protocol Suite. B2 will provide additional services such as :
1. CPDLC:
• Initial F our-Dimensional ( 4-D) Trajectory Data Link (4DTRAD) ,
• Dynamic Required Navigation Performance (DRNP ), and
• Advanced flight I nterval Management (IM) .
2. ADS -C:
• Extended Projected Profile (EPP) information provided in ADS -C report s
supporting Information Exchange and Reporting ( IER), 4DTRAD, an d DRNP
services.
10/3/17 AC 90 -117
2.7 FANS 1/A(+) and ATN. Some avionics implementations support both the
FANS 1/A(+)- based applications and associated protocols and the ATN -based
applications and protocols. Depending on the system used by the ATSU, pilots may be
required to l ogoff/ disconnect any existing CPDLC or ADS -C session(s) and re establish
contact to another ground system when seamless transfer is not possible .
2.8 ACARS ATS. ACARS is a digital data link system for transmitting short, relatively
simple messages between aircraft and ground stations via VHF, HF, or satellite.
Note: The ACAR S network also carries FANS 1/A (+) messages .
2.8.1 Background. ARINC designed the ACARS protocol to replace VHF voice service
in 1978. Later, Société International de Télécommunications Aeronautique s (SITA )
added additional radio stations to augment this servic e. Airlines introduced ACARS
in the late 1980s to reduce crew workload and improve data integrity. Although the term
ACARS is often thought to encompass only a single data link syste m installed on the
aircraft, it actually refers to a complete air and ground system.
2.8.2 Aircraft and Ground ACARS Systems . The aircraft portion of ACARS system consists of
an avionics computer called an ACARS management unit (MU) and a control display
unit (CDU). On the ground, the ACARS system is made up of a network of radio
transceivers to receive (or transmit) data link messages and route them to various airlines
on the network.
2.8.3 ACARS ATS S upported A pplications Include :
• Departure Clearance ( DCL ) (not to be confused w ith CPDLC -DCL),
• Oceanic clearance (OCL),
• Terminal Weather Information for P ilots (TWIP) , and
• Digital Automatic Terminal I nformation Service ( D-ATIS ).
2.9 Tower Data Link System (TDLS). The TDLS automates tower -generated information
for transmission to aircraft via data link communication for both CPDLC -DCL and
Pre-Departure Clearance (PDC). The TDLS interfaces with sources of local weather data
and flight data in order to provide pilots with PDC, D -ATIS, and CPDLC -DCL services .
Note: The term PDC refers to the U.S. ATS of DCL. The DCL includes flight
plan route, climb via, and/or initial/requested altitude, beacon code assignment, and departure frequency.
2.10 CPDLC- DCL. CPDLC -DCL is available at va rious airports in U.S. domestic airspace
using FANS 1/A(+) via VDL Mode 0/A and/or Mode 2 for departure clearance services .
2.10.1 Dispatch or Flight Following Systems . For operators with a dispatch center,
flight following system, or other bas e of operations, copies of all data link
10/3/17 AC 90 -117
communications may be routed to, and stored by, the operator. Contact the FAA Data
Communications Program Office (refer to their website ) to coordinate.
2.10.2 CPDLC –Departure Clearance Service (CPDLC -DCL) . CPDLC -DCL provides a means
for requesting and delivering initial and revised DCLs . These CPDLC messages include
departure procedure, flight plan route, initial and requested altitude, beacon code,
departure frequency , and other non-route information .
Note 1: CPDLC -DCL is different than international DCL operations.
International systems use the ACARS ATS DCL application via
ARINC 623/European Organization for Civil Aviation Equipment ( EUROCAE )
ED-85A, not the FANS CPDLC application .
Note 2: At participating airports, PDC service s may be available for
non-FANS equipped aircraft.
2.10.3 CPDLC Specified on the Airport Diagram. To differentiate what communication services
are available at each facility, refer to the airport diagram, Standard Instrument Departures (SID), and other terminal procedures pages. See Figure 2 -3, Data Link Communication
Services on Departure Procedure, for the CPDLC annotation on a departure procedure.
Figure 2 -3. Data Link Communication Services on Departure Procedure
10/3/17 AC 90 -117
2.10.3.1 CPDLC -DCL l ogon/n otification (see paragraph 5.3). “KUSA” is the National
Single Data Authority (NSDA) for all CPDLC logons /notifications in the
United States . Pilots activate the data link communication system anytime
during preflight by logging on to/notifying KUSA with ATC . Within
30 minutes of the proposed departure time, an “ATC Connection Established”
message will be received if the following conditio ns are met:
1. Logon /notification information was correctly formatted ;
2. An ATC -filed flight plan is on file ;
3. Flight plan indicates the aircraft is CPDLC -DCL capable; and
4. ATC controller has approved the DCL .
2.10.3.2 Once a successful ATC connection has been established and the CPDLC -DCL
has been approved by the controller, the CPDLC -DCL will be automatically
sent to the aircraft. Pilots do not have to request a clearance. After the
clearance is received and verified, p ilots should:
1. Review the clearance and verify that no clarification from ATC is
required (Reject/Unable) ;
2. Confirm the appropriate runway , if assigned , departure procedure ,
and transiti on with no discontinuities ; and then
3. Acknowledge ( ROGER (DM3)/WILCO (DM0 ) or UNABLE
(DM1)) the message.
Note 1: If it becomes necessary to revert to voice after receiving
a clearance, pilots should respond with Reject/Unable to the uplinked
clearance.
Note 2: For CPDLC -DCL ground operations only, pilots can expect
an automated ATC -initiated logoff/disconnect 5 to 10 minutes after
takeoff.
2.10.3.3 If changes in tower or en route conditions occur (e.g. weather) the ATSU may amend the clearance information and transmit a revised CPDLC -DCL. Pilots
should follow the same procedure for revised clearances.
2.11 PDC. PDC is a subscriber based service to provide an effective and efficient means of
delivering a text -based electronic departure clearance prior to taxi. Data link
communication technologies are utilized via a PDC in which ATC clearances are sent to
a subscriber’s dispatch center, flight f ollowers , or base of operations . The clearance is
made available to the pilot with the following formats :
1. Internet access,
2. Airline gate terminal,
10/3/17 AC 90 -117
3. Airline operations area terminal,
4. Fixed -Base Operator ( FBO ) terminal, and
5. ACARS.
2.11.1 PDC Communication . It is not necessary for an aircraft to be equipped with data link
communication avionics for a flight to participate in the PDC service. It is only necessary
for the pilot to be able to obtain a printed or electronically displayed copy of the PDC
message prior to taxi (may be printed at the FBO terminal, the airline gate, etc.) .
The contents of the PDC message are relayed to the aircrew without modification,
omission, or alteration. PDC is at the discretion of the clearance deliver y controller. If the
controller determines that issuing a PDC could introduce confusion, the controller will
issue a verbal clearance to the aircrew. If the pilot is uncertain of the clearance, the PDC
must not be used and the pilot must contact clearance delivery via voice (telephone or radio) and obtain their clearance.
2.11.2 PDC vs. CPDLC -DCL . The primary difference between the PDC and CPDLC -DCL
services is the PDC service depends on the operator or other third party to deliver the
PDC to the aircraft whereas CPDLC -DCL service is a direct connection after
logon/notification from the tower automation to t he flight deck avionics of
FANS -equipped ai rcraft. See Table 2-1, PDC vs. CPCLC -DCL, below for a side -by-side
comparison.
10/3/17 AC 90 -117
Table 2 -1. PDC vs. CPDLC- DCL
PDC CPDLC -DCL
No Logon /Notification Required Logon /Notification Required
Sent to AOC or other Operator prescribed location Automatically sent directly to FANS 1/A(+) equipped
aircraft over data link communication equipment after
crew logon /notification
Delivered to the pilot by various means (i.e., over
ACARS, to the FBO terminal, to the airline gate ) Delivered over data lin k communication directly to
the aircraft within 30 minutes of proposed ETD
Depending on the delivery method, may require a
printed copy to be delivered to the aircraft Never requires a pa per copy to be delivered to
the aircraft
Does not require data link communication equipment to
be installed in the aircraft Requires data li nk communication systems on
the aircraft
Does not support revised clearances. Revisions must be
transmitted via voice frequency Revised clearances can be delivered directly to the
aircraft when necessary without restrictions
A specific call sign can only be used once in an
adaptable time period of 12– 18 hours at a specific
airport Only one call sign for a given tail can be in use for
CPDLC- DCL clearances at any given time
Requires manual input by the pilot or may be uploade d
from an AOC Clearance can be sent to the avionics system which may
enabl e “push to load” via a load prompt
2.12 Data Authority. “KUSA” is the national data authority for all U.S. domestic CPDLC
logons /notifications . Figure 2-12, Data Communication Services Strategy, describes the
current and planned data communication services to be available in the domestic en route
environment. CPDLC en route operations in U.S. domestic airspace will use
FANS 1/A(+) equipped aircraft with multi- frequency VD L Mode 2 radios. For an
alternate subnetwork, see paragraph 4.6.2 .
2.12.1 Current Data Authority (CDA) . When an aircraft system accepts a CPDLC connection,
this active connection initiates the exchange of messages between the ATSU and the
aircraft as the ATSU becomes the CDA. The CDA typically initiates address forwarding
to permit a downstream or adjacent ATSU (next data authority ( NDA) ) to establish an
inactive CPDLC connection and/or an Automatic Dependent Surveillance ( ADS ) contract
for monitoring purposes.
2.12.2 Data Authority Transfer . When the active CPDLC connection i s terminated, the aircraft
will activate any inactive connection. In this case, the next data authority becomes the
CDA and is now able to exchange CPDLC messages with the aircraft. Figure 2-4,
Next Data Authority Notification, illustrates the transfer from the CDA to the NDA.
10/3/17 AC 90 -117
Figure 2 -4. Next Data Authority Notification
ATSUs and Aircraft Interoperability. Figure 2-5, Air Traffic Service Unit (ATSU) and
Aircraft Interoperability Designators, shows different ATSU ground systems and
interoperable aircraft systems. The diagram shows the CSP and its Centralized ADS -C
System (CADS). CSP’s CADS enables an ATSU without FANS 1/A capability to receive
ADS -C reports from any FANS 1/A, FANS 1/A(+ ) or FANS 1/A ADS -C aircraft.
A designator is assigned to each type of ATSU and aircraft data link system. Explanations of each interoperability designator are provided below in Table
Table 2-3, Types of Data Link Systems and Operations, provides an overview of the
operational capabilities that are supported by each of the different data link systems.
10/3/17 AC 90 -117
Figure 2 -5. Air Traffic Service Unit (ATS U) and Aircraft Interoperab ility Designators
10/3/17 AC 90 -117
Table 2 -2. Interoperability Designators and Descriptions
Interoperability Designator Description
ACARS ATS ATS applications, DCL, OCL, TWIP , and D-ATIS supported
by ACARS.
Note: The term DCL used internationally is similar to the term PDC
used in the United States.
ATSU CADS CSP’s CADS enables an ATSU without FANS 1/A capability to
receive ADS -C reports from an y FANS 1/A, FANS 1/A(+) or
FANS 1/A ADS -C aircraft.
FANS 1/A Initial FANS 1/A ATSU applications, ATSU Facilities Notifications
(AFN), CPDLC , and ADS -C supported by FANS 1/A.
Note: FANS 1/A typically involves communication (CPDLC),
navigation ( Area N avigation (RNAV) /Required N avigat ion
Performance ( RNP )) and surveillance (ADS -C). This document refers
to the FANS 1/A for the data link system, which includes the CPDLC
and ADS -C applications. Refer to ICAO Doc 9613 for guidance
material on navigation (RNAV/RNP) qualification an d use.
FANS 1/A ADS -C ATSU applications AFN and AD S-C supported by FANS 1/A.
FANS 1/A ADS -C comply with AFN and ADS -C applications,
but do not include CPDLC application.
FANS 1/A+ Same as FANS 1/A, except with additional features, such as the
message latency timer function, described in DO-258A /ED-100A.
Note 1: FANS 1/A(+) aircraft is interoperable with FANS 1/A and
FANS 1/A(+) ground stations. However, message latency capabil ity is
only available when FANS 1/A(+) ground stations interoperates with
FANS 1/A(+) aircraft.
Note 2: Seamless transition of ATSU data link service occurs between
ATN B1 and FANS 1/A(+) ground stations when:
• Aircraft equipped with ATN B1 and FANS 1/A(+) data link system
also incorporates interoperability requirement IR -207, IR -209,
IR-210, IR -211, IR -212, IR -214, and IR -215 of
DO-305A /ED-154A.
• ATN B1 ground station incorporates interoperability requirement IRec -1 and IR -213 of DO -305A/ED -154A.
• FANS 1/A(+) ground station incorporates interoperability requirement IR -208 of DO -305A/ED -154A.
Otherwise, the pilot will lose their data link service requiring the pilot
to manually perform a logon/notification to reestablish ATSU data link
service.
10/3/17 AC 90 -117
Interoperability Designator Description
Note 3: Seamless transition of ATSU data link service occurs between
B2 and FANS 1/A(+) ground stations when:
• Aircraft equipped with B2 and FANS 1/A(+) data link system also
incorporates i nteroperability requirement NIR -153, NIR -155,
NIR-156, NIR -157, NIR -158, NIR -160, and NIR -161 of
DO-352A /ED-229A.
• B2 ground station incorporates interoperability requirement
NIRec -3 and NIR -159 of DO -352A/ED -230A.
• FANS 1/A(+) ground station incorporates interoperability
requirement NIR -154 of DO -352A/ED -229A.
Otherwise, the pilot will lose their data link service requiring the pilot
to manually perform a logon/notification to reestablish ATSU data link
service.
Note 4: To allow a FANS 1/A(+) data communication system on an
aircraft to communicate with an ATN B1 data communication s ystem
at an ATSU, the ATSU ground system needs to accommodate the FANS 1/A(+) aircraft by incorporating the interoperability
requirements of DO -305A/ED -154A.
Note 5: To allow a FANS 1/A(+) data communication system on an
aircraft to communicate with a B2 data communication system at an ATSU, the ATSU ground syste m needs to accommodate the
FANS 1/A(+) aircraft by incorporating the interop erability
requirements of DO -352A/ED -230A.
ATN B1 ATS applications CM and CPDLC supported by ATN B1:
a) CM is a data link application providing DLIC .
b) CPDLC (Version 1) for ACM, ACL, and AMC .
Note 1: Interoperability for DCL , downstream clearance (DSC),
D-ATIS, and flight plan consistency data link services, which are
defined in DO-280B /ED-110B are not supported.
Note 2: Seamless transition of ATS data link service between ATN B1
and FANS 1/A+ ground stations when:
• Aircraft equipped with ATN B1 and FANS 1/A+ data link system
also incorporates interoperability requirement IR -207, IR-209,
IR-210, IR -211, IR -212, IR -214, and IR-215 of
DO-305A/ED -154A.
• ATN B1 ground station incorporates interoperability requirement
IRec -1 and IR -213 of DO -305A/ED -154A.
• FANS 1/A+ ground station incorporates interoperability
requirement IR -208 of DO -305A/ED- 154A.
Otherwise, the pilot will lose their service requiring the pilot to
manually perform a logon/notification to reestablish ATS data link
service.
10/3/17 AC 90 -117
Interoperability Designator Description
Note 3: To allow a FANS 1/A+ data communication system on an
aircraft to communicate with a n ATN B1 data communication system
at an ATSU, the ATSU ground system needs to accommodate the
FANS 1/A+ aircraft by incorporating the inte roperability requirements
of DO- 305A/ED -154A.
Note 4: To allow an ATN B1 data communication system on an
aircraft to c ommunicate with a B2 data communication system at an
ATSU, the ATSU ground system needs to accommodate the ATN B1 aircraft by incorporating the inte roperability requirements of
DO-353A
/ED-231A.
Note 5: To allow a B2 data communication system on an aircraft to
communicate with an ATN B1 data communication system at an
ATSU, the B2 data communication system on the aircraft needs to
accommodate the ATN B1 ground system by incorporating the
interoperability r equirem ents of DO -353A/ED -231A.
B2 Version of the Baseline 2 Data Communication system described in
this section. The United States plans to use B2, as defined in
AC 20-140C, as part of FAA’s NextGen initiative. An aircraft
equipped with B2 is fully interoperable with any B2 ground station.
Aircraft equipped with a version of B2 other than that defined by
AC 20-140C are not eligible for the B2 interop designator. B2 is
comprised of the following data link applications and data link
services.
a) CM is a data link application supporting the follow ing data link
service: DLIC.
b) CPDLC (Version 3) is a data link application supporting the
following data link services: ACM, Clearance Request and Delivery
(CRD), AMC, DCL, Data Link Taxi (D- TAXI), Oceanic Clearance
Delivery (OC D), 4DTRAD, IER, In -Trail Procedure s (ITP), IM ,
and DRNP.
c) ADS -C (Version 2) is a data link application supporting the
following data link services : 4DTRAD, IER, Position Reporting (PR),
IM, and DRNP.
Note 1: To allow a FANS 1/A+ data communication system on an
aircraft to communicate with a B2 data communication system at an
ATSU, the ATSU ground syste m needs to accommodate the
FANS 1/A+ aircraft by incorporating the inte roperability requirements
of DO- 352A/ED -230A.
Note 2: To allow an ATN B1 data communication system on an
aircraft to communicate with a B2 data communication system at an
ATSU, the ATSU ground system needs to accommodate the ATN B1
aircraft by incorporating the inte roperability requirements of
DO-353A/ED -231A.
10/3/17 AC 90 -117
Interoperability Designator Description
Note 3: To allow a B2 data communication system on an aircraft to
communicate with an ATN B1 data communication system at an
ATSU, the B2 data communication system on the aircraft needs to
accommodate the ATN B1 ground system by incorporating the
interoperability requirements of DO -353A/ED -231A.
10/3/17 AC 90 -117
Table 2 -3. Types of Data Link Systems and Operations
Aircraft
Equipment and
Capability ACARS ATS
(ATSU Ground
Data Link System) CADS or
AOC
(ATSU Ground
Data Link System) FANS 1/A
(ATSU Ground
Data Link System) ATN B1
(ATSU Ground
Data Link System) FANS 1/A –
ATN B1
(ATSU Ground
Data Link System)
ACARS ATS ATC
communication
• DCL or PDC
• OCL Flight
information
• D-ATIS N/A N/A N/A N/A
FANS 1/A
ADS -C N/A Surveillance
• ADS -C
(CADS) Surveillance
• ADS -C N/A N/A
FANS 1/A N/A Surveillance
• ADS -C
(CADS) ATC
communication
• CPDLC Surveillance
• ADS -C N/A ATC
communication
• CPDLC for ACM, ACL,
and AMC
data link
services
FANS 1/A+ N/A Surveillance
• ADS -C
(CADS) ATC
communication
• CPDLC
Surveillance
• ADS -C N/A ATC
communication
• CPDLC for ACM, ACL,
and AMC data link
services
ATN B1 N/A N/A N/A ATC
communication
• CPDLC for ACM, ACL, and AMC
data link
services ATC
communication
• CPDLC for
ACM, ACL, and AMC
data link
services
FANS 1/A –
ATN B1 N/A Surveillance
• ADS -C
(CADS) ATC
communication
• CPDLC
Surveillance
• ADS -C ATC
communication
• CPDLC for ACM, ACL,
and AMC
data link
services ATC
communication
• CPDLC for ACM, ACL,
and AMC
data link
services
Note: B2 will be included at a later date.
10/3/17 AC 90 -117
2.14 Performance -Based Communication and Surveillance (PBCS) Concept. The PBCS
concept provides objective operational criteria to evaluate different and emerging
communication and surveillance technologies and is intended for evolving Air Traffic
System Management ( ATM ) operations. Once these criteria have been set and accepted,
a specific implementation of an ATM operation including its technical and human
performance may have its viability assessed against these operational criteria. ATS system changes based on communication and/or surveillance performance align
with the PCBS concept (refer to ICAO Doc 9869
).
2.14.1 Aligned with Performance- Based Navigation (PBN) . The PBCS concept is aligned with
the concept of PBN. While the PBN concept ap plies RNP and RNAV specifications to
the navigation element, the PBCS concept applies required communication performance (RCP) and required surveillance performance (RSP) specifications to communication and surveillance elements, respectively. Each RCP/RSP specification includes allocated
criteria among the components of the communication and surveillance systems involved.
2.14.2 Communication , Navigation , and Surveillance (CNS)/ATM Model . Where beneficial,
RCP, RNP/RNAV , and RSP specifications are applied to comm unication, navigation,
and surveillance elements to ensure the operational system and its components perform in
accordance with the specifications. Figure 2 -6, Performance -Based CNS/ATM Model,
provides an overview of the performance-based CNS/ATM model, which characterizes the relationship of the performance-based specifications among CNS elements supporting an ATM operation.
Note: Similar to the PBN concept, security is beyond the scope of the PBCS
concept. However, in some cases, the RCP and RSP specifications may include criteria to support mitigations from security threats.
Figure 2 -6. Performance -Based CNS/ATM Model
10/3/17 AC 90 -117
2.14.3 PBCS and PBN Differences . There are some differences between the PBCS concept and
PBN concept:
1. The PBCS concept applies RCP and RSP specificati ons, which allocate
criteria to ATS provision, including communication services, aircraft
capability, and the aircraft operator. The PBN concept applies RNP/RNAV specifications which allocate criteria only to the aircraft capability and the aircraft operat or; and
2. The PBCS concept includes post -implementation monitoring programs, on a
local and regional basis, with global exchange of information. The PBN concept includes real -time monitoring and alerting functionality in the aircraft
capability.
Note: PBCS includes real -time alerts (e.g. , when a communication transaction
expires or a position report is overdue) that are conceptually different than the
PBN alerts (e.g. , RNP UNABLE).
2.15 RCP and RSP Specifications Supporting ATM Operations. To perform ATM
operatio ns within a performance -based airspace, the standards specify functional, safety
and performance criteria for the applicable CNS elements. RCP and RSP specifications,
in conjunction with RNP/RNAV specifications , provide these criteria and are intended to
facilitate the development of standards for ATM operations. This approach is essential to
the evolution of operational concepts that use emerging technologies. For example, within the organized t rack s ystem (OTS) in North Atlantic High Level Airspace
(NAT HLA), the Redu ced Lateral Separation Minima (RLatSM) include the following
requirements:
• RNP 4;
• CPDLC with RCP 240; and
• ADS -C with RSP 180.
2.15.1 RCP Specifications . An RCP specification represents operational parameters for the
complete communication transaction . It is identified by a designator (e.g., RCP 240
or RCP 400) in order to simplify the designator naming convention and to make the RCP
Expiration Time (ET) readily apparent to airspace planners, aircraft manufacturers ,
and operators. The designator represents the value for the communication ET after which
the initiator is required to revert to an alternative procedure. The RCP specifications are
applied to achieve the performance required of the communication process and may
support aircraft separation minima.
2.15.2 RCP Parameters . The following describes the RCP parameters:
1. RCP Transaction Time. An RCP parameter that specifies t he maximum time
for the completion of a proportion of operational communication transactions
after which the initiator should revert to an alternative procedure . Two values
are specified:
10/3/17 AC 90 -117
• RCP T ransaction Time (TT). The maximum nominal time within which
95 percent of operational communication transactions is required to be
completed; and
• RCP ( ET). The maximum time for the completion of the operational
communication transaction, after which the initiator is required to revert to an
alternative procedure.
2. RCP Continuity (RCP C) . The minimum proportion of operational
communication transactions to be completed within the specified RCP transaction time, given the service was available at the start of the transaction .
3. RCP Availability (RCP A) . The required probability that an operational
communication transaction can be initiated .
4. RCP Integrity (RCP I) . The required probability that an operational
communication transaction is completed with no undetected errors.
Note: While RCP I is defined in terms of the “goodness” of the communications
capability, it is specified in terms of likelihood of occurrence of malfunction on a per flight hour basis (e.g., 10
-5), consistent with RNAV/RNP specifications.
Figure 2 -7. Actual Communications Performance (ACP)
10/3/17 AC 90 -117
2.15.3 RCP Framework and Actual Communication Performance (ACP). In Figure 2-7, Actual
Communication s Performance (ACP), the combined uplink and downlink performance of
ground systems, communication service, and aircraft systems is the A ctual
Communication T echnical P erformance (ACTP). Pilots an d controllers should respond
as soon as possible as part of the overall human performance. Human performance
combined with ACTP results in ACP. ACP is an indicator of the operational performance
of a communication system which includes the human and technical components. Human performance considers such facto rs as training, procedures, and human -machine i nterface
(HMI). Technical performance comprises the installed elements of communication performance operating together to meet the intended function. ACP is assessed in the
same terms and parameters as an RC P specification, its allocations, and other relevant
operational criteria provided by an RCP specification. Operationally, an appropriate level of communication performance is required for aircraft systems, communications networks, and ground systems.
Note: In ICAO documentation, pilot response time is called Pilot Op erational
Response Time (PORT).
Figure 2-8. RCP 240 Illustration
10/3/17 AC 90 -117
2.15.4 RCP 240 Illustration. As i llustrated in Figure 2-8, RCP 240 Illustration, the controller
sends a data link communication message through the ATSU via the CSP to the aircraft.
The Required Communication Technical Performance (RCTP) is the overall time for the
communication to travel from the ATSU to the flight deck and return excluding human
response t ime. RCTP should be less than or equal to 150 seconds for 99.9 percent of the
operational time (ET) and must be less than or equal to 120 seconds for 95 percent of the
nominal time (TT). The message arrives at the flight deck and the pilot should respond a s
soon as possible (i.e. , ROGER (DM3)/WILCO (DM0), UNABLE (DM1) , or STANDBY
(DM2)) . The pilot responds to the message and it travels back to the ATSU.
2.15.5 RCP 240 Specification Tables . Table 2 -4, RCP 240 Transaction Time and Continuity
Allocations –CPDLC, shows Transaction Time and Continuity allocations from the sender
(controller) to responder (pilot) and back to sender (controller). RCTP consists of the ATSU system, network, and the aircraft system . Table 2 -5, RCP 240 Availability Criteria
(Aircraft System), provides the aircraft system availability criteria. Table 2 -6, RCP 240
Integrity Criteria (Aircraft System), provides the integrity criteria for the aircraft system.
Table 2 -4. RCP 240 Transaction Time and Continuity Allocations —CPDLC
ACP Controller ATSU
system Network Aircraft
system Pilot
Response Aircraft
system Network ATSU
system Controller
99.9% (ET) PC/ATSU (30) PATSU(15) PNET(120) PAIR(15) 60 PAIR(15) PNET(120) PATSU(15) PC/ATSU (30)
95% (TT) PC/ATSU (30) PATSU(10) PNET(100) PAIR(10) 60 PAIR(10) PNET(100) PATSU(10) PC/ATSU (30)
Table 2 -5. RCP 240 Availability Criteria (Aircraft System)
Availability Parameter Efficiency Safety Compliance Means
Availability – aircraft (A AIR) N/A 0.999 Analysis, architecture, design,
pre-implementation
demonstration
Table 2 -6. RCP 240 Integrity Criteria (Aircraft System)
Integrity Parameter Integrity Value Compliance Means
Integrity (I) Malfunction =
10-5 per flight
hour Analysis, safety requirements, development assurance level
(e.g. Level C software) commensurate with integrity level,
pre-implementation demonstration.
10/3/17 AC 90 -117
Figure 2-9. RCP 400 Illustration
2.15.6 RCP 400 Illustration. As illustrated in Figure 2 -9, RCP 400 Illustration, the controller
sends a data link communication message through the ATSU through the CSP to the
aircraft. The RCTP is the overall time for the communication to travel from the ATSU to
the flight deck and return excluding human factors. RCTP should be less than or equal to 310 seconds for 99.9 percent of the operational time (ET) and must be less than
or equal to 260 seconds for 95 percent of the nominal time (TT). The message arrives at
the flight deck and the pilots should respond as soon as possible (i.e., ROGER (DM3)/WILCO (DM0), UNABLE (DM1) , or STANDBY (DM2) ). The pilot responds to
the message and it travels back to the ATSU.
2.15.7 RCP 400 Specification Tables . Table 2-7 , RCP 400 Transaction Time and Continuity
Allocations —CPDLC, shows Transaction Time and Continuity allocations from the
sender (controller) to responder (pilot) and back to sender (controller). RCTP consists of the ATSU system, network, and the aircraft system . Table
2-8, RCP 400 Availa bility
Criteria (Aircraft System), provides the availability criteria for the aircraft system.
Table 2-9, RCP 400 Integrity Criteria (Aircraft System), provides the integrity criteria for
the aircraft system.
10/3/17 AC 90 -117
Table 2 -7. RCP 400 Transaction Time and Continuity Allocations —CPDLC
ACP Controller ATSU
system Network Aircraft
system Pilot
Response Aircraft
system Network ATSU
system Controller
99.9%
(ET) PC/ATSU (30) PATSU(15) PNET(280) PAIR(15) 60 PAIR(15) PNET(280) PATSU(15) PC/ATSU (30)
95%
(TT) PC/ATSU (30) PATSU(10) PNET(240) PAIR(10) 60 PAIR(10) PNET(240) PATSU(10) PC/ATSU (30)
Table 2 -8. RCP 400 Availability Criteria (Aircraft System)
Availability Parameter Efficiency Safety Compliance Means
Availability – aircraft (A AIR) N/A 0.999 Analysis, architecture, design,
pre-implementation
demonstration
Table 2 -9. RCP 40 0 Integrity Criteria (Aircraft System)
Integrity parameter Integrity value Compliance means
Integrity (I) Malfunction =
10-5 per flight
hour Analysis, safety requirements, development assurance level
(e.g. Level C software) commensurate with integrity level,
pre-implementation demonstration.
2.16 Required Surveillance Performance (RSP).
2.16.1 Background. In the past, surveillance over oceanic and remote continental areas was
limited to pilot position reports via HF radio. When crossing a compulsory reporting
point, the pilot would contact the ATSU via a radio operator and report: identification, position, time, altitude, next PR point, name of succeeding reporting point, and remarks.
Once the aircraft entered a radar environment, pilot reports were eliminated. Today, along with voice pilot position reports, surveillance in oceanic and remote continental airspace is accomplished much more accurately through the use of ADS -C. As with
CPDLC, ADS -C requires certain performance requirements for operational surveillance
in support of specific ATM functions. This includes the transmission of aircraft position, velocity and intent with a specified precision, accuracy and update ra tes. In combination
with RCP and RNP, RSP enables the efficient use of airspace by allowing reduced lateral and along -track separation of aircraft by supplying accurate and frequent updates of
aircraft position.
2.16.2 RSP Concept . The concept of RSP relates to t he surveillance component and
complements RNP and RCP. A collective set of performance measures are established to ensure overall communication transactions and surveillance data deliveries are suitable
for certain surveillance related goals. For example, the surveillance goal may be to
achieve 3 0 nautical miles (NM) lateral and 30 NM along -track separation in oceanic
10/3/17 AC 90 -117
airspace. RSP is operationally derived and not based on any specific techniques, aircraf t
technologies , or architecture.
2.16.3 RSP Specification . An RSP specification is identified by a designator (e.g. , RSP 180)
in order to simplify the designator naming convention and to make the RSP D ata
Operational Overdue T ime (OT) readily apparent to airspace planners, aircraft
manufacturers and operators. The designator represents the value for the surveillance
data delivery time when the surveillance data deli very is considered overdue.
RSP specifications are applied to airspace based on specif ic objectives (e.g. , the
performance required of the surveillance process used to support particular separation minima ). The RSP specification is a set of requirements/operational parameters for ATS
provision and associated ground equipment, aircraft capability, and operations needed to support performance -based surveillance. Surveillance performance requirements are
included and allocated to system components (Required Surveillance Technical Performance (RSTP)). It includes surveillance data delivery time, continuity, availability,
integrity , and safety . A specified RSP specification is intended to define the surveillance
performance required of a surveillance process to support a particular ATM function. RSP specification is applied to the a irspace, route, or procedure based on the most
stringent RSP specification of the required ATM functions.
2.16.4 RSP Parameters . RSP include the accuracy of the reported position, the latency in
reporting the position to the controller, and the integrity, availability, and continuity of the surveillance data. The following describes the RSP parameters:
1. RSP Surveillance Data Transit Time. The maximum time for the reception of the surveillance data after which the controller should revert to an alternative procedure .
2. RSP Continuity. The minimum proportion of surveillance data delivery to be completed within the specified RSP surveillance data delivery time, given the service was available at the start of the delivery.
3. RSP Availability. The required probability that surveillance data can be provided.
4. RSP Integrity. The required probability that surveillance data delivery is completed with no undetected errors.
10/3/17 AC 90 -117
Figure 2-10. RSP 180 Illustration
2.16.5 RSP 180 Illustration. In Figure 2 -10, RSP 180 Illustration, the ATSU establishes an event
contract with the aircraft with specific allocations described below :
1. From 1 to 2 (Aircraft). The aircraft reaches the particular event and is required
to respond within 5 seconds or less 99.9 percent of the operational time (OT)
and less than or equal to 3 seconds 95 percent of the nominal delivery
time (DT).
2. From 2 to 3 (CSP). The signal is then transmitted through the communication service provider (CSP) network. This action must occur within 170 seconds or less for 99.9 percent of the OT and less than or equal to 84 seconds 95 percent
of the DT .
3. From 3 to 4 (ATSU). From the (CSP) th is message is sent through the ATSU
which has a required performance of less than or equal to 5 seconds for 99.9 percent of the time and less than or equal to 3 seconds for 95 percent of
the time. The total communication from the event to the controller must be less than or equal to 180 seconds with 99.9 percent probability ( OT) and
less than or equal to 90 seconds with 95 percent probability ( DT).
2.16.6 RSP 180 Specification Tables. Table 2-10
, RSP 180 Surveill ance Data Delivery and
Continuity Allocations— ADS -C, shows allocations for Required Surveillance
Monitoring Performance/Required Surveillance Technical Performance (RSMP/RSTP)
consisting of the aircraft system , network and ATSU. Table 2-11, RSP 180 Availability
Criteria (Aircraft System), provides the availability criteria for the aircraft system.
10/3/17 AC 90 -117
Table 2- 12, RSP 180 Integrity Criteria (Aircraft System) provides the integrity criteria for
the aircraft system.
Table 2 -10. RSP 180 Surveillance Data Delivery and Continuity Allocations —ADS -C
RSMP/RSTP Aircraft system Network ATSU
99.9% (OT) 5 170 5
95% (DT) 3 84 3
Table 2 -11. RSP 180 Availability Criteria (Aircraft System)
Availability Parameter Efficiency Safety Compliance Means
Availability – aircraft (A AIR) N/A 0.999 Analysis, architecture, design,
pre-implementation
demonstration
Table 2 -12. RSP 180 Integrity Criteria (Aircraft System)
Integrity parameter Integrity value Compliance means
Integrity (I) Malfunction =
10-5 per flight
hour Analysis, safety requirements, development assurance level
(e.g. Level C software) commensurate with integrity level,
pre-implementation demonstration.
10/3/17 AC 90 -117
Figure 2-11. RSP 400 Performance
2.16.7 RSP 400 Illustration. In Figure 2 -11, RSP 400 Performance, the ATSU establishes
an event contract with the aircraft with specif ic allocations described below.
1. From 1 to 2 (Aircraft). The aircraft reaches the particular event and is required
to respond within 30 seconds or less 99.9 percent of the OT and less than or
equal to 15 seconds 95 percent of the DT .
2. From 2 to 3 (CSP). The signal i s then transmitted through the CSP network.
This action must occur within 340 seconds or less for 99.9 percent of the OT
and less than or equal to 270 seconds 95 percent of the DT .
3. From 3 to 4 (ATSU). From the CSP th is message is sent through the ATSU
which has a required perfor mance of less than or equal to 30 seconds for
99.9 percent of the time and less than or equal to 15 seconds for 95 percent of
the time. The total communication from the event to the controlle r must be
less than or equal to 400 seconds with 99.9 percent probability ( OT) and
less than or equal to 300 seconds with 95 percent probability ( DT).
2.16.8 RSP 400 Specification Tables. Table 2-13 , RSP 400 Surveillance Data Delivery and
Continuity Allocations —ADS -C, shows allocations for Required Surveil lance
Monitoring Performance/Required Surveillance Technical Performance (RSMP/RSTP)
consisting of the aircraft system, network and ATSU. Table 2-14, RSP 400 Availability
Criteria (Aircraft System), provides the availability criteria for the aircraft system.
Table 2-15, RSP 400 Integrity Criteria (Aircraft System), provides the integrity criteria
for the aircraft system.
10/3/17 AC 90 -117
Table 2 -13. RSP 400 Surveillance Data Delivery and Continuity Allocations —ADS -C
RSMP/RSTP Aircraft system Network ATSU
99.9% (OT) 30 340 30
95% (DT) 15 270 15
Table 2 -14. RSP 400 Availability Criteria (Aircraft System)
Availability Parameter Efficiency Safety Compliance Means
Availability – aircraft (AAIR) N/A 0.999 Analysis, architecture, design,
pre-implementation
demonstration
Table 2 -15. RSP 400 Integrity Criteria (Aircraft System)
Integrity parameter Integrity value Compliance means
Integrity (I) Malfunction =
10-5 per flight
hour Analysis, safety requirements, development assurance level
(e.g. Level C software) commensurate with integrity level,
pre-implementation demonstration. The aircraft end system
shall be capable of detecting errors that would result in
corruption, introduced by the co mmunication service.
2.17 High Frequency Data Link (HFDL). Over the past few decades HF has provided an
effective means of voice communication over long distance in oceanic and remote
continental airspace. HF communication is no longer restricted to voice and provides
another means of sending and receiving digital communication. HFDL augments existing VHF and satellite communications (SATCOM ) (i.e., CPDLC and ADS -C) data link
communication systems. A subnetwork of 15 HFDL ground stations extends worldwide
commu nication coverage beyond that of VHF data link communication subnetworks.
2.17.1 HFDL Applications . HFDL subnetwork provides communication to both ATSU and
AOC in oceanic and remote continental airspace and can be used for:
1. Non-SATCOM equipped aircraft with a long -range, cost -effective data link
communication capability,
2. Data link communication in polar regions where geostationary satellite connections may not exist or be degraded, and
3. A back -up means of data link communication for SATCOM (CPDLC and
ADS -C) equi pped aircraft.
10/3/17 AC 90 -117
2.17.2 Ionosphere HF Disturbance and Reliability . HF is subject to temporary signal distortion
due to changes in the ionosphere layer shape and density. Because of multiple H FDL
ground stations, ionosphere disturbances are less frequent than in the early days of
HF voice. Modern aircraft HFDL systems automatically search for the best available
frequency from all HFDL operational ground station frequencies. Once a suitable
frequency is found, the aircraft establishes a connection by sending a logon/n otification
message to the ground station. A logon/notification confirmation uplink is established
enabling the pilot to send data.
Note: Monitoring data have shown that HFDL does not meet RCP 240/RSP 180.
2.18 Future U.S. Domestic Airspace Data Link Communication Se rvices. Figure 2 -12
depicts future plans for data link communication services. Though this planning diagram is subject to change, it generally provides a preview of expanding data link servi ces in the
next few years. This is added to the AC to enable operators planning upgrades in pace
with future technology and upcoming data link communication services.
Figure 2-12. Data Communication Services Strategy
10/3/17 AC 90 -117
2.19 Data Communication Services Strategy. Segment 1 in Figure 2-12 consists of
two phases .
2.19.1 Tower Services and En Route Services . Segment 1, Phase 2 (S1P2) services will be
delivered in two stages, “initial” services and “full” services. S1P2 en route services are
expected to begin in 2019 and are planned to leverage exis ting Phase 1 FANS 1/A
aircraft and expand Phase 1 infrastructure to deliver CPDLC services in the
U.S. domestic en route airspace. Listed below are en route initial and full services:
1. En R oute Initial Services. The initial services in S1P2 will include
the following:
• Transfer of communications,
• Initial check -in,
• Altimeter settings,
• Altitudes,
• Speed (limited),
• Crossing Restrictions (limited),
• Airborne reroutes/go button,
• Controller initiated reroutes (limited), and
• Direct -to-fix (initial).
2. En Route Full Services. With the continuation of S1P2, en route full services
will include (see the following paragraphs for descriptions of some initial and
full service features ):
• Controller initiated routes,
• Crossing restrictions,
• Direct -to-fix,
• Advisory messages, and
• Holding instructions.
Note: The full services of speed, stuck microphone, adapted arrivals , and beacon
codes are deferred until further notice.
2.19.2 Speeds .
1. Initial Services. The controller can issue UM61 CROSS (position) AT AND
MAINTAIN (altitude) AT (speed).
2. Full Services (Deferred). The controller will be able to:
• Issue speed clearance providing the pilot with instructions to maintain a speed
in Mach number or indicated airspeed,
10/3/17 AC 90 -117
• Assign speeds of greater than or less than specific values , and
• Instruct the pilot to resume normal speed or to maintain present speed. The pilot
will be able to request a speed clearance.
2.19.3 Crossing Restrictions . Initially, the controller will be able to use two crossing restriction
message elements to instruct the pilot to cross a specific fix at a specific altitude and,
if desired, at a specific speed. With full service, the controller will have considerably
more flexibility in composing crossing restriction clearances. For example, the controller
will be able to clear an aircraft to cross a specific fix at a specific time and have the option of entering a crossing restriction.
2.19.4 Routes . Initially, the pilot will be able to DM22 RE QUEST DIRECT TO (position).
The controller will be able to issue route clearances, such as UM74 PROC EED
DIRECT TO (position), UM79 CLEARED TO (position) VIA (r oute clearance),
UM80 CLEARED (route clearance) , and UM83 AT (position) CLEARED
(route clearance). With full service, the controller’s workstation will be enhanced to
support entry from the Radar (R) and Radar Associate (RA ) positions and permit entry
of route offsets with additional message elements.
2.19.5 Advisory . Air Traffic personnel issue advisory messages t o aircraft on a routine basis.
Examples include dynamic airport information (runway closures, runway visual range, braking action, etc.), convective s ignificant m eteorological i nformation (SIGMET),
Cent ral Weather Advisories (CWA), Pilot Weather Reports (PIREP), weather displayed
on the controller’s scope, and current ride reports. CPDLC will allow the controller to send a limited set of advisory messages to the aircraft on a case -by-case basis or to all
aircraft with which the controller has a CPDLC connection. Advisory messages such as SIGMET s and CWAs, which must be broadcast to all aircraft on frequency, will still
need to be verbally broadcast in a mixed equipage environment. However, advisory messages that are issued to individual aircraft, such as dynamic airport information, displayed weather, PIREPS, and current ride reports are excellent candidates for
automating. S1P2 CPDLC services will only support ride reports and free text messages created at the sector. The messages will be provided to the controller to send to the appropriate aircraft. In addition to free ing the controller from verbally delivering the
advisory, CPDLC also allows positive confirmation that affected aircraft have received the information.
2.19.6 Holding Instructions . The controller may be directed to hold all arrivals for a particular
airport. With full service, the controller will be able to send a CPDLC message UM91 HOLD AT (position) MAINTAIN (altitude) INBOUND TRACK (degrees) (direction) TURN LEG TIME (leg type).
2.19.7 Stuck Microphone ( Deferred). With full service, the controller will be able to instruct the
pilot to check their microphones.
2.19.8 Adapted Arrivals ( Deferred) .With full service, the controller and pilot will be able to use
CPDLC to execute adapted arrival procedure. The adapted procedure contains both lateral and vertical aircraft maneuvers and provides greater efficiency for users.
10/3/17 AC 90 -117
2.19.9 Beacon Codes ( Deferred) . As aircraft transition in U.S. domestic airspace from
one facility to another, there is the possibility of beacon code duplication. Often this
happens when there is significant traffic and/or delays in the system. It is also prevalent
at facilities which border foreign airspace. Today, when this conflict occurs, En Route
Automation Modernization (ERAM) will assign the aircraft a new code and notify the controller, who then verbally issues it to the pilot. With CPDLC, the FAA ground
system will automatically send a UM with the new code to the aircraft at the appropriate
time with no controller inv olvement. The controller will also be able to manually
compose and send a beacon code message if needed.
10/3/17 AC 90 -117
CHAPTER 3. AIRCRAFT ELIGIBILITY
3.1 Introduction. This chapter provides guidance on how operators can determine if their
aircraft dat a link system is compliant and el igible for operational use. This AC does not
address design approval or installation of data link systems. For airworthiness guidance,
refer to AC 20-140( ), Guidelines for Design Approval of Aircraft Data Link
Communication Systems Supporting Air Traffic Services ( ATS).
3.2 Aircraft Eligibility. The Airplane Flight Manual (AFM) should identify the following
for data link communication eligibility:
1. Interoperability,
2. Subnetwork, and
3. Aircraft performance.
Note: Descriptions of the data link services are p rovided for a given airspace
or operation. For exam ple, in the United States , departure clearance
(Controller -Pilot Data Link Communication –Departure Clearance
(CPDLC -DCL )) service requires the aircraft to be interoperable with Future Air
Navigation Systems (FANS )-1/A(+), to use either the Very High Frequency
(VHF) Data Link ( VDL ) Mode 0/A or VDL Mode 2 subnetwork, and to not have
any prescribed aircraft performance requirements. Operators should refer to the requirements defined by the Air Traffic Service Unit (ATSU) for each operation.
A summary of typica l operational requirements is provided in Chapter 5
,
Operational Use of Data Link Communications, of this AC.
3.3 Statement of Compliance (SOC). Due to the complexity of the criteria to determine
eligibility, the operator must obtain a statement of compliance from the entity that owns
the design approval for their data link installation. This may be the aircraft manufacturer, the operator, the manufacturer of the data link system, or another party. The statement of complia nce should be provided in the AFM , AFM S upplement , or other acceptable
document . Table C -3
, Preferred Original Equipment Manufacturer Annotation, provides
an example of a statement of compliance. The statement of compliance mus t indicate the
aircraft data link system meets the aircraft -allocated requirements of Required
Communication Performance (RCP) and Required Surveillance Performance (RSP) specifications.
Note: For a FANS 1/A CPDLC and Automatic Dependent Surveillance- Contract
(ADS-C) aircraft system, RTCA DO- 306/European Organization for Civil
Aviation Equipment ( EUROCAE ) ED-122, Safety and Performance Standard for
Air Traffic Data Link Services in Oceanic and Remote Airspace (Oceanic SPR
Standard), is equivalent to RCP 240, RCP 400, RSP 180, and RSP 400 specifications. For an Aeronautical Telecommunication s Network (ATN)
Baseline 1 (B1) or FANS 1/A CPDLC aircraft system, RTCA
DO-290/ED-120,
Safety and Performance Requirements Standard for Air Traffic Data Link
10/3/17 AC 90 -117
Services in Continental Airspace (Continental SPR Standard), provides
performance criteria for the EUR Re gion.
3.3.1 Alternate Means of Compliance for No SOC . In lieu of the SOC stated in the AFM,
AFM Supplement, or other acceptable documentation, operators may provide a detailed
submission to the FAA validating that the aircraft ’s current system meets the RCP /RSP
applicable requirements. As a minimum, this submission should inclu de information on
avionics continuity, integrity, availability , and safety and monitoring/alerting
requirements ( refer to RTCA DO- 306/ED -122). Equipment manufacturer support should
be solicited to acquire suitable documentation.
3.3.2 Interoperability . The opera tor must confirm the interope rability of their aircraft data link
system ( interoperability requirements standards ( INTEROP ) designators are described in
Table 2-2, Interoperability Designators and Descriptions ). The statement of compliance
must indicate the INTEROP and a reference to the definition of that INTEROP. Aircraft
Communication s Addressing and Reporting System (ACARS ) ATS, FANS 1/A,
FANS 1/A+, and ATNB1 INTEROP designators, and/or the compliance statemen t,
must reference AC 20 -140 or later revision. For the ATN Baseline 2 ( B2) INTEROP
designator, the compliance statement must reference AC 20 -140C or later revision.
3.3.2.1 In U.S. domestic en route airspace , for operations supported by FANS 1/A(+)
data link communication systems, the avionics system must have
“push to load” capability into the navigation system whenever a routing
change (e.g., uplink message ( UM)79, UM80, and UM83) is received .
Note: Operators using an alt ernate means of compliance for “push to
load” will not be permitted once full services are implemented.
“Full services ” require fully inte grated (“push to load” ) avionics. For a
description of “F ull Services ,” see Figure 2- 12, Data Communication
Services Strategy .
3.3.3 Subnetwork . The operator must confirm the subnetwork capability of their aircraft
(subnetworks are described in paragraph 2.2.2 ). The statement of compliance must
indicate the subnetworks that are supported and a ref erence to the definition of
the subnetworks. The compliance statement must reference AC 20 -140 or later for any
of the following subnetworks:
• VDL M0/A,
• VDL M2,
• High Frequency Data Link ( HFDL ),
• Inmarsat , and
• Satellite communications ( SATCOM ) Iridium ( Short Burst Data ( SBD )).
Note: For aircraft utilizing Inmarsat (SwiftBroadband ( SBB )), the SOC must
reference AC 20-140C or later.
10/3/17 AC 90 -117
3.3.4 VDL M2 Requirements for U.S. Domestic En R oute. The VDL M2 requirements
include aircraft that are equipped with VD L Mode 2 equipment approved to Technical
Standard Order ( TSO )-C160a , Very High Frequency (VHF) Digital Link (VDL) Mode 2
Communications Equipment, (see Note 1 below for details) or later that is capable
of tuning to more than one VDL M2 channel .
Note 1: Minimum performance standard of TSO -C160 does not include the
capability for the Communications Management Unit ( CMU ) (Avionics
Architecture Class W and Z) or VDL M 2 Radio (Avionics Architecture Class X)
to tune to more than one VDL M2 channel . The above equipment is capable of
tuning to only one VDL M2 channel (i.e ., 136.975 MHz). The m inimum
performanc e standard of TSO -C160 for VDL M 2 Radio (Avionics Architecture
Class V or Y) contains the capability to support V DL M ode 2 multi -frequency
operation when integrated with a CMU (Avionics Architecture Class W and Z)
that supports VDL M 2 multi -frequency according to TSO -C160a .
Note 2: The FAA accepts the us e of VDL M0/A en route when VDL M2
communications are lost, if the aircraft is equipped with a properly functioning
VDL M2 radio before starting the flight or dispatching. An a lternate subnetwork
may be used provided it complies with paragraph 4.6.2. Table C -1, Summary of
Airspace Requirements, provides a summary of airspace requirements.
3.3.5 Performance Data for Compliance. The operator should evaluate the demonstrated
performance of their aircraft data link system as provided by the FAA and other
Air Navigation Services Providers ( ANSP ) as part of the ANSP monitoring programs.
FAA monitoring data is available for initial and continuous compliance and operator data may be acceptable for init ial data link eligibility. Actual Communication s Performance
(ACP) of the CPDLC two -way communications and Actual Surveillance P erformance
(ASP) of the ADS -C are evaluated against respective RCP and RSP specification
standards. This data should be included to quantify support of the aircraft performance
portion of the data link eligibility. If no performance data is available, then initial compliance for applicable ai rspace will be based on the SOC with performance being
monitored as data is collected. (See Chapter
6, Performance Monitoring.)
Note 1: For fleet aircraft, records for every tail number are not necessary provided that
all the aircraft have the same data link communication configuration. Operators with a single aircraft may meet the above requirement using records o f other aircraft with the
same m ake, m odel, and s eries (M/M/S) and the same data link communication
configuration.
Note 2: RCP and RSP performance data is not required for aircraft operating only in
U.S. domes tic airspace.
3.4 Configuration Control. Operators should maintain their aircraft in an avionics
configuration which has been shown to provide acceptable data link communication
performance. A list of recommended avionics is available at
http://dcis.harris.com/new -
operator -documents .
10/3/17 AC 90 -117
3.5 Maintenance. The operator is responsible for all maintenance of data link
communication systems. Maintenance procedures for data link communications are
approved or accepted as part of an operator’s initial maintenance manual approval or as a revision to that manual.
Note: Maintenance facilities conducting Supplemental Type Certificate ( STC)
modifications must coordinate Master Minimum Equipment List
(MMEL )/minimum equipment list ( MEL ) changes that include all data
communications equipment with the Aircraft Evaluation Group ( AEG ).
The Original Equipment Manufacturer ( OEM ) or the holder of installation
approval for the aircraft (e.g., STC holder) must demonstr ate compliance with the
criteria in this AC. An STC for additional installed items must document any applicable MEL relief.
3.5.1 System Alteration ( Including S oftware U pdates) . Operators must evaluate alterations to
the aircraft and identify any changes to aircraft eligibility. The owner of the design approval for the alteration must confirm the alteration did not affect the data link system. If the alteration affected the data link system, the owner of the design must provide a statement of compliance to the as sociated INTEROP, subnetworks and performance
standards. Operators must determine aircraft eligibility after each alteration .
3.5.2 Subnetwork Configuration for Route Coverage . The operator must ensure communication
coverage capability of their aircraft’s subnetwork for the route to be flown (see paragraph
4.1.3 ). For adequate coverage, operators may have to adjust their aircraft’s
media management parameters (e.g. , where the system automat ically switch es from V DL
to SATCOM) . Operators have experienced unacceptable performance transitioning
airspace with marginal VDL coverage because the aircraft tries to maintain or reestablish a VDL connection. Some States may also limit the s ubnetworks that can be used
for operation.
10/3/17 AC 90 -117
CHAPTER 4. COMMUNICATION SERVICE PROVIDERS (CSP)
4.1 CSP for Oceanic and Remote Continental Operations. For oceanic and remote
continental operations using data link communications, operators are responsible for
ensuring their CSP meets the minimum specifications of this chapter. The operator/CSP agreement must include these requirements in addition to monitoring their performance as addressed in Chapter 6
, Performance Monitoring .
4.1.1 Substandard Performance . If a CSP fails to satisfy the allocated requirements,
the operator should not file or use the associated performance standard until the problem
is resolved. An exception is allowed for performance below the 99.9 percent operational
transaction time which permits the operator to continue to operate at the 95 percent
nominal transaction time or greater while investigating the issue for corrective action.
4.1.2 CSP and Operator Arrangements . Operators must ensure the services they have arranged
with the ir CSP(s) include:
1. Failure notification,
2. Recording data link messages,
3. CSP i ntegrity,
4. Compliance with CSP allocations for Required Communication Performance (RCP )/Required Surveillance Performance ( RSP), and
5. Adequate subnetwork coverage for the route flown.
4.1.2.1 Failure Notification. The CSP should notify the operator and any affected
Air Traffic Service Units (ATSU) of any failure condition that may impact data link communication operations (such as coverage or performance).
This includes when a CSP holds an ag reement with an aircraft operator but
not with the affected ATSU.
4.1.2.2 Recording Data Link Messages. The operator should ensure that they have
access to communication and surveillance data sent or received to their
aircraft for at least 30 days. The CSP(s) should retain records for at least
30 days to allow for accident/incident investigation purposes. The operator or CSP should make these records available for air safety investigative
purposes on request .
4.1.2.3 CSP Integrity. The CSP must pass messages without manipulating the
information protected by error detection codes used by the a ircraft system and
the ATSU. In particular, the CSP must not reconstitute or regenerate any of
the error detection codes.
4.1.2.4 RCP Allocation Requirements . The operator must ensure the CSP satisfies
the allocated requirements for any RCP used by the operator. The CSP has two points of demarcation with an ATSU domain consisting of ground router to ground router interface and two signal in space point s of demarcation with
10/3/17 AC 90 -117
aircraft’s data link communication system. The downlink message enters the
CSP domain at the first emission of the first bit of the first frame from the
aircraft’s data link communication system. For uplink message (UM), it exits
the CSP domain at the last emission of the last bit of the last frame to the
aircraft’s data link communication system. The Required Communication
Technical Performance ( RCTP )CSP is the two -way transfer delay from when
a message (e.g. , UM ) is received from the ATSU at the CSP point of
demarcation (e.g. , enters from the ground domain) until its successful arrival
at the CSP ’s signal in space point of demarcation. W hen the message is
answer ed, it arrives at the signal in space CSP point of demarcation and
continues the CSP’s ground router to g round router interface back to the
ATSU. It includes delay such as propagation delay and retransmissions,
as well as subnetwork delays resulting from queueing/flow control,
segmentation, processing, ground -network transmission, routing, etc.
4.2 RCP 240 CSP Al locations. The CSP must meet the performance requirements described
in Table 4 -1, RCP 240 Transaction Time and Continuity Allocations to CSP, and
Table 4- 2, RCP 240 CSP Availability and Outages Parameters, where RCP 240 has been
prescribed on t he routes flown by the operator.
Table 4 -1. RCP 240 Transaction Time and Continuity Allocations to CSP
Transaction T ime Parameter *ET (sec)
99.9% of
messages
less than:
(sec) **TT (sec)
C = 95% of
messages
less than:
(sec) Compliance M eans
RCTPCSP 120 100 Contract/service agreement
terms. See also paragraph 4.1.2.
*ET is Expiration Time
**TT is Transaction Time
Table 4 -2. RCP 240 CSP Availability and Outages Parameters
Availability Parameter Safety Compliance M eans
Availability – CSP (ACSP) 0.999 Contract/service agreement terms
Unplanned outage duration limit (minutes) 10 Contract/service agreement terms
Maximum number of unplanned outages 48 Contract/service agreement terms
Maximum accumulated unplanned outage time
(minutes/year) 520 Contract/service agreement terms
Unplanned outage notification delay (minutes) 5 Contract/service agreement terms
10/3/17 AC 90 -117
4.3 RCP 400 CSP Allocations. The CSP must comply with the performance described in
Table 4 -3, RCP 400 Transaction Time and Continuity to CSP Allocation, and Table 4 -4,
RCP 400 Availability and Outages Parameters, along the route to be flown by the
operator .
Table 4 -3. RCP 400 Transaction Time and Continuity to CSP Allocation
Transaction T ime Parameter *ET (sec)
C = 99.9%
of
messages
less than:
(sec) **TT (sec)
C = 95%
of
messages
less than:
(sec) Compliance M eans
RCTPCSP 280 240 Contract/service agreement terms
See also paragraph 4.1.2.
*ET is Expiration Time
**TT is Transaction Time
Table 4 -4. RCP 400 Availability and Outages Parameters
Availability Parameter Requirement Compliance M eans
Availability – CSP (ACSP) 0.999 Contract/service agreement terms
Unplanned outage duration limit (minutes) 20 Contract/service agreement terms
Maximum number of unplanned outages 24 Contract/service agreement terms
Maximum accumulated unplanned outage time
(minutes/year) 520 Contract/service agreement terms
Unplanned outage notification delay (minutes) 10 Contract/service agreement terms
10/3/17 AC 90 -117
4.4 RSP Allocation Requirements . The operator must ensure the CSP satisfies the allocated
requirements for any RSP used by the operator. The Required Surveillance Technical
Performance (RSTP) CSP is the one -way transfer delay f rom when a message is received at
the CSP’s signal in space point of demarcation until its successful arrival at the other CSP’s ground router to ground router point of demarcation to the ATSU. It includes delay such as propagation delay and retransmissions, as well as subnetwork delays resulting from queueing/flow control, segmentation, processing, ground- network
transmission, routing, etc. Delay is measured from the first bit emission of the first bit of
the first frame/data packet from the aircraft’s Data Link Radio to the last bit exiting the CSP domain when it is received by the ground domain (ATSU).
4.4.1 RSP 180 CSP Allocations . The CSP must comply with the performance described in
Table 4 -5, RSP 180 Data Delivery Time and Continuity Criteria, and Table 4 -6, RSP 180
Availability and Outages Parameters .
Table 4 -5. RSP 180 Data Delivery Time and Continuity Criteria
Data D elivery T ime Parameter *OT (sec)
C = 99.9%
of messages
less than:
(sec) **DT (sec)
C = 95% of
messages
less than:
(sec) Compliance M eans
RSTPCSP 170 84 Contract/service agreement
terms. Pre- implementation
demonstration.
*OT is data overdue time (associated with operational continuity)
**DT is Delivery Time
Table 4 -6. RSP 180 Availability and Outages Parameters
Availability Parameter Safety Compliance M eans
Availability – CSP (ACSP) 0.999 Contract/service agreement terms
Unplanned outage duration limit (minutes) 10 Contract/service agreement terms
Maximum number of unplanned outages 48 Contract/service agreement terms
Maximum accumulated unplanned outage time
(minutes/year) 520 Contract/service agreement terms
Unplanned outage notification delay (minutes) 5 Contract/service agreement terms
4.4.2 RSP 400 CSP Allocations . The CSP must comply with the performance described in
Table 4- 7, RSP 400 Data Delivery Time and Continuity Criteria, and Table 4-8, RSP 400
Availability and Outages Parameters .
10/3/17 AC 90 -117
Table 4 -7. RSP 400 Data Delivery Time and Continuity Criteria
Data D elivery T ime Parameter OT (sec)
C = 99.9%
of messages
less than:
(sec) DT (sec)
C = 95% of
messages
less than:
(sec) Compliance M eans
RSTPCSP 340 270 Contract/service agreement
terms. Pre- implementation
demonstration.
*OT is data overdue time (associated with operational continuity)
**DT is Delivery T ime
Table 4 -8. RSP 400 Availability and Outages Parameters
Availability Parameter Safety Compliance M eans
Availability – CSP (ACSP) 0.999 Contract/service agreement terms
Unplanned outage duration limit (minutes) 20 Contract/service agreement terms
Maximum number of unplanned outages 24 Contract/service agreement terms
Maximum accumulated unplanned outage time
(minutes/year) 520 Contract/service agreement terms
Unplanned outage notification delay (minutes) 10 Contract/service agreement terms
4.5 Alternate Means of Compliance. A Performance- based Communication and
Surveillance (PBCS) Charter is available as an alternate means of compliance to validate
the operator/CSP agreement for performance and services stated in this AC. Operators and CSPs need only to become charter members by following the instructions at
http://www.fans -cra.com/
. Operators who are seeking an Operations Specification
(OpSpec)/Management Specification (MSpec)/Letter of Authorization (LOA) A056, Data Link Communications, authorization and are charter members satisfy their
responsibility of ensuring their CSP meets the minimum specifications of this chapter provided that their CSP is also a charter member. Charter members using this alternate means of compli ance must remain as charter members or notify their responsible Flight
Standards office of their change in status.
Note: A change of charter membership status will affect operational
authorization.
4.6 CSP for U .S. Operations. The FAA provides Very High Frequency (V HF) Data Link
(VDL ) Mode 2 for all data link operations within the domestic U nited S tates (except
oceanic and remote continental areas, which fall under paragraph 4.1). In addition,
the FAA h as authorize d the use of VDL M0/A for CPDLC -DCL application. Operators
10/3/17 AC 90 -117
can use the VDL Mode 2 subnetwork or may par ticipate in CPDLC -DCL using
VDL M0/A with no additional responsibilities. If the operator ’s aircraft is equipped with
a properly -functioning VDL M2 radio before start ing the flight or dispatching , the FAA
accept s the use of VDL M0/A en route when VDL M2 communications are lost .
4.6.1 Initial CSP Qualification . A CSP planning to offer an alternate subnetwork for data link
communications in the United States should contact the FAA Data Communications
Program Office . The CSP need s to provide substantiating information to demonstrate
their subnetwork satisfies the re quirements allocated t o the CSP and will need to enter
into an agreement with the FAA on the sharing of data, notification of outages, security
of communication, and other detailed characteristics. For further information refer to the
Data Communication s Network Services (D CNS ) Alternative Media Description .
4.6.2 Alternate Subnetworks . The FAA allows operators to select an alternate subnetwork
other than VDL M2, provided the subnetwork satisfies the required performance
allocation and the operator/CSP enters into an agreement to ensure the performance is achieved and maintained. The FAA identifies accepted alternate subnetworks by listing on the Performance- Based Flight Systems Branch (AFS -470) Data Communications
(DataComm)
website . CSPs will be notified of changes to this list. CSPs must comply
with the alternate media performance specifications for VD L Mode 2 shown in Table 4- 9,
Data Communications Network Services (DCNS) Performance Baseline.
10/3/17 AC 90 -117
Table 4 -9. Data Communication s Network Services (DCNS) Performance Basel ine
Performance Metric System Requirements
Packet Error Rate (Network Service) 10(-5)
Availability – Reliability, Maintainability,
and Availability (Network Service) 0.9999
Mean Time Between Outages (MTBO) –
Reliability, Maintainability, and Availability
(Network Service) 1,344 Hours
Network Service Restoral Time – Reliability,
Maintainability, and Availability 30 Seconds *
En Route Capacity 0.0010 bps per km3
One-Way Latency at 95% (uplink or downlink) < 10 sec
One-Way Latency at 99% (uplink or downlink) < 45 sec
*Reliability, maintainability, and a vailability restoral time applies except for catastrophic
processor fail ures and force major events, in which case the maximum restoration time must be
within 3 minutes.
4.6.3 Operator Agreement with CSP . Operators using an alternate subnetwork qualified by the
FAA have similar responsibilities as when using data link communications for oceanic
and remote continental operations. The CSP must meet the specifications in
paragraph s 4.6.3.1 through 4.6.3.3 .
4.6.3.1 Transfer Delay.
1. The CSP uplink transfer delay m ust be less than or equal to
10 seconds for 95 percent of all ATSU data messages.
2. The CSP downlink transfer delay must be less than or equal to 10 seconds for 95 percent of all ATSU data messages .
3. The CSP uplink transfer delay m ust be less than or equal to
45 seconds for 99 percent of all ATSU data messages .
4. The CSP downlink transfer delay m ust be less than or equal to
45 seconds for 99 percent of all ATSU data me ssages.
4.6.3.2 Data Integrity . The Packet Error Rate at the CSP Network Service Delivery
Point (SDP) must be less than 1x10
-5. The packet error rate is the number of
incorrectly received data packets divided by t he number of received packets.
A packet is declared incorrectly received if at least one bit is erroneous or if it
is delivered to an incorrect recipient. This metric excludes packets lost in transmission due to connection failure or excessive latency, as those are accounted by other metrics.
10/3/17 AC 90 -117
4.6.3.3 Reliability, Maintainability, and Availability. The reliability,
maintainability , and availability performance requirements presented in this
section apply to the specific CSP subnetwork seeking qualification and should not take into account the availability of additional subnetworks in order to achieve the required performance levels. A network service thread includes all equipment between the CSP SDP and aircraft users, excluding any aircraft
components. This would include the relevant emitting or receiving ground station antenna(s) as well as transmitting/receiving the necessary radio
frequency ( RF) signal levels across the entire ordered service v olume
in question. Signal levels need to account for terrain impacts, as applicable to
the service volume in question. For the purposes of availability, utilization of
diverse ground station sites and other means of redundancy are included to provide the required level of availability for the ordered service volume.
1. The service availability for each network service thread must be
at least 0.9999.
2. The minimum calculated service availability must be measured over the latest 12 -month period. Availability is calculated
as follows:
•
Available Time : Total time during the latest 12 -month period the
service was under contract.
• Total Outage Time: T he total unapproved service interruption
or degradation time during the Available Time. It includes any unapproved degradation in which the service failed to meet all performance requirements of this specification. It includes any length of time exceeding the duration of a FAA-approved interruption
or degradation.
4.7 CSP Monitoring. For oceanic and remote continental operations and for the use of alternate subnetworks for U.S. data communications, the operator must be aware of their CSP performan ce. The operator and CSP agreement should address performance
monitoring and the performance data as necessary to remain in compliance.
4.7.1 U.S. Domestic Data Communications . If the CSP performance fails to satisfy the
allocated requirements, the FAA will notify the CSP and operators . In this case,
the alternate subnetwork authorization for operations is suspended and the operator
should not file or use the associated perf ormance standard (if prescribed) until the FAA
indicates the alternate subnetwork performance is compliant.
10/3/17 AC 90 -117
CHAPTER 5. OPERATIONAL USE OF DATA LINK COMMUNICATI ONS
5.1 Operational Use.
5.1.1 Application Process . Operators must contact their principal operations inspector ( POI)
to begin the application process for an OpSpec/MSpec/LOA A056 authorization.
A compliance guide is available at: https://www.faa.gov/about/office_org/headquarters
_offices/avs/offices/afx/afs/afs400/afs470/datacomm /. This guide expedites the
compliance process as it condenses into one location the information required for
data link operations.
5.1.2 Minimum Equipment List (MEL) and Master Minimum Equipment List (MMEL) .
MEL s and MMELs must include any revisions necessary f or data link communication
operations. These provisions must be approved by the FAA . Operators must specify the
required dispatch conditions. A sample MEL is provided in Appendix B, Data Link
Communications Minimum Equipment List ( MEL ) and Master Minimum Equipment List
(MMEL ) Provisions .
5.1.2.1 MEL procedures, limitations , and requirements should consider the system
as a whole and also may consider subf unctions and other system
interdependencies. Communications Mana gement Unit ( CMU ) inoperative
may render all Controller -Pilot Data Link Communication ( CPDLC ) virtually
inoperative, while loss of Very High Frequency (VHF) Data Link ( VDL )
Mode 2 ( M2) may render the system una cceptable for KUSA domestic
but may be acceptable for en route oceanic operations provided satellite
communications ( SATCOM ) or alternate media is available and m eets
performance requirements. Other systems with inter -relations such as Global
Positioning System ( GPS) function inoperative may not affec t CPDLC
operations, but depending on airplane design may affect Future Air Navigation Systems (FANS ) Automatic Dependent Surveillance- Contract
(ADS -C) operations. MMEL and Operator MELs should consider all
functions and system relationships to the greatest extent possible.
5.1.2.2 For operations where communication equipment is required to meet a Required Communication Performance ( RCP )/Required Surveillance
Performance ( RSP) specification, the perf ormance must be included in
the MEL.
5.1.3 Flight Plans . Dispatchers and pilots intending to conduct operations using data link
communication must file an accurate flight plan (see Appendix D, Flight Planning ).
Air Traffic Service Unit (ATSU) automation relies on correct fligh t plan codes to
determine aircraft and operator data communication eligibility for various services (e.g., reduced separation). If operators defer data link equipment before flight, a new
flight plan must be filed reflectin g the revised capability codes. T he flight plan must
always accurately reflect the aircraft’s current capabilities .
10/3/17 AC 90 -117
Note: Part 91 operators filing “J” codes for U.S. domestic data link services must have
a data link authorization to file J5 –J7 in oceanic and remote continental airspace
(see Appendix D ).
5.2 Data Link Operational Guidance. Pilots must be proficient with the equipment and
procedures used for data link communication. Training must be based on operati ng
guides from the manufacturer or approved oper ational procedures for operators with a
FAA certificate . The NAS Data Communication s Guide is available to provide general
data communication procedure guidance in the United States but is not a substitute for
Original Equipment Manufacturer ( OEM )/Airplane Flight Manual ( AFM ) procedures.
For international operations, operators should reference International Civil Aviation
Organization (ICAO) Doc 10037 , Global Operational Data Link (GOLD) Manual ,
ICAO Doc 9869 , Performance- Based Communication and Surveillance (PBCS ) Manual ,
and state Aeronautical Information Publication s (AIP).
5.2.1 Crew Resource Management (CRM) . When operating aircraft with more than one pilot,
the pilot flying and pilot monitoring (not flying) should individually review each CPDLC
uplink message (UM) prior to responding to and/or executing any clearance and
individually review each CPDLC downlink message (DM) prior to transmission. Reading
a message individually is a key element to ensuring that each pilot does not infer any
preconceived intent different from what is intended or appropriate. Reading the message
aloud would bias the other pilot and could lead t o the error of “ reading ” what was read
aloud as opposed to what was actually displayed.
5.2.1.1 UMs. Some UM s, such as complex or conditional clearances, require special
attention to prevent the pilot from responding to a clearance with ROGER (DM3)/ WILCO (DM0) but not complying with that clearance. To minimize
errors, when responding to a clearance with ROGER (DM3) /WILCO (DM0),
each pilot should read the UM individually (silently) before initiating a
discussion about whether and how to act on the message.
5.2.1.2 DMs. In a similar manner, each pilot should individually review CPDLC DM s
before the message is sent.
5.3 Logon /Notification .
5.3.1 Departing U.S. Domestic Airports . The logon/notification should be approximately
30 minutes prior to proposed departure time. Pilots should maintain KUSA until logged off/disconnected by air traffic control ( ATC ). If leaving U.S. domestic airspace,
the automatic transfer from KUSA to the next data authority (NDA) may not be possible.
In such cases, the pilot must terminate the CPDLC connection(s) and then initiate a
logon/notification to prompt the new Current Data Authority (CDA) to establish a
CPDLC connection.
Note: Intermittent NO COMM annunciations may occur and do not necessarily
mean the ATC connection is lost. Pilots should delay logging off/ disconnecting to
allow the annunciat ion to end as the system may re establish the connection.
10/3/17 AC 90 -117
Logging off/d isconnecting and logging back on/notifying will cause the ATC
connection to end and may block future connections.
5.3.2 Blocked List . In rare instances for security and safety reasons, an aircraft may be blocked
from any logon /notification attempt until it is manually removed by the Flight Data
Communication s Specialist (FDCS). This occurs automatically via the system or
manually by the FDCS. The following reasons may cause an aircraft to be blocked from
logon/notification :
1. Number of logon/notification attempts received from an aircraft exceeds the
maximum allowable number within the adapted time period. This is to prevent denial of service attacks against the data link communication service.
2. Suspected duplicate aircraft registration. This is to prevent messages which are addressed by aircraft registration from going to the wrong aircraft.
5.3.2.1 Pilot Action. The pilot experiencing a blocked logon/notification should
either contact clearance delivery or their Aeronautical Operational Control (AOC) to resolve the issue.
5.3.3 Outside Data Link Airspace. The pilot should initiate a logon /notification
10 to 25 minutes prior to entry into airspace where data link communication services
are provided or prior to entering oceanic and remote continental airspace .
Note: Departing from a foreign airport close to or within oceanic and remote
continental airspace may require t he logon/notification to be initiated prior to
departure.
5.3.4 Required Data for Logon /Notification . To perform an initial logon/notification request,
the pilot enters the four character ICAO identifier of the ATSU and enters/verifies the
following flight -speci fic information:
1. Aircraft identification (same as item 7 of the flight plan);
2. Aircraft registration , if applicable, and/or aircraft address (same as item 18 of
the flight plan); and
3. Departure and destination airports, when requi red (same as items 13 and 16
of the flight plan).
Note 1: When the aircraft identification inc ludes a numeric component,
this component must exactly match what is listed on the flight plan.
In other words, “ABC3” does not match “ABC003.”
Note 2: While the ATSU identifier is only four characters, Aer onautical
Telecommunication s Network ( ATN ) Baseline 1 (B1) is capable of supporting up
to eight characters.
Note 3: If applicable, ensure ADS -C is on or armed prior to logon/notification .
10/3/17 AC 90 -117
5.3.5 Data Must Match Flight Plan . To avoid an automatic reje ction of the logon/notification
request, the pilot must ensure the flight -specific information entered into the aircraft
system is the same as the corresponding details filed in the flight plan.
5.3.6 Possible Reasons for Failed Logon/Notification . The following are possible reas ons for
receiving an indication of logon/notification failure :
1. Logon /Notification information does not exactly match flight plan
(e.g., incorrect tail number and/or call sign/flight ID) ;
2. Ground or air system anomaly ;
3. Data corruption;
4. Suspected duplicate ai rcraft registration ;
5. Aircraft intentionally blocked from logging on /notifying (i.e., on blocked l ist
due to problem reports with the aircraft) ; and/or
6. There is no flight plan for the flight or the flight plan did not transfer from
one ATSU to the next .
5.3.7 Failure of Data Link Communication Connection. When failure of a data link
communication connection is detected (downlink message fails to send) , the pilot should
terminate the connection and then initiate a new logon /notification with the current
ATSU. If another failure occurs, revert to voice communication.
5.3.8 Logon /Notification Response . The logon/notification response message provides
information to the aircraft system concerning whether:
1. The logon/notification request was successful (e.g. , could be correlated with a
flight plan); or
2. The logon/notification request was unsuccessful (e.g., could not be correlated
with a flight plan).
5.4 En Route. Normally, response to CPDLC messages should be via CPDLC and response
to a voice message should be via voice. Howeve r, if a CPDLC message is unclear or
conflicting, always clarify with voice and then close the CPDLC dialog .
5.4.1 Contact or Monitor Message . A CONTACT (UM117) or MONITOR (UM120) message
instructs the pilot to change to the specified frequency and may include a position or time
for when to change to the new frequency. Use of a CONTACT or MONITOR message is as follows:
1. When a MONITOR (UM120) message is received, the pilot should change to
the specified frequency upon receipt of the instruction or at the specified time or position. The pilot should not establish voice contact on the frequency.
10/3/17 AC 90 -117
2. When a CONTACT (UM117) message is received, the pilot should change to
the specifi ed frequency upon receipt of the instruct ion or at the specified time
or position, and establish voice contact on the frequency.
5.4.2 Waypoint Sequencing . The pilot should ensure waypoints are sequenced correctly. If an
aircraft passes abeam a waypoint by a dis tance greater than the aircraft f light
management s ystem ( FMS ) waypoint automatic sequencing parameter, the pilot should
manually sequence the waypoints in the FMS . If the pilot does not sequence the
waypoints, incorrect information will be contained in AD S-C repo rts and CPDLC
position reports; the next waypoint in these reports will actually be the waypoint that the
aircraft has already passed. This may result in a timing error or out of conformance
indication on the Air Navigation Services Providers ( ANSP ) ground system .
5.4.3 Multi- Part Messages . If pilots are unable to comply with a ny portion of a multi- part
message, “ UNABLE ” (DM1) the entire message. Additionally, pilots should avoid
sending multiple requests to the ATSU in a single message.
5.4.4 CPDLC Connection Failure . If a CPDLC dialogue is interrupted by a data link service
failure, expect the controller to recommence the entire dialogue by voice communication.
When the controller recognizes a failure of the CPDLC connection, the controller will instruct the pilot to terminate the connection and t hen initiate another logon /notification .
See Table 5- 1, CPDLC Connection Failure Responses, for the voice phraseology in
response to a connection failure .
Table 5- 1. CPDLC Connection Failure Responses
Controller/Pilot Response
Controller (or radio operator) CPDLC FAILURE.
DISCONNECT CPDLC THEN LOGON TO
[facility designation]
Pilot DISCONNECTING CPDLC WITH
[facility designation]. LOGGING ON TO
[facility designation]
Note: Additional voice phraseology is available in Appendix E, Voice
Phraseology .
5.5 Voice Monitoring. Pilots must continuously monitor VHF or high frequency (HF)
as appropriate and/or maintain a Selective- Calling System (SELCAL) watch.
5.5.1 Pilot Response . As with voice communication, pilots should respond as soon as possible
to all data link communication messages (e.g. , ROGER (DM3)/WILCO (DM0),
UNABLE (DM1) , or STANDBY (DM2 )). If more time is needed to make a decision and
respond, select standby (“STBY” ).
10/3/17 AC 90 -117
5.6 Free Text Messages . Free text messages should only be used when a standard message
element does not exist or is inadequate. When sending a free text message, use standard
ATSU phraseology and avoid using non- standard abbreviations. (See Appendix E .)
Note 1: For FANS 1/A implementations, the pilot cannot respond to the free text
message element with ROGER (DM3)/ WILCO (DM0) , UNABLE (DM1) , or
STANDBY (DM2).
Note 2: When the controller uses free text to ask the crew affirmative/negative
questions, the pilot can only respond with ROGER (DM3)/WILCO (DM0), which
means they have read and understood the message, but does not answer the
question affirmatively. In these cases, the pilot should respond to the question
with a separate message ( see Appendix E).
5.7 Data L ink Communication Failures. The pilot must notify the ATSU as soon as
practical of any indications of degraded performance resulting from a failure or loss of connectivity in accordance with 1 4 CFR part 91, § 91.187
. For example, reportable
events include :
1. When operating outside of VHF coverage area and the SATCOM data link communication system fails; and
2. When operating in airspace where ATSU surveillance services are provided and the VHF data link communication system fails.
Note: Timely notification is appropriate to ensure the ATSU has time to assess
the situation and apply a revised separation standard, if necessary.
5.7.1 Failure of Automatic Transfer . If an automatic transfer of the CPDLC connection does
not occur at the boundary (CDA to NDA) , the pilot should contact the transferring ATSU
by sending a CPDLC TRANSFER FAILURE (DM 67) message or voice equivalent,
advising them the transfer has not occurred. If this does not resolve the situation, the pilot
should logoff/ disconnect and logon/notify the NDA. Revert to voice if still unable to
logon/notify NDA.
5.7.2 Actions and Phraseology for Data Link Communication Failure . In the event of an
aircraft data link communication system failure, the pilot should revert to voice and
notify the ATSU of the situatio n. For example, for a CPDLC failure, the pilot should use
the voice phraseology , “CPDLC failure, continuing on voice ,” as shown in Table E-1,
Voice Phraseology R elated to Controller -Pilot Data Link Communication (CPDLC )
From Pilot. The pilot continues to use voice until the functionality o f the aircraft system
can be reestablished.
5.8 ADS -C. Normally, the pilot should leave ADS -C armed for the entire flight. Howe ver,
in airspace where ADS -C is available, if the pilot switch es ADS -C off for any reason,
or they receive indication of avionics failur e leading to loss of ADS -C, the pilot should
advise ATC an d follow alternative procedures.
10/3/17 AC 90 -117
5.8.1 Airspace W here ADS -C Is Not Available . In airspace wh ere ADS -C is not available,
the pilot may sw itch ADS -C off to cancel inadvertent ADS -C connections. In such cases,
the pilot should ensure the ADS -C is armed when reentering airspace where ADS -C is
again available.
5.8.2 Emergencies . The pilot may activate the A DS-C emergency mode, which changes all
existing ADS -C periodic contracts from normal mode to emergency mode and creates
emergency mode ADS -C periodic contracts on any ADS -C connections that do not have
a perio dic contract already in place. The pilot may also activate ADS -C emergency mode
by sen ding a “MAYDAY MAYDAY MAYDAY ” (DM56) or “PAN PAN PAN” (DM55)
CPDLC message. ADS -C emergency mode may be deactivat ed by the ATSU or by the
pilot sending a “CANCEL EMERGENCY” (DM58) CPDLC message. In emergencies,
pilots may revert to voice communication when able.
5.9 Exiting CPDLC and ADS -C Areas. The ATSU should automatically logoff/ disconnect
data authority approximately 15 minutes after exiting CPDLC and/or ADS -C areas.
After 15 minutes, if aircraft equipment permits, the pilot should ensure there are no active
CPDLC or ADS -C connections. Ensuring connections are not active eliminates the
possibility of inadvertent or inappropriate use of the connections.
5.9.1 Contact Current ATSU . The pilot should contact the current ATSU unit prior to the
manual termination of an y ADS -C contract. This applies even when outside the
applicable ATSU and the pilot logs off/disconnects ADS -C because it did not
logoff/ disconnect 15 minutes after leaving ADS -C airspace.
5.9.2 Connection Termination Failed. In the event the connect ion termination has failed,
the pilot should contact the ATSU via voice or any other appropriate means.
5.10 Logoff/ Disconnect . Prior to logoff/ disconnect , the pilot should ensure there are
no unresolved or open messages. The pilot will logoff/disconnect and confirm CPDLC
connection is terminated and continue with voice communication.
Note: Pilots should wait at least 10 minutes after landing before initiating a
CPDLC -Departure Clearance ( DCL ) logon /notification to ensure En Route
Automation Modernization ( ERAM ) and Tower Data Li nk Services ( TDLS ) have
enough time to clear previous flight information.
5.10.1 U.S. Domestic Logoff/ Disconnect . Logoff /disconnect s hould automatically occur
approximately 5 minutes after departure for DCL services . Do not logoff /disconnect until
ATC terminates the session . If proceeding to international or oceanic and remote
continental airspace and CPDLC services are not terminated, then manually
logoff/disconnect prior to a new logon/ notification .
Note: When KUSA is active as the domestic U.S. single data authority, CPDLC
services will not automatically terminate after departure. Aircraft leaving
U.S. airspace must logon /notify the next appropriate NDA.
10/3/17 AC 90 -117
5.10.2 International and Oceanic and Remote Continental Logoff /Disconnect . The ATSU should
automatically logoff/ disconnect data authority approximately 15 minutes after ex iting
CPDLC and/or ADS -C areas.
Note: For transitions between data link communication systems (i.e. , FANS
to ATN), f ollow OEM procedures for logon/ notification/logoff/ disconnect
requirements spe cific to your avionics system.
10/3/17 AC 90 -117
CHAPTER 6. PERFORMANCE MONITORI NG
6.1 Performance Monitoring. With the implementation of performance based systems,
monitoring of those systems ensure s compliance. Monitoring provide s a higher level of
confidence the operational system will cont inue to meet the Required Communication
Performance ( RCP )/Required Surveillance Performance ( RSP) specification. Operators
should incorporate a performance monitoring process and must participate in
performance monitoring which includes repo rting and addre ssing problems. The goal of
monitoring data link communication performance is to:
• Maintain safe and efficient operations;
• Determine continued compliance and interoperability ;
• Investigate problems; and
• Share lessons learned.
Note: There are no established RCP/RSP standards in U.S. domestic airspace as
of the publication date of this AC. As Controller -Pilot Data Link Communicatio n
(CPDLC) is introduced into en route operations for U.S. domestic a irspace,
RCP standards will be published.
6.2 Oceanic and Remote Continental Airspace.
6.2.1 FAA Data Collection . The FAA , along with other Air Traffic Service Unit s (ATSU) , has
been monitoring CPDLC a nd Automatic Dependent Surveillance- Contract (ADS -C)
transactions since 2009. Analysis of Actual Communication s Performance ( ACP) for the
CPDLC transactions and Actual Surveillance Performance ( ASP) for the ADS -C
downlink messages (DM) are accomplished on a semi -annual basis with an emphasis on
the nominal continuity (95 percent ) requirements associated with safety .
6.2.2 RCP Performance Analysis . Data analysis of ACP, including the Actual Communication
Technical Performance (AC TP), is compared against RCP standards (see Tables 2-4
through 2-9) to de termine whether the C PDLC performance is adequate.
6.2.3 RSP Performance Analysis . ASP is compared against RSP standards ( see Tables 2-10
through 2-15) to determine whether surveillance performance is adequate. ASP analysis
is based on the calculation of delivery time of the ADS -C periodic and event reports
between the aircraft and the ATSU ground system.
6.2.4 Evaluating Operational and Nominal Transaction Times . ACP and ASP are evaluated
using operational (99.9 percent ) and nominal (95 percent ) continuity criteria . Observed
ACP and ASP must meet or exceed the nominal 9 5 percent continuity requirements .
Note 1: If ACP/ASP does not meet the nominal continuity, the operator will be
notified and should not continue data link operati ons at the associated
performance level until the issue is resolved (see paragraphs 6.4 and 6.5 ).
10/3/17 AC 90 -117
Note 2: If ACP /ASP does not meet the operational continuity 99.9 percent ,
the operator is notified to investigate and initiate corrective action . The nominal
performance 95 percent is still sufficient for data link communication
performance.
6.3 Performance Website. Operators may obtain a Pass/Fail/insufficient data monitoring
performance report for their aircraft from the FAA Performance -based Communication
and Surveillance (PBCS) Monitoring website .
6.4 Substandard Performance. Operators must address substandard performance whether
the source of that report is from the operator’s own monitoring process, Communication
Service Provider ( CSP), FAA, or a foreign authority . Operators can view aggregate
performance observed within FAA oceanic airspace from the PBCS monitoring website in the above paragraph. If the result of the report is “Fail ,” the operator should follow the
directions on the website to request further details and a corrective action plan. With a
“Fail” report , operato rs may continue to operate at a less stringent performance level
(i.e., RCP 240 to RCP 400) provided they file the appropriate performance flight plan
designator.
6.5 Corrective Aircraft Action. The operator may return to the performance stated in their
statem ent of compliance ( SOC ) provided the corrective action plan is completed.
6.6 Data Link Performance Eligibility. As stated in paragraph 3.3.5
, RCP and RSP
performance monitoring data should be included to quanti fy data link eligibility.
If performance monitoring data is insufficient , then the SOC will be the initial basis
for compliance with continued monitoring.
6.7 Procedures to Report Problems. The operator should establish procedures to report
problems to the regional PB CS monitoring entities identified in Aeronautical Information
Publication s (AIP) (or eq uivalent publications) associated with the route of flight on
which the problem occurred ( see Chapter 8, Reports ).
6.8 Performance Monitoring in U.S. Domestic Airspace. Reserved .
10/3/17 AC 90 -117
CHAPTER 7. TRAINING
7.1 Training Documentation.
7.1.1 Part 91 Operator Training . Part 91 operators must be proficient with the procedures and
operations associated with the use of data link communication systems in accordance
with their Airplane Flight Manual (AFM) and AFM Supplement if applicable. Part 91
operators should be knowledgeable with the procedures and operations as shown in paragraphs
7.4 and 7.5 .
7.1.2 Parts 91 Subpart K (Part 91K), 121, 125, and 135 Operator Training . Part 91K, 121, 125,
and 135 operators should have a training p rogram addressing the operational practices,
procedures , and training items related to data link communication operations (e.g., initial,
upgrade, or recurrent training for pilots, operational control personnel, and maintenance personnel). If criteria for training or checking are other than as specified in this AC,
the criteria may be found in Flight Standardization Board (FSB) reports applicable to a
particular aircraft type.
Note: A separate training program is not required if data link communication
training is integrated in the current training program. However, the applicant must identify the training elements from this AC within the existing training program.
7.2 Objectives. Operators should include the following objectives to ensure appropriate pilot
data link communications qualification:
• Provide necessary pilot knowledge of data link performance -based communication
and surveillance concepts, systems, procedures , and ski lls to properly respond to
data link communication clearances and advisories; and
• Identify human factor issues specific to pilot operation and interaction with the
communication software, hardware, and operating environment (e.g., head- down
time, situational awareness, or loss of pilot response time in the Required
Communication Performance ( RCP ) specification).
7.3 Ground and Flight Training.
7.3.1 Pilot Knowledge/Training . Parts 91K, 121, 125, and 135 operators should maintain
training syllabi (e.g., initial, upgrade, or recurrent) and other appropriate materials
including operational practices and proce dures. Training for other personnel must be
included where appropriate (e.g., operational control personnel or maintenance).
7.3.2 Pilot Training . Parts 91K, 121, 125, and 135 operators should ensure their process
contains training for pilots on equipment requir ements, normal and non- normal
operations and procedures, and limits of their data link communication capability. Pilots must receive data communications training specific to the avionics suite they will
be operating. A common type rating does not guarantee the pilot has received training on the data communications equipment installed on a particular aircraft.
10/3/17 AC 90 -117
7.3.3 Regulatory Basis . All training must be in accordance with the following where
applicable:
1. Part 91 K:
• § 91.1073 , Training P rogram: General.
• § 91.1081 , Crewmember Training R equirements.
• § 91.1111 , Maintenance T raining.
2. Part 121:
• § 121.375 , Maintenance and Preventive Maintenance Training P rogram.
• § 121.401 , Training P rogram: General.
3. Part 135:
• § 135.323 , Training P rogram: General.
• § 135.329 , Crewmember Training R equirements.
• § 135.433 , Maintenance and P reventive M aintenance T raining P rogram.
7.4 Pilot Knowledge Subject Areas. The minimum following subjects should be addressed
in an approved curriculum of data link communications academic training during the
initial introduction of data link communication systems:
1. Normal pilot response to data link communication messages to include :
ROGER ( downlink message ( DM) 3)/WILCO (DM0), UNABLE (DM1),
or STANDBY (DM2) of a data link communication message;
2. Message elements in the message set used in each environment ( e.g., ground,
oceanic, en route) i ncluding terms, abbreviations, and conventions ;
3. RCP/ Required Surveillance Performance ( RSP) specifications and their
performance requirements;
4. Data link communication terminology (e.g., Controller -Pilot Data Link
Communicatio n (CPDLC ) and Automatic Dependent Surveillance- Contract
(ADS -C) reporting contracts);
5. Chart depictions of data link communication services ;
6. Implementation of reduced separation with associated data commu nication
system requirements to comply with RCP 240 and RSP 180 or other possible
performance requirements associated with their routes;
7. Data link communica tions system theory (relevant to operational use);
8. Operations involving data link communication services;
9. Nominal and unacceptable performance;
10. Normal and non- normal use;
11. Data link communication events and reporting ( see Chapter 8 , Reports );
10/3/17 AC 90 -117
12. AFM and AFM Supplement limitations;
13. Crew Resource Management (CRM) of independent message verification,
discussion, and action ( see paragraph 5.2.1 );
14. Minimum e quipment l ist (MEL), deferrable items , and procedures;
15. Human factors specific to the operating environment and operation of installed communication equipment ; and
16. Proper use of flight plan designators for data link operations in U.S. domestic
airspace and , if applicable , in oceanic and remote continental airspace.
Note: For subsequent ground training, only the new, revised, or emphasized items
need be addressed.
7.5 Pilot Procedural Training Items. As a minimum, p rocedural training should include:
1. Proper use of data link communication controls, procedures, and limitations .
2. Logon /notification procedures and reestablishing system operation after loss
of network logon/notification .
3. Display features .
4. Weather deviations, offsets , and waypoint sequencing .
5. Advisories and annunciation.
6. Timely and correct responses to data link communication failures .
7. Recognition of data link communications system failures and data link communication issues unique to the air carrier or operator.
8. Appropriate interaction with the Air Traffic Service Unit (ATSU) following
data link communication messages that are not acceptable.
9. CRM. Independent message verification, discussion, and action
(see paragraph 5.2.1) .
10. Understanding, a ccepting, receiving, rejecting, or canceling messages .
11. Storing and retrieving messages .
12. Loading messages into appropriate controls/displays for use (e.g., f light
management s ystem (FMS)) formulating and sending messages .
13. Departures and departure t ransitions are not included in the loadable r oute
uplink and must be manually entered by the pilo t into the FMS when provided
in the Departure Clearance ( DCL ). Refer to the
NAS Data Communication s
Guide .
14. Loading message requests from the FMS (e. g., flight plan waypoints into
data link communication for transmission , if applicable) .
15. Managing the communications systems .
16. Establishing and terminating system operation .
10/3/17 AC 90 -117
17. Switching use of Radio Frequency (RF) media (if this i s a pilot -controllable
featur e).
18. Items particular to an air carrier’s implementation or the uniqueness of its
aircraf t capability and/or procedures .
19. Applicable message sets, expected transmission times, failure annunciations, constraints, and limitations .
20. CRM in responding to data link communication exchanges .
21. Data link communication modes of operation.
22. Normal and non- normal pilot operating procedures.
23. Conditional clearances and the adherence to certain conditions or restrictions such as changing a flight level based on a time or pl ace.
7.5.1 Credit for Training . Operators may receive credit for existing data link communications
training already approved in a different application. For example, an operator may
receive credit for training based on previous use of data link communication services,
such as on different routes, for a different type of operation, or training conducted by another operator (except for part 121 or 135) , training center, or manufacturer.
The principal operations inspector ( POI) will determine whether and how much cr edit
an operator should receive, considering whether the training is used in another
FAA -approved application and whether the operator has demonstrated the training is
relevant to the new application.
7.5.2 Pilot Currency . Once pilots have completed initial data link communication training ,
pilot currency programs/training should include data link communication elements.
7.6 Dispatcher Training . An aircraft dispatcher, flight follower , or other operational control
personnel should not be assigned to duty unless he/she has demonstrated satisfactory
data link communication knowledge to the operator . Training should include:
• Proper use of flight plan designators (see Appendix D, Flight Planning);
• ATSU separation criteria and procedures;
• MEL remarks or exceptions based on data link communications;
• Procedures for transitioning to voice communication and other contingency
procedures related to the operation in the event of abnormal behavior of the da ta link
communication services;
• Coordination with the ATSU related to or following a special data link
communication exceptional event; and
• Contingency procedures to transition to a different separation standard when data link
communication servi ces fail.
10/3/17 AC 90 -117
7.7 Maintenance Training. Operator s should ensure all maintenance personnel receive
training on their airplane’s data link communication equipment. Operators unsure of
required maintenance procedures for data link communication- related equipment should
contact their aircraft manufacturer field service representatives .
10/3/17 AC 90 -117
CHAPTER 8. REPORTS
8.1 Introduction. Operators and manufacturers must develop reporting procedures to ensure
effective identification, tracking , and followup of data link-related events. P rocedures
should provide the following to the R egional M onitoring A gency (RMA).
• Proper assess ment of data link communication events; and
• Specific data link communication events as necessary .
8.2 Common Reasons to Report. Common reasons for submitting a problem report are:
1. Failure to log on /notify ,
2. Logoff/d isconnect,
3. Corrupted messages, and
4. Excessive delay.
8.3 Oceanic and Remote Continental Problem Reporting. For Future Air Navigation
Systems (FANS ) 1/A(+) p roblem reporting i n oceanic and remote continental airspace,
notify the FANS Central Reporting Agency (CRA) at http://www.fans -cra.com/ . This site
is maintained by Airways New Zealand as a service to the global FANS community and
includes the:
• International Civil Aviation Organization (ICAO) North Atlantic (NAT) Data Link
Monitoring Agency (DLMA),
• Informal South Pacific ATS Coordinating Group (ISPACG) CRA,
• Informal Pacific ATC Coordinating Group (IPACG) CRA, and
• FANS Inter operability Team (FIT) Asia CRA.
8.4 U.S. Domestic Airspace Problem Reporting . For data link communication problems
in U.S. domestic airspace , an Operational Problem Report (OPR) should be filed with
the FAA by downloading the Data Comm Operational Problem Report Ticket .
The completed information should be faxed or emailed as shown on the form. Harris
Corporation is contracted by the FAA to pr ocess problem reports.
8.5 Problem R eporting P rocess. The following is the problem reporting process:
1. Operator submits problem report.
2. RMA :
• Gathers information as necessary,
• Performs an analysis ,
10/3/17 AC 90 -117
• Collaborates with subject matter experts (i.e. , Original Equipme nt Manufacturers
(OEM)), and
• Determines appropriate solutions .
3. Operator is notified of the results .
10/3/17 AC 90 -117
Appendix A
AP
PENDIX A. FOREIGN OPERATORS
A.
1 General. Foreign operators may use data link communications when operating in
U.S. airspace. In order to take advantage of Air Traffic Service Unit ( ATSU)
data communication services, foreign operators must be properly equipped and file the
appropriate flight plan designator codes ( see Chapter 3 , Aircraft Eligibility,
and Appendix D, Flight Plan ning).
A.2 Title 14 CFR Part 129 . The FAA does not approve data link communications
installations, training programs, minimum equipment lists ( MEL ), or maintenance
programs for foreign operators operating non- U.S.-registered aircraft. Such
authorizations are addressed as specified by the S tate of the O perator or State of Registry,
as appropriate. However, since compatibility of data link communications within
U.S. airspace is essential, part 129 operations guidelines for data link communications are
provided by this AC. Compliance with these data link communications provisions ensures both data link communication system and procedural compatibility. The FAA issues authorization to foreign operators for data communications operations in U.S. airspace via operations specification (OpSpec) A003. Outside the United S tates,
in international waters wherein U .S. air traffic (i.e., N ew Y ork and Oakland air route
traffic control centers (ARTCC) ) is tasked by the International Civil Aviation
Organization (ICAO) with traffic separation for all aircraft , the foreign operator needs to
have their Civil Aviation Authority’s ( CAA ) approval for data comm unications.
The FAA does not issue an OpSpec for operations outside the United S tates.
See Appendix
B, Data Link Communications Minimum Equipment List (MEL) and
Master Minimum Equipment List (MMEL) Provisions, for further details on MELs and MMELs when the FAA is the State of Registry of a foreign operator’s aircraft.
More details will be provided in future revisions of the AC as they become available.
A.3 Applicatio n Process. Foreign operators should contact their FAA principal operations
inspector ( POI) to obtain application information for part 129 data link communications
authorization in U.S. airspace. When a foreign operator submits the necessary information to the responsible principal inspector (P I), showing its aircraft are
in compliance, the PI approves data comm unications via OpSpec A003 or an amendment.
Although not mandatory, foreign operators should comply with the provisions of this AC or equivalent provisions specified by the S tate of the Operator or by ICAO.
A.4 Unique Address. An appropriate data link communication system must be installed and
operated on suitable frequencies specified by the ATSU during flight in U.S. airspace if procedures are predicated on its use. A unique and specific address, the ICAO 24- bit
aircraft identification, must be assigned to the airplane and the data link communication must recognize this address. When properly set, the unique address may not be altered, set to a duplicated address, or set to an address that potentially interferes with the ATSU
or data link communication safety functions.
A.5 U.S. Interoperability Requirements. The operator must confirm the interoperability of
their aircraft data link system (interoperability re quirements standards (INTEROP)
designators are described in Table 2-2
, Interoperability Designators and Descriptions).
A-1
10/3/17 AC 90 -117
Appendix A
The data link communication system must be operated in accordance with the
U.S. airspace interoperability requirements , except as provided for by the MEL
provisions acceptable to the State of the Operator.
A.6 Training . Training and procedures for use of data link communication as specified
by ICAO, this AC, or other equivalent criteria acceptabl e to the FAA should be used
when operating in U.S. airspace.
A.7 Unsafe Performance or Conditions. Unsafe performance or conditions related to
data link communication operations which potentia lly could affect continued safe
operations in U.S. airspace (a data link communication event) should be reported to their
International Field Office (IFO) (refer to the FAA’s IFO website ). Operators should also
follow the problem reporting procedures in Chapter 8, Reports .
A.8 U.S. Domestic Airspace. For a summary of U .S. domestic ( Controller -Pilot Data Link
Communication –Departure Clearance (CPDLC -DCL) service and U .S. en route data
communication service) airspace requirements , see Appendix C , Summary of Airspace
Requirements.
A-2
10/3/17 AC 90 -117
Appendix B
APPENDIX B. DATA LINK COMMUNICATIONS MINIMUM EQUIPMENT LI ST
(MEL ) AND MASTER MINIMUM EQUIP MENT LIST ( MMEL ) PROVISIONS
B.1 Inoperative Equipment. Each operator intending to have authority to dispatch an
aircraft with a data link communication system or component temporarily inoperative
must do so in accordance with provisions of a m inimum equipment l ist (MEL).
For U.S. -registered aircraft, MELs are approved for each operator and type aircraft,
within provisions of the FAA Master Minimum Equipment List (MMEL) for that type. When proposed MEL provisions are consistent with the FAA MMEL, principal operat ions inspectors (POI) may approve the MEL. Enhanced features (those above and
beyond the basic data link communication system) may be inoperative, provided the inoperative features do not degrade the system ( e.g., data link communication printers).
Note: Title 14 CFR part 91, § 91.213
does not provide MMEL relief should
equipment fail that is not included in the MMEL/MEL. Also refer to 14 CFR part
121, § 121.628; part 125, § 125.201; part 129, § 129.14; and part 135 ,
§ 135.179 .
Table B -1. Minimum Equipment List Example
B-1
10/3/17 AC 90 -117
Appendix B
Table B -2. Example of a Data Link Communication MMEL Provision
N
ote 1: The provisions and repair category intervals are intended to grant the
operator sufficient relief during the initial stages of the data link communication
implementation. This is intended to promote the installation process, as well as
support the use of a partial system. Both equipment reliability and operational experience will dictate, what, if any, revision to this MMEL relief should be considered after the installation phase is completed.
Note 2: Operators are responsible for entering the number in the “Number
Installed” column of the MEL.
Note 3: Operators are responsible for entering alternate procedures in the MEL
comment sectio n or referencing the location of such procedures in their
manual system.
Note 4: If MMEL has not been updated for Controller- Pilot Data Link
Communicatio n (CPDLC ) equipment for aircraft that are issued a Supplemental
Type Certificate ( STC), the operator is reminded that they must adhere to
§ 91.213. Note 5: Special Condition: The MMEL does not provide relief for inoperative
data communications equipment at this time and is being reviewed at the Aircraft
Evaluation Group (AEG). Should any of the equipment/software fail relative to
data link communications, the data equipment/software must be replaced/repaired before the aircraft can take off according to § 91.213(a).
B-2
10/3/17 AC 90-117
Appendix C
APPENDIX C. SUMMARY OF AIRSPACE REQUIREMENTS
C.1 Summary of Airspace Requirements . (Table C -1, Summary of Airspace
Requirements .) Each Air Traffic Service Unit (ATSU) providing data link services
defines the requirements for their operations ( refer to International Civil Aviation
Organization (ICAO) Doc 4444, Procedures for Air Navigation Services - Air Traffic
Management ; ICAO Doc 7030, Regional Supplementary Procedures; ICAO Doc 10037,
Global Operational Data Link (GOLD) Manual, ICAO Global Guidelines for Data Link
Operations; Aeronautical Information Publications ( AIP); and flight information region
(FIR) specific bulletins for additional information).
Table C-1. Summary of Airspace Requirements
Airspace Service
(Operational
Use) Aircraft Data Link
Communication
System
(Interoperability) ATSU
Provided
Subnetwork Operator -
Provided
Subnetwork Performance
Specification
U.S.
(Domestic) CPDLC -DCL
service FANS 1/A(+) VDL M2 or
VDL M0/A N/A N/A
U.S.
(Domestic) En route data
communication
services FANS 1/A(+) VDL M2 **** VDL M0/A* TBD
Continental
(Domestic) European data
link program ATN B1 VDL M2 N/A N/A
Oceanic and
Remote
Continental Oceanic and remote
continental
23 NM lateral or
along- track
spacing*** FANS 1/A(+)
N/A SATCOM
(Classic Aero, SBB, or
SBD)** RCP 240
RSP 180
Oceanic and
Remote
Continental 50 NM Longitudinal
FANS 1/A(+) N/A SATCOM
(Classic Aero,
SBB, or
SBD)** RCP 240
RSP 180
Oceanic and
Remote
Continental 30 NM Longitudinal FANS 1/A(+) N/A SATCOM
(Classic Aero,
SBB, or
SBD)** RCP 240
RSP 180
Oceanic and
Remote 5 Minute Longitudinal FANS 1/A(+) N/A SATCOM
(Classic Aero,
SBB, or
SBD)** RCP 240
RSP 180
C-1
10/3/17 AC 90- 117
Appendix C
Airspace Service
(Operational
Use) Aircraft Data Link
Communication
System
(Interoperability) ATSU
Provided
Subnetwork Operator -
Provided
Subnetwork Performance
Specification
Oceanic and
Remote
Continental N/A FANS 1/A ADS -C N/A SATCOM
(Classic Aero,
SBB, or
SBD)**
HFDL N/A
Oceanic and
Remote
Continental/
Domestic N/A ACARS VDL M2 or
VDL M0/A SATCOM
(Classic Aero, SBB, or
SBD)**
HFDL N/A
Note: Table C -1 asterisks:
* An approval is required to use VDL M 0/A for U .S. en route data
communications and the operator assumes responsibility for the C ommunication
Service P rovider (CSP) . The allocation of performance requirements to the CSP is
more stringent than the RCP 240 allocation, which is used only to ide ntify the
aircraft allocation. See Chapter 4, Communication Service Providers .
** Aircraft typically use VDL M0/A or VDL M2 when in range of ground radios,
which is also acceptable. However, an aircraft wit h only these subnetworks would
not be eligible for the oceanic and remote continental operations due to coverage
limitations.
*** See ICAO Doc 4444 for more information.
**** Must be tunable (Technical Standard Order (TSO )-C160a or later ,
Very High Frequency (VHF) Digital Link (VDL) Mode 2 Communications
Equipment ) with “push to load” capability into the navigation system whenever
a routing change is received for operations supported by Baseline 2 ( B2) and
Future Air Navigation Systems (FANS ) 1/A(+) data link communication systems.
C-2
10/3/17 AC 90- 117
Appendix C
Table C -2. Sub network Designators
Subnetwork Designator Description of Designator
VDL M0/A Very high frequency data link – Mode 0/A
VDL M2 Very high frequency data link – Mode 2
HFDL High frequency data link
SATCOM (Classic Aero) Inmarsat or MT -SAT – Classic Aero satellite
communications
SATCOM (SBB) Inmarsat – SwiftBroadband satellite
communications
SATCOM (SBD) Iridium – Short burst data satellite
communications
Table C -3. Preferred Original Equipment Manufacturer Annotation
“The FAA has approved the aircraft data li nk system to the criteria in
AC 20-140C for the following data link capabilities:
Interop Designators: FANS 1/A+ (with automation)
ATN B1
B2
ACARS ATS
Subnetworks: VDL M0/A/2
SATCOM (Classic Aero, SBD, SBB)
HFDL
ACARS ATS
Aircraft -Allocated Performance CPDLC : RCP 130, RCP 240, RCP 400
ADS -C: RSP 160, RSP 180, RSP 400
This design approval does not constitute operational authorization.”
C-3
10/3/17 AC 90 -117
Appendix D
APPENDIX D. FLIGHT P LANNING
D.1 Filing Required Communication Performance ( RCP )/Required Surveillance
Performance ( RSP ) Capabilities. When filing RCP/RSP capabilities, operators must
ensure the planned use of associated communication and surveillance capabilities for the
flight will be in accordance with regulations, policies , and procedures in control areas for
the flight, as published by the applicable States in Aeronautical Information Publications (AIP) (or equivalent publications). Operators should ensure the proper information to
denote Performance -based Communication and Surveillance ( PBCS ) capabilities is
included in the International Civil Aviation Organization ( ICAO ) flight plan.
D.1.1 The following are determinations for proper filing:
1. Presence of relevant serviceable equipment on board the aircraft.
2. Equipment and capabilities commensurate with pilot qualifications.
3. When applicable, appropriate authorizations as described in FAA operations specifications (OpSpec)/ management specifications ( MSpec)/ letters of
authorization ( LOA ).
D.2 Regulatory Basis. Flight planning must be in accordance with the following where applicable:
1. Part 91
:
• § 91.169 , IFR F light P lan: Information R equired.
• § 91.173 , ATC Clearance and F light P lan Required.
2. Part 121 :
• § 121.667 , Flight Plan: VFR and IFR: Supplemental O perations.
• § 121.695 , Disposition of Load M anifest, D ispatch R elease, and Flight Plans:
Domestic and Flag O perations.
• § 121.697 , Dispositio n of Load Manifest, Flight R elease, and Flight Plans:
Supplemental Operations.
3. Part 125, § 125.405 , Disposition of Load M anifest, F light R elease, and
Flight P lans.
D.2.1 Flight P lan D escriptors :
• D1and G1 for Automatic Dependent Surveillance- Contract (ADS -C) (Table D-2 ,
Item 10b Flight Plan Descriptors for Surveillance Equipment);
• J1 through J7 for Controller- Pilot Data Link Communicatio n (CPDLC ) (Table D-1 ,
Item 10a Flight Plan COM Descriptors ); and
• P1 and P2 for RCP Performance (Table D -1).
D-1
10/3/17 AC 90 -117
Appendix D
Note 1: Refer t o ICAO Doc 4444 , Procedures for Air Navigation Services –
Air Traffic Management, Appendix 2, for flight plan requirements. Also, refer to
the FAA Flight Planning Information website .
Note 2: The inclusion of PBCS capability in the filed flight plan indicates that
the relevant aircraft equipment comprising the aircraft system is approved and
serviceable, the pilot is appropriately trained and qualified, and the operator holds
applicable authorization to use the equipment for PBCS operations. If these conditions are not met , then PBCS capability should not be included in the
flight plan.
D.3 Example. As a flight plan example , use the following:
If Actual Communications Performance ( ACP ) meets at least RCP 240 at
95 percent and Actual Surveillance Performance ( ASP) meets at least RSP 180 at
95 percent , then the ope rator approved for RCP 240/ RSP 180 may file the
following:
• Field 10: “P2.”
• Field 18: “SUR/RSP180 .”
D.3.1 If ACP does not meet RCP 240 at 95 percent , then the operator may file for RCP 400 by
entering P1 and/or P3 in field 10. If ASP does not meet RSP 180 at 95 percent , then the
operator may file for RS P 400 by entering “SUR/RSP400” in field 18.
D.4 Item 10a Descriptors. In Item 10 a of the flight plan, operators should insert one of the
descriptors , P1- P2, as appropriate, listed in Table D-1
, to identify an aircraft’s RCP
capability .
D-2
10/3/17 AC 90 -117
Appendix D
Table D -1. Item 10a Flight Plan COM Descriptors
Descriptors System
E1 FMC WPR ACARS
E2 D-FIS ACARS
E3 PDC ACARS
J1 CPDLC ATN VDL Mode 2
J2 CPDLC FANS 1/A HFDL
J3 CPDLC FANS 1/A VDL Mode 0/A
J4 CPDLC FANS 1/A VDL Mode 2
J5 CPDLC FANS 1/A SATCOM (I nmarsat )
J6 CPDLC FANS 1/A SATCOM (MTSAT)
J7 CPDLC FANS 1/A SATCO M (Iridium)
P1 CPDLC RCP 400
P2 CPDLC RCP 240
Note: Part 91 operators filing “J” codes for U.S. domestic data link services must have
a data link authorization to file J5 –J7 in oceanic and remote continental airspace.
D.5 Item 10b Descriptors. In Item 10b of the flight plan, operators should insert one of
the descriptors , D1 and G1, as appropriate, listed in Table D -2, to identify an aircraft’s
RSP capability:
Table D -2. Item 10b Flight Plan Descriptors for Surveillance Equipment
Descriptor System
D1 ADS-C with FANS 1/A capabilities
G1 ADS -C with ATN capabilities
D.6 Item 18 RSP Specification. In Item 18 of the flight plan, the aircraft operator should file
the RSP capability by inserting the indicator “ SUR/ ” followed by the appropriate RSP
specification (e.g. , RSP400 or RSP180).
Note: The ATSU unit uses the flight plan information to determine when to apply
particular Air Traffic System Management ( ATM ) operations that are dependent
on the capability and to configure the system (e.g., set timer threshold values) for efficient operation when RCP and/or RSP varies.
D-3
10/3/17 AC 90 -117
Appendix D
D.7 Field 1 8/DAT f or C PDLC or Pre- Departure Clearance ( PDC). The proposed data link
communication “codes” in Field 18/DAT are an optional mechanism for the user to
notify FAA automation to generate a CPDLC or PDC.
• Field 10a (Equipage) used to identify aircraft capabilities .
• F
ield 18 (Other Information) DAT/ codes used to identify flights getting CPDLC
or PDC .
• Need to fill in Field 10a in order to get to Field 18 DAT/.
• F
ield 18 DAT/ c odes will include a primary/secondary hierarchy .
Table D -3. Voice, PDC, DCL
Operators
Using Data Link
Communication
Capability Field 10a Data Link
Communication
for Field 18
DAT/* Comments for FANS
in U.S. Domestic
Operations
Voice only** Not equipped for
ACARS or
FANS; gets voice
only. Default if user is not
getting PDC or FANS. Field 10a may be
optional.
Voice only** Equipped for ACARS and FANS but wants voice only. E3J4J7
Z 1VOICE
Optional. Only needed if
users want to negate default PDC/
CPDLC -DCL value and
use voice only.
Some aircraft are non-ACARS equipped, and 10a is physical equipage. Still get PDC via other means (e.g., gate printer ).
Optional if currently getting PDC. PDC only** Not ACARS equipped but gets PDC via manual means . Z 1PDC
PDC only**
Equipped only for
ACARS /PDC . E3
Z 1PDC Optional if currently
getting PDC.
PDC only** Equipped for ACARS /PDC and
FANS but wants PDC only. E3J4Jx
Z 1PDC Equipped for
ACARS /PDC and
FANS 1/A or 1/A(+),
and possibly other
capabilities (Jx).
D-4
10/3/17 AC 90 -117
Appendix D
Operators
Using Data Link
Communication
Capability Field 10a Data Link
Communication
for Field 18
DAT/* Comments for FANS
in U.S. Domestic
Operations
FANS 1/A &
FANS 1/A+ DCL/PDC only Equipped for
ACARS/PDC and FANS but wants
FANS 1/A only
for CPDLC -DCL . E3J4Jx
Z 1FANS Identifies U .S. domestic
preference for PDC .
FANS 1/A &
FANS 1/A+ DCL/PDC Equipped for ACARS/PDC and FANS with primary/secondary preferences . E3J4Jx
Z 1FANSPDC
Code number shows
priority preference, (e.g., DCL is primary preference; PDC is secondary that will be used if primary i s
unavailable and if
feasible) .
* No spaces in actual DAT/ codes .
** No ICAO flight plan change required if user currently gets PDC and does not want DCL. Current PDC designation will be the default.
D-5
10/3/17 AC 90 -117
Appendix D
Table D -4. DCL and En Route Data L ink Clearances
Operators
Using Data Link
Communication
Capability Field 10a Data Link
Communication
for Field 18
DAT/* Comments for FANS
in U.S. Domestic
Operations
FANS 1/A &
FANS 1/A+
No En Route
UM80 Load
Issues For flights
authorized for
en route data link
with no UM80
load issues. E3J4J
Z 1FANSE2PDC This code is to be used
to obtain CPDLC- DCL
and en route clearances
with aircraft that have
no en route UM80 load
issues; PDC is
seconda ry that will be
used if primary is
unavailable and if
feasible.
FANS 1/A &
FANS 1/A+
With En Route
UM80 Load Issues For flights authorized for en route data link
with UM80 load issues and for PDC service only . E3J4J
Z 1FANSE R2PDC
This code is to be used
to obtain CPDLC- DCL
and en route clearances with aircraft that have en route UM80 load issues; PDC is secondary that will be used if primary is unavailable and if
feasible.
* No spaces in actual DAT/ codes .
D-6
10/3/17 AC 90 -117
Appendix D
Table D -5. PDC Only and En Route Data L ink
Operators
Using Data Link
Communication
Capability Field 10a Data Link
Communication
for Field 18
DAT/* Comments for FANS
in U.S. Domestic
Operations
FANS 1/A &
FANS 1/A+
No En Route
UM80 L oad
Issues For flights
authorized for
en route data link
with no UM80
load issues and
for PDC service
only. E3J4J
Z 1PDCFANSE This code is to be used
to obtain PDC and
CPDLC en route
clearances with aircraft
that have no en route
UM80 load issues from
PDC ONLY airports .
FANS 1/A &
FANS 1/A+
With En Route
UM80 Load Issues For flights
authorized for
en route data link
with UM80 load issues and for PDC service only . E3J4J
Z 1PDC FANSE R This code is to be used
to obtain PDC and CPDLC and en route clearances with aircraft that have en route UM80 load issue s
departing from PDC
ONLY airports .
* No spaces in actual DAT/ codes .
Table D -6. En Route Data L ink Clearances Only
Operators
Using Data Link
Communication
Capability Field 10a Data Link
Communication
for Field 18
DAT/* Comments for FANS
in U.S. Domestic
Operations
FANS 1/A &
FANS 1/A+
No En Route
UM80 L oad
Issues For flights
authorized for
en route data link
with no UM80
load issues . J4
Z FANSE This code is to be used
to obtain PDC and
CPDLC en route
clearances with aircraft
that have no en route
UM80 load issues . (No
Tower DCL or PDC .)
FANS 1/A & FANS 1/A+
With En Route
UM80 L oad
Issues For flights authorized for en route data link
with UM80 load issues. J4
Z FANSE R
This code is to be used
to obtain PDC and CPDLC and en route
clearances with aircraft that have en route UM80 load issues. (No
Tower DCL or PDC .)
* No spaces in actual DAT/ codes .
D-7
10/3/17 AC 90 -117
Appendix E
APPENDIX E. VOICE PHRASEOLOGY
Table E -1. Voice Phraseology R elated to Controller-Pilot Data Link Communication
(CPDLC ) From Pilot
Condition Voice Phraseology
To notify air traffic control ( ATC ) of a
correction to a CPDLC message. ( International
Civil Aviation Organization .
(ICAO) Doc 4444 ) DISREGARD CPDLC (message type)
MESSAGE, BREAK (correct informat ion
or request)
To notify ATC of a single CPDLC message
failure. (ICAO Doc 4444) CPDL C MESSAGE FAILURE (appropriate
information or request)
To notify ATC of an aircraft data link system
or CPDLC connection failure.
(ICAO Doc 4444) CPDLC FAILURE (requests/notifications)
Note: This voice phraseology is included only with the first transmiss ion made for this
reason.
Example: CPDLC FAILURE. CONTINUING
ON VOICE.
To advise ATC the CPDLC connection is
being terminated manually and logon/notification procedure is being initiated
with the next Air Traffic Service Unit ( ATSU). DISCONNECTING CPDLC W ITH (facility
designation). LOGGING ON TO (facility designation)
Note: The facility designation is the ICAO
four-character facility code or facility name.
To advise ATC that a logon /notification
procedure is being initiated following
restoration of data link service. LOGGING ON TO (facility designation)
To advise ATC that a delayed CPDLC uplink
has been received and to request clarification
of the intent of the CPDLC message. DELAYED CPDLC MESSA GE RECEIVED
(requests)
E-1
10/3/17 AC 90 -117
Appendix E
Table E -2. Voice Phraseology R elated to CPDLC From the ATSU
Condition Voice Phraseology
To advise all stations or a specific flight of a
complete ground system failure and provide
further instructions. (ICAO Doc 4444) (ALL STATIONS) CPDLC FAILURE
(instructions).
Example:
ALL STATIONS CPDLC FAILURE. DISCONNECT CPDLC. CONTINUE ON
VOICE
To instruct the pilot of a single CPDLC
message failure. ( ICAO Doc 4444 ) CPDLC MESSAGE FAILURE (appropriate
clearance, instruction, informatio n or request)
To instruct the pilot of a correction to a
CPDLC clearances, instructions, information
or requests. (ICAO Doc 4444) DISREGARD CPDLC (message type)
MESSAGE, BREAK (correct clearance,
instruction, information or request)
To instruct all stati ons or a specific flight to
avoid sending CPDLC requests for a limited
period of time. (ICAO Doc 4444) (ALL STATIONS) STOP SENDING CPDLC
REQUESTS (UNTIL ADVISED) ((reason))
To instruct the pilot to manually initiate a
logon/notification to the subsequent ATSU. DISCONNECT CPDLC THEN LOGON TO
(facility designation)
Note 1: The (facility designation) is the four character ICAO code.
Note 2: Use this voice phraseology when the CPDLC transfer to an adjacent ATSU has
failed.
To advise the pilot prior to the com mencement
of a CPDLC shutdown and instruct them to
continue on voice. CPDLC WILL BE SHUT DOWN.
DISCONNECT CPDLC. CONTINUE ON
VOICE
To advise all stations or a specific flight to
resume normal CPDLC operations and provide
the logon /notification address. (ALL STATIONS) RESUME NORMAL
CPDLC OPERATIONS. LOGON TO (facility
designation)
E-2
10/3/17 AC 90 -117
Appendix F
APPENDIX F. CONTRO LLER -PILOT DATA LINK COMMUNICATION ( CPDLC )
UPLINK AND DOWNLINK TABLES
Table F -1. Color Key
Blue Uplink Tables
Green Downlink Tables
Table F -2. Response A ttribute of CPDLC Message E lement for Uplink Messages
Response
Attribute Description
W/U Response required. Yes
Valid responses. WILCO, UNABLE, STANDBY, NOT CURRENT DATA AUTHORITY,
NOT AUTHORIZED NEXT DATA AUTHORITY, LOGICAL ACKNOWLEDGEMENT (only if
required), ERROR
Note: WILCO, UNABLE, NOT CURRENT DATA AUTHORITY, NOT AUTHORIZED NEXT
DATA AUTHORITY and ERROR will close the uplink message.
FANS 1/A: WILCO, UNABLE, STANDBY, ERROR, NOT CURRENT DATA AUTHORITY.
A/N Response required. Yes
Valid responses. AFFIRM, NEGATIVE, STANDBY, NOT CURRENT DATA AUTHORITY,
NOT AUTHORIZED NEXT DATA AUTHORITY, LOGICAL ACKNOWLEDGEMENT (only if
required), ERROR
Note: AFFIRM, NEGATIVE, NOT CURRENT DATA AUTHORITY, NOT AUTHORIZED NEXT
DATA AUTHORITY and ERROR will close the upl ink message.
FANS 1/A: AFFIRM, NEGATIVE, STANDBY, ERROR, NOT CURRENT DATA AUTHORITY.
R Response required. Yes
Valid responses. ROGER, UNABLE, STANDBY, NOT CURRENT DATA AUTHORITY, NOT AUTHORIZED NEXT DATA AUTHORITY, LOGICAL ACKNOWLEDGEMENT (only if
require d), ERROR
Note: ROGER, NOT CURRENT DATA AUTHORITY, NOT AUTHORIZED NEXT DATA
AUTHORITY and ERROR will close the uplink message.
FANS 1/A: ROGER, STANDBY, ERROR, NOT CURRENT DATA AUTHORITY. FANS 1/A
aircraft do not have the capability to send UNABLE in respo nse to an uplink message containing
message elements with an “R” response attribute. For these aircraft, the pilot may use alternative
means to UNABLE the message. These alternative means will need to be taken into consideration to
ensure proper technical and operational closure of the communication transaction.
F-1
10/3/17 AC 90 -117
Appendix F
Response
Attribute Description
Y Response required. Yes
Valid responses: Any CPDLC downlink message, L OGICAL ACKNOWLEDGEMENT
(only if required)
N Response required. No, unless logical acknowledgement required.
Valid Responses (only if LOGICAL ACKNOWLEDGEMENT is required). LOGICAL
ACKNOWLEDGEMENT, NOT CURRENT DATA AUTHORITY, NOT AUTHORIZED NEXT
DATA AUTHORITY, ERROR
FANS 1/A: Defined “Response not required,” but not used. Under some circumstances, an ERROR
message will also clos e an uplink message.
NE [Not defined in International Civil Aviation Organization (ICAO) Doc 4444]
FANS 1/A: The WILCO, UNABLE, AFFIRM, NEGATIVE, ROGER, and STANDBY responses are
not enabled (NE) for pilot selection. An uplink message with a response attribute NE is considered to
be closed even though a response may be required operationally. Under some circumst ances,
a downlink error message may be linked to an uplink message with a NE attribute.
Table F -3. Response Attribute of CPDLC Message Element for Downlink Messages
Response
Attribute Description
Y Response required. Yes
Valid responses: Any CPDLC uplink message, LOGICAL ACKNOWLEDGEMENT
(only if required).
N Response required. No, unless logical acknowledgement required.
Valid responses (only if LOGICAL ACKNOWLEDGEMENT is required). LOGICAL ACKNOWLEDGEMENT, MESSAGE NOT SUPPORTED BY THIS ATC UNIT , ERROR
FANS 1/A: Aircraft do not have the capability to receive technical responses to downlink message
elements with an “N” response attribute (other than LACK or ERROR for ATN B1 aircraft).
In some cases, the response attribute is different between FANS 1/A aircraft and ICAO Doc 4444.
As an example, most emergency messages have an “N” response attribute for FANS 1/A whereas
ICAO Doc 4444 defines a “Y” response attribute for them. As a consequence, for FANS 1/A aircraft,
the ATC will need to use alternative means to acknowledge to the pilot that an emergency message
has been received.
F-2
10/3/17 AC 90 -117
Appendix F
Table F -4. Route Uplink Message Elements (RTEU)
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RTEU -1 Instruction to proceed via the
specified departure clearance. (departure clearance) W/U UM169 (free text)
Note: UM169 may be
combined with UM158
ATIS (ATIS code)
and/or UM123
SQUAWK (beacon)
code) and/or UM19
MAINTAIN (altitude) . N/A
RTEU -2 Instruction to proceed directly
to the specified position. PROCEED DIRECT TO (
position) W/U UM
74 PROCEED
DIRECT TO (position) UM74 PROCEED DIRECT TO
(position)
RTEU -2 Instruction to proceed directly
to the specified position. PROCEED DIRECT TO (
position) W/U UM
75 WHEN ABLE
PROCEED DIRECT
TO (position)
Note: This message element is equivalent to SUPU -5 plus
RTEU -2 in
ICAO Doc 4444. N/A
RTEU -3 Instruction to proceed, at the
specified time, directly to the
specified position. AT TIME (time) PROCEED
DIRECT TO (position) W/U UM76 AT (time)
PROCEED DIRECT TO (position) N/A
RTEU -4 Instruction to proceed, at the
specified position, directly to
the next specified position. AT (position) PROCEED
DIRECT TO (position) W/U UM77 AT (position)
PROCEED DIRECT TO (position) N/A
RTEU -5 Instruction to proceed upon
reaching the specified level,
directly to the specified
position. AT (level single) PROCEED
DIRECT TO (position) W/U UM78 AT (altitude)
PROCEED DIRECT
TO (position) N/A
F-3
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CP DLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RTEU -6 Instruction to proceed to the
specified position via the specified route. CLEARED TO (position) VIA
(departure data[O]) (en- route
data) W/U UM79 CLEARED TO (position) VIA
(route clearance) UM79 CLEARED TO (position) VIA (route
clearance)
RTEU -7 Instruction to proceed via the specified route. CLEARED (departure
data[O]) (en- route data)
(arrival approach data) W/U UM80 CLEARED (route clearance) UM80 CLEARED (route clearance)
RTEU -8 Instruction to proceed in accordance with the specified procedure.
CLEARED (procedure name) W
/U UM81 CLEARED (procedure name) N/A
RTEU -9 Instruction to proceed from the specified position via the specified route. AT (position) CLEARED
(en-route data) (arrival
approach data) W/U UM83 AT (position)
CLEARED (route clearance) N/A
RTEU -10 Instruction to proceed from the specified position via the specified procedure. AT (position) CLEARED
(procedure name) W/U UM84 AT (position)
CLEARED (procedure
name) N/A
RTEU -11 Instruction to enter a holding pattern at the specified position in accordance with the specified instructions.
Note: RTEU -13 EXPECT
FURTHER CLEARANCE AT TIME (time) is appended to
this message when an extended
hold is anticipated. AT (position) HOLD
INBOUND TRACK
(degrees)(direction) TURNS
(leg type) LEGS W/U UM91 HOLD AT (position) MAINTAIN
(altitude) INBOUND
TRACK (degrees)
(direction) TURN
LEG TIME (leg type) N/A
F-4
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RTEU -12 Instruction to enter a holding
pattern at the specified position
in accordance with the published holding instructions.
Note: RTEU -13 EXPECT
FURTHER CLEARANCE AT
TIME (time) is appended to this
message when an extended hold
is anticipated. AT (position) HOLD AS
PUBLISHED W/U UM9 2 HOLD
AT (position)
AS PUBLISHED
MAINTAIN (altitude) UM92 HOLD AT
(position) AS
PUBLISHED MAINTAIN (level)
RTEU -13 Notification that an onwards
clearance may be issued at the specified time. EXPECT FURTHER
CLEARANCE AT TIME (time) R UM93 EXPECT
FURTHER CLEARANCE AT
(time) N/A
RTEU -14 Notification that a clearance
may be issued for the aircraft to fly the specified procedure or clearance name. EXPECT (named instruction) R UM99 EXPECT
(procedure name)
Note: Used when a
published procedure is
designated.
UM169 ‘EXPECT
(clearance name) ’
Note: Used when an
unpublished clearance/procedure
name is designated. N/A
RTEU -15 Request to confirm the assigned
route. CONFIRM ASSIGNED
ROUTE Y UM137 CONFIRM
ASSIGNED ROUTE
Note: NE response
attribute. N/A
F-5
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RTEU -16 Request to make a position
report. REQUEST POSITION
REPORT Y UM147 REQUEST
POSITION REPORT N/A
RTEU -17 Request to provide the
estimated time of arrival at the
specified position. ADVISE ETA (position) Y UM169 ‘ADVISE
ETA (position) ’ N/A
F-6
10/3/17 AC 90 -117
Appendix F
Table F -5. Route Downlink Message Elements (RTED)
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RTED -1 Request for a direct clearance to
the specified position. REQUEST DIRECT TO
(position) Y DM22 REQUEST
DIRECT TO (position) DM22 REQUEST
DIRECT TO
(position)
RTED -2 Request for the specified
procedure or clearance name. REQUEST (named instruction) Y DM23 REQUEST
(procedure name) N/A
RTED -3 Request for the specified route. REQUEST CL EARANCE
(depart ure data[O])
(en-route data)
(arrival approach data[O]) Y DM24 REQUEST
(route clearance) N/A
RTED -4 Request for the specified
clearance. REQUEST (clearance type)
CLEARANCE Y DM25 REQUEST
CLEARANCE N/A
RTED -5 Position report. POSITION REPORT
(position report) N DM48 POSITION
REPORT ( position
report) N/A
RTED -6 Request for the specified
heading. REQUEST HEADING
(degrees) Y DM70 REQUEST
HEADING (degrees) N/A
RTED -7 Request for the specified ground
track. REQUEST GROUND TRACK
(degrees) Y DM71 REQUEST
GROUND TRACK
(degrees) N/A
RTED -8 Request for the time or position
that can be expected to rejoin the
cleared route. WHEN CAN WE EXPECT
BACK ON ROUTE Y DM51 WHEN CAN
WE EXPECT BACK
ON ROUTE N/A
RTED -9 Confirmation that the assigned
route is the specified route. ASSIGNED ROUTE
(departure data[O])
(en-route data)
(arrival approach data[O]) N DM40 ASSIGNED
ROUTE
(route clearance) N/A
RTED -10 Notification of estimated time of
arrival at the specified position. ETA (position) TIME (time) N DM67 ‘ETA (position)
TIME (time) ’ N/A
F-7
10/3/17 AC 90 -117
Appendix F
Table F-6. Lateral Uplink Message Elements (LATU)
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LATU -1 Instruction to fly a parallel track
to the cleared route at a
displacement of the specified
distance in the specified
direction. OFFSET (specified distance)
(direction) OF ROUTE W/U UM64 OFFSET
(distance offset)
(direction)
OF ROUTE UM64 OFFSET
(specified distance) (direction)
OF ROUTE
LATU -2 Instruction to fly a parallel track
to the cleared route at a
displacement of the specified distance in the specified
direction and commencing at the
specified position. AT (position) OFFSET
(specified distance)
(direction) OF ROUTE W/U UM65 AT (position)
OFFSET (distance offset)
(direction)
OF ROUTE N/A
LATU -3 Instruction to fly a parallel track
to the cleared route at a
displacement of the specified
distance in the specified
direction and commencing at the
specified time. AT TIME (time) OFFSET
(specified distance) (direction) OF ROUTE W/U UM66 AT (time)
OFFSET (distance offset)
(direction) OF
ROUTE N/A
LATU -4 Instruction to rejoin the cleared
route. REJOIN ROUTE W/U UM67 PROCEED
BACK ON ROUTE N/A
LATU -5 Instruction to rejoin the cleared
route before passing the
specified position. REJOIN ROUTE BEFORE
PASSING (position) W/U UM68 REJOIN
ROUTE BY (position) N/A
LATU -6 Instruction to rejoin the cleared
route before the specified time. REJOIN ROUTE BEFORE
TIME (time) W/U UM69 REJOIN
ROUTE BY (time) N/A
LATU -7 Notification that a clearance
may be issued to enable the aircraft to rejoin the cleared
route before passing the
specified position. EXPE CT BACK ON ROUTE
BEFORE PASSING (position) R UM70 EXPECT
BACK ON ROUTE
BY (position) N/A
F-8
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LATU -8 Notification a clearance may be
issued to enable the aircraft to
rejoin the cleared route before
the specified time. EXPECT BACK ON ROUTE
BEFORE TIME (time) R UM71 EXPECT
BACK ON ROUTE BY (time) N/A
LATU -9 Instruction to resume own
navigation following a period of
tracking or heading clearances.
May be used in conjunction with
an instruction on how or where
to rejoin the cleared route. RESUME OWN
NAVIGATION W/U UM72 RESUME
OWN NAVIGATION UM72 RESUME
OWN NAVIGATION
LATU -10 Instruction allowing deviation
up to the specified distance(s)
from the cleared route in the
specified direction(s). CLEARED TO DEVIATE
UP TO (lateral deviation)
OF ROUTE W/U UM82 CLEARED TO
DEVIATE UP TO
(distance offset)
(direction)
OF ROUTE UM82 CLEARED TO
DEVIATE UP TO
(specified distance)
(direction)
OF ROUTE
LATU -11 Instruction to turn left or right as
specified on to the specified
heading. TURN (direction) HEADING
(degrees) W/U UM94 TURN
(direction) HEADING
(degrees) UM94 TURN
(direction) HEADING
(degrees)
LATU -11 Instruction to turn left or right as
specified on to the specified heading. TURN (direction) HEADING
(degrees) W/U UM98
IMMEDIATELY TURN (direction)
HEADING (degrees)
Note: This message
element is equivalent
to EMGU -2 plus
LATU -11 in
ICAO Doc 4444. N/A
LATU -12 Instruction to turn left or right as
specified on to the specified
track. TURN (direction) GROUND
TRACK (degrees) W/U UM95 TURN
(direction)
GROUND TRACK
(degrees) N/A
F-9
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LATU -13 Instruction to turn the specified
number of degrees left or right. TURN (direction) (number of
degrees) DEGREES W/U N/A UM215 TURN
(direction) (degrees)
LATU -14 Instruction to continue to fly the
present heading. CONTINUE PRESENT
HEADING W/U UM96 FLY PRESENT
HEADING UM96 CONTINUE
PRESENT HEADING
LATU -15 Instruction to fly the specified
heading upon reaching the
specified position. AT (position) FLY HEADING
(degrees) W/U UM97 AT (position)
FLY HEADING
(degrees) N/A
LATU -16 Instruction to fly the specified
heading. FLY HEADING (degrees) W/U N/A UM190 FLY
HEADING (degrees)
LATU -17 Instruction to report when clear
of weather. REPORT CLEAR OF
WEATHER W/U UM169 ‘REPORT
CLEAR OF
WEATHER’
Note: R response
attribute. N/A
LATU -18 Instruction to report when the
aircraft is back on the cleared
route. REPORT BACK ON ROUTE W/U UM127 REPORT
BACK ON ROUTE
Note: R response
attribute. N/A
LATU -19 Instruction to report upon
passing the specified position. REPORT PASSING (position) W/U UM130 REPORT
PASSING (position)
Note: R response
attribute. N/A
F-10
10/3/17 AC 90 -117
Appendix F
Table F -7. Lateral Downlink Message Elements (LATD)
Operational Definition in PANS- ATM (Doc 4444) C PDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LATD -1 Request for a parallel track from
the cleared route at a displacement of the specified distance in the specified direction. REQUEST OFFSET (specified distance) (direction)
OF ROUTE Y DM15 REQUEST OFFSET (specified
distance) (direction)
OF ROUTE N/A
LATD -2 Request for a weather deviation up to the specified distance(s) off track in the specified direction(s). REQUEST WEATHER DEVIATION UP TO (lateral deviation) OF ROUTE Y DM27 REQUEST WEATHER DEVIATION UP TO (specified distance)
(direction)
OF ROUTE DM27 REQUEST
WEATHER DEVIATION UP TO (specified distance)
(direction)
OF ROUTE
LATD -3 Report indicating that the aircraft is clear of weather. CLEAR OF WEATHER N DM69 ‘CLEAR OF WEATHER’ N/A
LATD -4 Report indicating that the cleared
route has been rejoined. BACK ON ROUTE N DM41 BACK ON ROUTE N/A
LATD -5 Report indicating diverting to the specified position via the
specified route, which may be
sent without any previous
coordination done with ATC. DIVERTING TO (position)
VIA (en-route data) (arrival
approach data[O]) Y DM59 DIVERTING TO (position) VIA
(route clearance)
Note 1: H alert
attribute.
Note 2: N response
attribute. N/A
LATD -6 Report indicating that the aircraft
is offsetting to a parallel track at the specified distance in the specified direction off from the
cleared route. OFFSETTING (specified
distance) (direction) OF
ROUTE Y DM60 OFFSETTING
(distance offset) (direction)
OF ROUTE
Note 1: H alert
attribute.
Note 2: N response
attribute. N/A
F-11
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) C PDLC Message Sets
Message Element
Identifier M
essage Element Intended Use Format for Message Element
Display R
esp. FANS 1/A ATN B1
LATD -7 Report indicating deviating
specified distance or degrees in the specified direction from the cleared route. DEVIATING (Specified Deviation)
(direction) OF ROUTE
Y
DM80 DEVIATING (Deviation Offset)
(direction) OF
ROUTE
Note 1: H alert
attribute.
Note 2: N response
attribute . N/
A
LATD -8 Report indicating passing the
specified position. PASSING (position) N DM31 PASSING (position) N/ A
F-12
10/3/17 AC 90 -117
Appendix F
Table F -8. Level Uplink Message Elements (LVLU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -1 Notification that an instruction
may be expected for the aircraft
to commence climb at the
specified time. EXPECT HIGHER AT TIME
(time) R UM7 EXPECT
CLIMB AT (time) N/A
LVLU -2 Notification that an instruction
may be expected for the aircraft
to commence climb at the
specified position. EXPECT HIGHER AT
(position) R UM8 EXPECT
CLIMB AT (position) N/A
LVLU -3 Notification that an instruction
may be expected for the aircraft
to commence descent at the
specified time. EXPECT LOWER AT TIME
(time) R UM9 EXPECT
DESCENT AT (time) N/A
LVLU -4 Notification that an instruction
may be expected for the aircraft
to commence descent at the
specified position. EXPECT LOWER AT
(position) R UM10 EXPECT
DESCENT AT (position) N/A
LVLU -5 Instruction to maintain the
specified level or vertical range. MAINTAIN (level) W/U UM19 MAINTAIN
(altitude)
Note: Used for a single
level.
UM30 MAINTAIN
BLOCK (altitude) TO
(altitude)
Note: Used for a
vertical range. UM19 MAINTAIN
(level)
F-13
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -6 Instruction that a climb to the
specified level or vertical range
is to commence and once reached is to be maintained. CLIMB TO (level) W/U UM20 CLIMB TO
AND MAINTAIN (altitude)
Note:
Used for a single
level.
UM31 CLIMB TO AND MAINTAIN BLOCK (altitude) TO
(altitude)
Note: Used for a
vertical range. UM20 CLIMB TO
(level)
LVLU -6 Instruction that a climb to the
specified level or vertical range is to commence and once reached is to be maintained. CLIMB TO (level) W/U UM36 EXPEDITE
CLIMB TO (altitude)
Note: This message
element is equivalen t
to SUPU -3 plus
LVLU -6 in
ICAO Doc 4444.
UM38 IMMEDIATELY CLIMB TO (altitude)
Note: This message
element is equivalen t
to EMGU -2 plus
LVLU -6 in
ICAO Doc 4444. N/A
F-14
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -7 Instruction that at the specified
time a climb to the specified
level or vertical range is to commence and once reached is to be maintained.
Note: This message element
would be preceded with LVLU -5
MAINTAIN (level), to prevent
the premature execution of the
instruction. AT TIME (time) CLIMB TO
(level) W/U UM21 AT (time)
CLIMB TO AND
MAINTAIN (altitude)
Note: A vertical range
cannot be provided. N/A
LVLU -8 Instruction that at the specified
position a climb to the specified level or vertical range is to commence and once reached is to be maintained.
Note: This message element
would be preceded with LVLU -5
MAINTAIN (level), to prevent
the premature execution of the
instruction. AT (position) CLIMB TO
(level) W/U UM22 AT (position)
CLIMB TO AND MAINTAIN (altitude)
Note: A vertical range
cannot be provided. N/A
LVLU -9 Instruction that a descent to the
specified level or vertical range is to commence and once
reached is to be maintained. DESCEND TO (level) W/U UM23 DESCEND TO
AND MAINTAIN
(altitude)
Note: Used for a single
level. UM23 DESCEND TO
(level)
F-15
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -9 Instruction that a descent to the
specified level or vertical range
is to commence and once reached is to be maintained. DESCEND TO (level) W/U UM32 DESCEND TO
AND MAINTAIN
BLOCK (altitude) TO
(altitude)
Note : Used for a
vertical range.
UM39
IMMEDIATELY
DESCEND TO
(altitude)
Note: This message
element is equivalent
to EMGU -2 plus . N/A
LVLU -10 Instruction that at the specified
time a descent to the specified
level or vertical range is to commence and once reached is
to be maintained. AT TIME (time) DESCEND
TO (level) W/U UM24 AT (time)
DESCEND TO AND MAINTAIN (altitude)
Note: A vertical range
cannot be provided. N/A
LVLU -11 Instruction that at the specified
position a descent to the specified level or vertical range is to commence and once
reached is to be maintained. AT (position) DESCEND TO
(level) W/U UM25 AT (position)
DESCEND TO AND MAINTAIN (altitude)
Note: A vertical range
cannot be provided. N/A
LVLU -12 Instruction that a climb is to be
completed such that the specified level is reached before
the specified time. CLIMB TO REACH (level
single) BEFORE TIME (time) W/U UM26 CLIMB TO
REACH (altitude) BY
(time) UM26 CLIMB TO
REACH (level) BY
(time)
LVLU -13 Instruction that a climb is to be
completed such that the specified level is reached before
passing the specified position. CLIMB TO REACH (level
single) BEFORE PASSING
(position) W/U UM27 CLIMB TO
REACH (altitude) BY
(position) UM27 CLIMB TO
REACH (level) BY
(position)
F-16
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -14 Instruction that a descent is to be
completed such that the
specified level is reached before
the specified time. DESCEND TO REACH
(level single) BEFORE TIME
(time) W/U UM28 DESCEND TO
REACH (altitude)
BY (time) UM28 DESCEND TO
REACH (level)
BY (time)
LVLU -15 Instruction that a descent is to be
completed such that the specified level is reached before
passing the specified position. DESCEND TO REACH
(level single) BEFORE
PASSING (position) W/U UM29 DESCEND TO
REACH (altitude)
BY (position) UM29 DESCEND TO
REACH (level)
BY (position)
LVLU -16 Instruction to stop the climb at
the specified level and, once reached, this level is to be maintained. The specified level
will be below the previously
assigned level. This instruction should only be issued when the controller can confirm that the previously assigned level has
not yet been reached. STOP CLIMB AT (level
single) W/U UM169 ‘STOP
CLIMB AT (altitude) ’
Note: R response
attribute. N/A
LVLU -17 Instruction to stop the descent at
the specified level and, once
reached, this level is to be
maintained. The specified level will be above the previously assigned level. This instruction should only be issued when the controller can confirm that the
previously assigned level has
not yet been reached. STOP DESCENT AT (level
single) W/U UM169 ‘STOP
DESCENT AT
(altitude) ’
Note: R response
attribute. N/A
LVLU -18 Instruction to climb at the
specified rate or greater. CLIMB AT (vertical rate) OR
GREATER W/U UM171 CLIMB AT
(vertical rate)
MINIMUM UM171 CLIMB AT
(vertical rate)
MINIMUM
F-17
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -19 Instruction to climb at the
specified rate or less. CLIMB AT (vertical rate) OR
LESS W/U UM172 CLIMB AT
(vertical rate)
MAXIMUM UM172 CLIMB AT
(vertical rate)
MAXIMUM
LVLU -20 Instruction to descend at the
specified rate or greater. DESCEND AT (vertical rate)
OR GREATER W/U UM173 DESCEND
AT (vertical rate)
MINIMUM UM173 DESCEND
AT (vertical rate)
MINIMUM
LVLU -21 Instruction to descend at the
specified rate or less. DESCEND AT (vertical rate)
OR LESS W/U UM174 DESCEND
AT (vertical rate)
MAXIMUM UM174 DESCEND
AT (vertical rate)
MAXIMUM
LVLU -22 Notification that a clearance
may be issued for the aircraft to
commence a climb to the specified level at the specified number of minutes after
departure. EXPECT (level single)
(number of minutes) AFTER
DEPARTURE R UM169 ‘EXPECT
(level single) (number of minutes) AFTER
DEPARTURE’ N/A
LVLU -23 Instruction to report upon
leaving the specified level. REPORT LEAVING (level
single) W/U UM128 REPORT
LEAVING (altitude)
Note: R response
attribute. N/A
LVLU -24 Instruction to report upon
maintaining the specified level. REPORT MAINTAINING
(level single) W/U UM129 REPORT
LEVEL (altitude)
Note: R response
attribute. N/A
LVLU -25 Instruction to report the present
level. REPORT PRESENT LEVEL Y N/A
Note: Refer to A.6 . UM133 REPORT
PRESENT LEVEL
LVLU -26 Instruction to report upon
reaching the specified vertical range. REPORT REACHING
BLOCK (level single) TO
(level single) W/U UM180 REACHING
BLOCK (altitude) TO
(altitude)
Note: R response
attribute. N/A
F-18
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLU -27 Request to confirm the assigned
level. CONFIRM ASSIGNED
LEVEL Y UM135 CONFIRM
ASSIGNED
ALTITUDE
Note: NE response
attribute. N/A
LVLU -28 Request to provide the preferred
level. ADVISE PREFERRED
LEVEL Y UM169 ‘ADVISE
PREFERRED LEVEL’
Note: R response
attribute. UM231 STATE
PREFERRED LEVEL
LVLU -29 Request to provide the preferred
time and/or position to
commence descent to the
aerodrome of intended arrival. ADVISE TOP OF DESCENT Y UM169 ‘ADVISE
TOP OF DESCENT’
Note: R response
attribute. UM232 STATE TOP
OF DESCENT
LVLU -30 Request for the earliest time or
position when the specified level
can be accepted. WHEN CAN YOU ACCEPT
(level single) Y UM148 WHEN CAN
YOU ACCEPT (altitude)
Note: NE response
attribute. UM148 WHEN CAN
YOU ACCEPT (level)
LVLU -31 Request to indicate whether or
not the specified level can be accepted at the specified
position. CAN YOU ACCEPT (level
single) AT (position) A/N UM149 CAN YOU
ACCEPT (altitude)
AT (position) N/A
LVLU -32 Request to indicate whether or
not the specified level can be
accepted at the specified time. CAN YOU ACCEPT (level
single) AT TIME (time) A/N UM150 CAN YOU
ACCEPT (altitude)
AT (time) N/A
LVLU -33 Instruction to expedite a descent
to the specified level is to commence and once reached the
specified level is to be
maintained. EXPEDITE DESCENT TO
(level single) W/U UM37 EXPEDITE
DESCENT TO
(altitude) N/A
F-19
10/3/17 AC 90 -117
Appendix F
Table F -9. Level Downlink Message Elements (LVLD )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLD -1 Request to fly at the specified
level or vertical range. REQUEST (level) Y DM6 REQUEST
(altitude)
Note: Used for a single
level.
DM7 REQUEST
BLOCK (altitude) TO
(altitude)
Note: Used for a vertical
range. DM6 REQUEST
(level)
LVLD -2 Request for a climb to the
specified level or vertical range. REQUEST CLIMB TO (level) Y DM9 REQUEST CLIMB
TO (altitude)
Note: Use of DM7
REQUEST BLOCK (altitude) TO (altitude) to request to climb at a
vertical range. DM9 REQUEST
CLIMB TO (level)
LVLD -3 Request for a descent to the
specified level or vertical range. REQUEST DESCENT TO
(level) Y DM10 REQUEST
DESCENT TO (altitude)
Note: Use of DM7 REQUEST BLOCK
(altitude) TO (altitude) to request to descend at a
vertical range. DM10 REQUEST
DESCENT TO (level)
F-20
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLD -4 Request for a climb/descent to
the specified level or vertical
range to commence at the
specified position. AT (position) REQUEST
(level) Y DM11 AT (position)
REQUEST CLIMB TO
(altitude)
Note: A vertical range
cannot be requested.
DM12 AT (position)
REQUEST DESCENT
TO (altitude)
Note: A vertical range
cannot be requested. N/A
LVLD -5 Request for a climb/descent to
the specified level or vertical
range to commence at the specified time. AT TIME (time) REQUEST
(level) Y DM13 AT TIME (time)
REQUEST CLIMB TO
(altitude)
Note: A vertical range
cannot be requested.
DM14 AT TIME (time)
REQUEST DESCENT
TO (altitude)
Note: A vertical range
cannot be requested. N/A
LVLD -6 Request for the earliest time or
position that a descent can be
expected. WHEN CAN WE EXPECT
LOWER LEVEL Y DM52 WHEN CAN WE
EXPECT LOWER
ALTITUDE N/A
LVLD -7 Request for the earliest time or
position that a climb can be
expected. WHEN CAN WE EXPECT
HIGHER LEVEL Y DM53 WHEN CAN WE
EXPECT HIGHER
ALTITUDE N/A
LVLD -8 Report indicating leaving the
specified level. LEAVING (level single) N DM28 LEAVING
(altitude) N/A
LVLD -9 Report indicating that the
specified level is being
maintained. MAINTAINING (level single) N DM37 LEVEL (altitude) N/A
F-21
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLD -10 Report indicating reaching the
specified vertical range. REACHING BLOCK (level
single) TO (level single) N DM76 REACHING
BLOCK (altitude) TO
(altitude) N/A
LVLD -11 Confirmation that the assigned
level or vertical range is the
specified level or vertical range. ASSIGNED LEVEL (level) N DM38 ASSIGNED ALTITUDE (altitude)
Note: Used for a single
level .
DM77 ASSIGNED
BLOCK (altitude) TO
(altitude)
Note: Used for a vertical
range . DM38 ASSIGNED
LEVEL (level)
LVLD -12 Report indicating that the
aircraft’s preferred level is the
specified level. PREFERRED LEVEL (level single) N DM67‘PREFERRED
LEVEL (altitude) ’
Note 1: Response to free text UM169 ‘ADVISE PREFERRED LEVEL’
Note 2: When
pre-formatting of the
downlink message is not
available, the pilot can
shorten to: FL (altitude). DM106 PREFERRED
LEVEL (level)
Note A vertical range
may be provided.
LVLD -13 Report indicating climbing to the specified level. CLIMBING TO (level single) N DM29 CLIMBING TO
(altitude) N/A
F-22
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
LVLD -14 Report indicating descending to
the specified level. DESCENDING TO (level
single) N DM30 DESCENDING
TO (altitude)
Note: N alert attribute.
DM61 DESCENDING TO (altitude)
Note: Urgent alert
attribute. N/A
LVLD -15 Indication that the specified level
can be accepted at the specified time. WE CAN ACCEPT (level
single) AT TIME (time) N DM67 ‘WE CAN ACCEPT (altitude) AT
TIME (time) ’ DM81 WE CAN
ACCEPT (level) AT
(time)
Note: A vertical range
may be provided.
LVLD -16 Indication that the specified level
can be accepted at the specified
position. WE CAN ACCEPT (level
single) AT (position) N DM67 ‘WE CAN ACCEPT (altitude) AT
(position) ’ N/A
LVLD -17 Indication that the specified level
cannot be accepted. WE CANNOT ACCEPT (level single) N DM67. ‘WE CANNOT
ACCEPT (altitude) ’ DM82 WE CANNOT
ACCEPT (level)
Note: A vertical range
may be provided.
LVLD -18 Notification of the preferred time
and position to commence
descent for approach. TOP OF DESCENT (position)
TIME (time) N DM67 ‘TOP OF
DESCENT (time) ’
Note: When
pre-formatting of the
downlink message is not
available, the pilot can
shorten to:
TOD (time). DM109 TOP OF
DESCENT (time)
LVLD -19 Notification of the present level. Present level (single level) N N/A
Note: Refer to A.6 . DM32 PRESENT
LEVEL (altitude)
F-23
10/3/17 AC 90 -117
Appendix F
Table F -10. Crossing Constraint Uplink Messages (CSTU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
CSTU -1 Instruction that the specified
position is to be crossed at the
specified level or within the specified vertical range. CROSS (position) AT (level) W/U UM46 CROSS
(position) AT
(altitude)
Note: Used for a single
level. UM46 CROSS
(position) AT (level)
CSTU -1 Instruction that the specified
position is to be crossed at the specified level or within the specified vertical range. CROSS (position) AT (level) UM50 CROSS
(position) BETWEEN
(altitude) AND
(altitude)
Note: Used for a
vertical range. UM46 CROSS
(position) AT (level)
CSTU -1 Instruction that the specified
position is to be crossed at the specified level or within the specified vertical range. CROSS (position) AT (level) W/U UM49 CROSS
(position) AT
AND MAINTAIN
(altitude)
Note 1: A vertical
range cannot be
provided.
Note 2: This message
element is equivalent
to CSTU -1 plus
LVLU -5 in
ICAO Doc 4444. N/A
CSTU -2 Instruction that the specified
position is to be crossed at or
above the specified level. CROSS (position) AT OR
ABOVE (level single) W/U UM47 CROSS
(position) AT OR
ABOVE (altitude) UM47 CROSS
(position) AT OR
ABOVE (level)
CSTU -3 Instruction that the specified
position is to be crossed at or
below the specified level. CROSS (position) AT OR
BELOW (level single) W/U UM48 CROSS
(position) AT OR
BELOW (altitude) UM48 CROSS
(position) AT OR
BELOW (level)
F-24
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
CSTU -4 Instruction that the specified
position is to be crossed at the
specified time. CROSS (position) AT TIME
(time) W/U UM51 CROSS
(position) AT (time) UM51 CROSS
(position) AT (time)
CSTU -5 Instruction that the specified
position is to be crossed before
the specified time. CROSS (position) BEFORE
TIME (time) W/U UM52 CROSS
(position) AT OR
BEFORE (time) UM52 CROSS
(position) AT OR
BEFORE (time)
CSTU -6 Instruction that the specified
position is to be crossed after the
specified time. CROSS (position) AFTER
TIME (time) W/U UM53 CROSS
(position) AT OR
AFTER (time) UM53 CROSS
(position) AT OR
AFTER (time)
CSTU -7 Instruction that the specified
position is to be crossed between
the specified times. CROSS (position)
BETWEEN TIME (time)
AND TIME (time) W/U UM54 CROSS
(position) BETWEEN
(time) AND (time) UM54 CROSS
(position) BETWEEN
(time) AND (time)
CSTU -8 Instruction that the specified
position is to be crossed at the
specified speed. CROSS (position) AT (speed) W/U UM55 CROSS
(position) AT (speed) UM55 CROSS
(position) AT (speed)
CSTU -9 Instruction that the specified
position is to be crossed at or
less than the specified speed. CROSS (position) AT
(speed) OR LESS W/U UM56 CROSS
(position) AT OR
LESS THAN (speed) N/A
CSTU -10 Instruction that the specified
position is to be crossed at or
greater than the specified speed. CROSS (position) AT
(speed) OR GREATER W/U UM57 CROSS
(position) AT OR
GREATER THAN
(speed) N/A
F-25
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
CSTU -11 Instruction that the specified
position is to be crossed at the specified time and at the level or within the vertical range as specified. CROSS (position) AT TIME
(time) AT (level) W/U UM58 CROSS
(position) AT (time)
AT (altitude)
Note: A vertical range
cannot be provided.
UM62 AT (time)
CROSS (position) AT
AND MAINTAIN
(altitude)
Note 1: A vertical
range cannot be
provided.
Note 2: This message
element is equivalent
to CSTU -11 plus
LVLU -5 in
ICAO Doc 4444. N/A
CSTU -12 Instruction that the specified
position is to be crossed before the specified time and at the level or within the vertical range as specified. CROSS (position) BEFO RE
TIME (time) AT (level) W/U UM59 CROSS
(position) AT OR
BEFORE (time) AT (altitude)
Note: A vertical range
cannot be provided. N/A
CSTU -13 Instruction that the specified
position is to be crossed after the
specified time and at the level or
within the vertical range as specified. CROSS (position) AFTER
TIME (time) AT (level) W/U UM60 CROSS
(position) AT OR
AFTER (time) AT (altitude)
Note: A vertical range
cannot be provided. N/A
F-26
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
CSTU -14 Instruction that the specified
position is to be crossed at the
level or within the vertical range, as specified, and at the specified speed. CROSS (position) AT (level)
AT (speed) W/U UM61 CROSS
(position) AT AND
MAINTAIN (altitude)
AT (speed)
Note 1: A vertical
range cannot be
provided.
Note 2: This message
element is equivalent
to CSTU -14 plus
LVLU -5 in
ICAO Doc 4444. UM61 CROSS
(position) AT AND
MAINTAIN (level)
AT (speed)
CSTU -15 Instruction that the specified
position is to be crossed at the specified time at the level or
within the vertical range, as
specified, and at the specified speed. CROSS (position) AT TIME
(time) AT (level) AT (speed) W/U UM63 AT (time)
CROSS (position) AT
AND MAINTAIN
(altitude) AT (speed)
Note 1: A vertical
range cannot be
provided.
Note 2: This message
element is equivalent
to CSTU -15 plus
LVLU -5 in
ICAO Doc 4444. N/A
F-27
10/3/17 AC 90 -117
Appendix F
Table F-11. Speed Uplink Messages (SPDU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPDU -1 Notification that a speed
instruction may be issued to take
effect at the specified time. EXPECT SPEED CHANGE
AT TIME (time) R UM100 AT (time)
EXPECT (speed) N/A
SPDU -2 Notification that a speed
instruction may be issued to take
effect at the specified position. EXPECT SPEED CHANGE
AT (position) R UM101 AT (position)
EXPECT (speed) N/A
SPDU -3 Notification that a speed
instruction may be issued to take
effect at the specified level. EXPECT SPEED CHANGE
AT (level single) R UM102 AT (altitude)
EXPECT (speed) N/A
SPDU -4 Instruction to maintain the
specified speed. MAINTAIN (speed) W/U UM106 MAINTAIN
(speed) UM106 MAINTAIN
(speed)
SPDU -5 Instruction to maintain the
present speed. MAINTAIN PRESENT
SPEED W/U UM107 MAINTAIN
PRESENT SPEED UM107 MAINTAIN
PRESENT SPEED
SPDU -6 Instruction to maintain the
specified speed or a greater. MAINTAIN (speed) OR
GREATER W/U UM108 MAINTAIN
(speed) OR
GREATER UM108 MAINTAIN
(speed) OR
GREATER
SPDU -7 Instruction to maintain the
specified speed or a less. MAINTAIN (speed) OR
LESS W/U UM109 MAINTAIN
(speed) OR LESS UM109 MAINTAIN
(speed) OR LESS
SPDU -8 Instruction to maintain the
specified speed range. MAINTAIN (speed) TO
(speed) W/U UM110 MAINTAIN
(speed) TO (speed) N/A
SPDU -9 Instruction that the present
speed is to be increased to the
specified speed and maintained
until further advised. INCREASE SPEED TO
(speed) W/U UM111 INCREASE
SPEED TO (speed) N/A
F-28
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPDU -10 Instruction that the present
speed is to be increased to the
specified speed or greater, and maintained at or above the specified speed until further
advised. INCREASE SPEED TO
(speed) OR GREATER W/U UM112 INCREASE
SPEED TO (speed)
OR GREATER N/A
SPDU -11 Instruction that the present
speed is to be reduced to the specified speed and maintained
until further advised. REDUCE SPEED TO (speed) W/U UM113 REDUCE
SPEED TO (speed) N/A
SPDU -12 Instruction that the present
speed is to be reduced to the
specified speed or less and
maintained at or below the specified speed until further
advised. REDUCE SPEED TO (speed)
OR LESS W/U UM114 REDUCE
SPEED TO (speed)
OR LESS N/A
SPDU -13 Instruction to resume a normal
speed. The aircraft no longer needs to comply with a previously issued speed
restriction. RESUME NORMAL SPEED W/U UM116 RESUME
NORMAL SPEED UM116 RESUME
NORMAL SPEED
SPDU -14 Indication that the preferred
speed may be flown without
restriction. NO SPEED RESTRICTION R UM169 ‘NO SPEED
RESTRICTION’ UM222 NO SPEED
RESTRICTION
F-29
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPDU -15 Request to report the speed
defined by the speed type(s). REPORT (speed types)
SPEED Y UM134 CONFIRM
SPEED
Note: NE response
attribute.
UM169 ‘REPORT
GROUND SPEED’
Note 1: Used when the
controller is
requesting the pilot to
report the present
ground speed.
Note 2: R response
attribute. N/A
SPDU -16 Request to confirm the assigned
speed. CONFIRM ASSIGNED
SPEED Y UM136 CONFIRM
ASSIGNED SPEED Note: NE response
attribute. N/A
SPDU -17 Request for the earliest time or
position when the specified
speed can be accepted. WHEN CAN YOU ACCEPT
(speed) Y UM151 WHEN CAN
YOU ACCEPT
(speed)
Note: NE response
attribute. N/A
F-30
10/3/17 AC 90 -117
Appendix F
Table F -12. Speed Downlink Messages (SPDD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPDD -1 Request for the specified speed. REQUEST (speed) Y DM18 REQUEST
(speed) DM18 REQUEST
(speed)
SPDD -2 Request for the earliest time or
position that the specified speed
can be expected. WHEN CAN WE EXPECT
(speed) Y DM49 WHEN CAN WE
EXPECT (speed) N/A
SPDD -3 Report indicating the speed
defined by the specified speed
types. (speed types) SPEED (speed) N DM34 PRESENT
SPEED (speed)
DM67 ‘GROUND
SPEED (speed) ’
Note 1: Used when the
controller is requesting
the pilot to report the
present ground speed.
Note 2: When
pre-formatting of the
downlink message is not
available, the pilot can
shorten to GS (speed). N/A
SPDD -4 Confirmation that the assigned
speed is the specified speed. ASSIGNED SPEED (speed) N DM39 ASSIGNED
SPEED (speed) N/A
SPDD -5 Indication that the specified
speed can be accepted at the
specified time. WE CAN ACCEPT (speed) AT
TIME (time) N DM67 ‘WE CAN
ACCEPT (speed) AT
TIME (time) ’ N/A
SPDD -6 Indication that the specified
speed cannot be accepted. WE CANNOT ACCEPT
(speed) N DM67 ‘WE CANNOT
ACCEPT (speed) ’ N/A
F-31
10/3/17 AC 90 -117
Appendix F
Table F -13. Air Traffic Advisory Uplink Messages (ADVU )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
ADVU -1 Advisory providing the specified
altimeter setting for the
specified facility. (facility designation)
ALTIMETER (altimeter
setting) R UM153 ALTIMETER
(altimeter)
Note: The facility
designation and the
time of measurement
cannot be provided.
UM169 ‘ (facility
designation)
ALTIMETER
(altimeter setting) ’ UM213 (facility
designation)
ALTIMETER
(altimeter)
Note: The facility
designation is always
provided and the time
of measurement
cannot be provided.
ADVU -2 Advisory that the ATS
surveillance service is
terminated. SURVEILLANCE SERVICE
TERMINATED R UM154 RADAR
SERVICES
TERMINATED
UM169
‘SURVEILLANCE
SERVICE
TERMINATED’
Note: ATS advisory
that the radar and/or
ADS-B service is
terminated. N/A
ADVU -3 Advisory that ATS surveillance
service has been established. A
position may be specified
position. IDENTIFIED (position[O]) R UM155 RADAR
CONTACT (position)
Note: The provision of
the position is
required. N/A
ADVU -4 Advisory that ATS surveillance
contact has been lost. IDENTIFICATION LOST R UM156 RADAR
CONTACT LOST N/A
F-32
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
ADVU -5 ATS advisory that the current
ATIS code is as specified. ATIS (ATIS code) R UM158 ATIS
(ATIS code)
Note: The airport is
not provided. N/A
ADVU -6 Advisory to request again with
next ATC unit. REQUEST AGAIN WITH
NEXT ATC UNIT N UM169 ‘REQUEST
AGAIN WITH NEXT
ATC UNIT’
Note: R response
attribute. UM237 REQUEST
AGAIN WITH NEXT ATC UNIT
ADVU -7 Advisory of traffic significant to
the flight. TRAFFIC IS
(traffic description) R UM169 ‘TRAFFIC IS
(traffic description) ’ N/A
ADVU -8 Instruction to report that the
specified traffic has been visually sighted and passed. The
instruction may indicate the
estimated time of passing. REPORT SIGHTING AND
PASSING OPPOSITE
DIRECTION
(aircraft type[O])
(traffic location)
(ETP time[O]) W/U UM169 ‘REPORT
SIGHTING AND
PASSING OPPOSITE
DIRECTION
(traffic description)
(ETP (time)) ’
Note: ETP Time is
included when
available. N/A
ADVU -9 Instruction to select the
specified SSR code. SQUAWK (SSR code) W/U UM123 SQUAWK
(beacon code) UM123 SQUAWK
(code)
ADVU -10 Instruction to disable SSR
transponder responses. STOP SQUAWK W/U UM124 STOP
SQUAWK N/A
ADVU -11 Instruction to stop ADS -B
transmissions. STOP ADS -B
TRANSMISSION W/U UM169 ‘STOP ADS -B
TRANSMISSION’
Note: R response
attribute. N/A
ADVU -12 Instruction to include level
information in the SSR
transponder responses. SQUAWK MODE C W/U UM125 SQUAWK
ALTITUDE N/A
F-33
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
ADVU -13 Instruction to stop including
level information in the SSR
transponder responses. STOP SQUAWK MODE C W/U UM126 STOP
ALTITUDE
SQUAWK N/A
ADVU -14 Request to confirm the selected
SSR code. CONFIRM SQUAWK CODE Y UM144 CONFIRM
SQUAWK
Note: NE response
attribute. N/A
ADVU -15 Instruction that the ‘ident’
function on the SSR transponder
is to be actuated. SQUAWK IDENT W/U UM179 SQUAWK
IDENT UM179 SQUAWK
IDENT
ADVU -16 Instruction to activate the ADS -
C capability. ACTIVATE ADS -C W/U UM169 ‘ACTIVATE
ADS C ’
Note: R response
attribute. N/A
ADVU -17 Instruction to transmit voice
position reports, as specified,
due to ADS -C being out of
service. ADS -C OUT OF SERVICE
REVERT TO VOICE
POSITION REPORTS W/U UM169 ‘ADS -C OUT
OF SERVICE
REVERT TO CPDLC
POSITION
REPORTS’
UM169 ‘ADS -C OUT
OF SERVICE
REVERT TO VOICE
POSITION
REPORTS’
Note: R response
attribute. N/A
ADVU -18 Instruction to intermediary
aircraft to relay the specified
message to the specified aircraft
on the specified frequency,
when provided. RELAY TO
(aircraft identification)
(unit name) (relay text)
(frequency[O]) W/U UM169 ‘RELAY TO
(call sign) (unit name)
(text of message to be
relayed) ((frequency))’
Note 1: R response
attribute. N/A
F-34
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
Note 2: Frequency is
included when
available.
ADVU -19 Request to check the aircraft
lateral position, level or speed,
due to the ATC unit detecting a
deviation from the clearance. (deviation type) DEVIATION
DETECTED. VERIFY AND
ADVISE W/U UM169 ‘LATERAL
POSITION
DEVIATION
DETECTED. VERIFY
AND ADVISE’
UM169 ‘LEVEL
DEVIATION
DETECTED. VERIFY
AND ADVISE’
UM169 ‘SPEED
DEVIATION
DETECTED. VERIFY
AND ADVISE’
Note: R response
attribute. N/A
ADVU -20 Notification that the CPDLC
transfer is expected at the
specified time. EXPECT CPDLC
TRANSFER AT TIME (time) R UM169 ‘EXPECT
CPDLC TRANSFER AT TIME (time) ’
Note: R response
attribute. N/A
ADVU -21 Notification that the first
specified ATS U will not
establish CPDLC and the NDA
is expected to be the second
specified ATS U. CPDLC WITH (unit name)
NOT REQUIRED EXPECT
NEXT CPDLC FACILITY
(unit name) R UM169 CPDLC WITH
(unit name) NOT
REQUIRED EXPECT
NEXT CPDLC
FACILITY (unit name)
Note: R response
attribute. N/A
F-35
10/3/17 AC 90 -117
Appendix F
Table F -14. Air Traffic Advisory Downlink Messages (ADVD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
ADVD -1 Report indicating that the aircraft
is squawking the specified SSR
code. SQUAWKING (SSR code) N DM47 SQUAWKING
(code) N/A
ADVD -2 Report indicating that whether or
not traffic has been visually
sighted and if so, if it has been
passed. May provide a description and/or location of the
aircraft. TRAFFIC (aircraft type[ O])
(traffic location)
(traffic visibility) N DM67 ‘ (traffic
identification) SIGHTED
AND PASSED’
DM67 ‘ (traffic
identification) NOT
SIGHTED’
DM67 ‘TRAFFIC
SIGHTED’ N/A
F-36
10/3/17 AC 90 -117
Appendix F
Table F-15. Voice Communication Uplink Messages (COMU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
COMU -1 Instruction to establish voice
contact with the specified ATSU
on the specified frequency. CONTACT (unit name)
(frequency) W/U UM117 CONTACT
(ICAO unit name)
(frequency) UM117 CONTACT
(unit name)
(frequency)
COMU -2 Instruction at the specified
position, to establish voice
contact with the specified ATSU
on the specified frequency. AT (position) CONTACT
(unit name) (frequency) W/U UM118 AT (position)
CONTACT (ICAO unit
name) (frequency) N/A
COMU -3 Instruction at the specified time,
to establish voice contact with the specified ATSU on the
specified frequency. AT TIME (time) CONTACT
(unit name) (frequency) W/U UM119 AT (time)
CONTACT (ICAO unit
name) (frequency) N/A
COMU -4 Advisory of the secondary
frequency. SECONDARY FREQUENCY
(frequency) R UM169
‘SECONDARY FREQUENCY
(frequency) ’ N/A
COMU -5 Instruction to monitor the
specified ATSU on the specified
frequency. The pilot is not
required to establish voice
contact on the frequency. MONITOR (unit name)
(frequency) W/U UM120 MONITOR
(ICAO unit name)
(frequency) UM120 MONITOR
(unit name) (frequency)
COMU -6 Instruction at the specified
position, to monitor the
specified ATSU on the specified
frequency. The pilot is not
required to establish voice
contact on the frequency. AT (position) MONITOR
(unit name) (frequency) W/U UM121 AT (position)
MONITOR (ICAO unit
name) (frequency) N/A
F-37
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
COMU -7 Instruction that at the specified
time, to monitor the specified
ATSU on the specified
frequency. The pilot is not
required to establish voice
contact on the frequency. AT TIME (time) MONITOR
(unit name) (frequency) W/U UM122 AT (time)
MONITOR (ICAO unit
name) (frequency) N/A
COMU -8 Instruction to check the
microphone due to detection of a
continuous transmission on the
specified frequency. CHECK STUCK
MICROPHONE (frequency) N UM157 CHECK
STUCK
MICROPHONE
(frequency)
Note: R response
attribute . UM157 CHECK
STUCK
MICROPHONE
(frequency)
COMU -9 Advisory of the name of the
current ATC unit. CURRENT ATC UNIT
(unit name) N N/A UM183 ‘CURRENT
ATC UNIT
(unit name) ’
F-38
10/3/17 AC 90 -117
Appendix F
Table F -16. Voice Communication Downlink Messages (COMD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
COMD -1 Request for voice contact on the
specified frequency. REQUEST VOICE CONTACT
(frequency) Y DM20 REQUEST
VOICE CONTACT
Note: Used when a
frequency is not required.
DM21 REQUEST
VOICE CONTACT
(frequency)
Note: Used when a
frequency is required . N/A
COMD -2 Notification from the
intermediary aircraft of the
specified response from the
specified aircraft. RELAY FROM
(aircraft identification)
(relayed text response) N DM67 ‘RELAY FROM
(call sign) (response parameters) ’ N/A
F-39
10/3/17 AC 90 -117
Appendix F
Table F-17. Spacing Uplink Messages (SPCU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPCU -1 ATS acknowledgement for the
pilot use of the in -trail procedure
when the ITP aircraft is behind
the reference aircraft. This
message element is always
concatenated with a vertical
clearance. ITP BEHIND
(aircraft identification) N UM169 ‘ITP BEHIND
(aircraft identification) ’
Note: R response attribute. N/A
SPCU -2 ATS acknowledgement for the
pilot use of the in -trail procedure
when the ITP aircraft is ahead of
the reference aircraft. This message element is always concatenated with a vertical
clearance. ITP AHEAD OF
(aircraft identification) N UM169 ‘ITP AHEAD
OF (aircraft
identification) ’
Note: R response attribute. N/A
SPCU -3 ATS acknowledgement for the
pilot use of the in -trail procedure
when the ITP aircraft is behind
both reference aircraft. This
message element is always
concatenated with a vertical
clearance. ITP BEHIND (aircraft
identification) AND BEHIND
(aircraft identification) N UM169 ‘ITP BEHIND
(aircraft identification)
AND BEHIND
(aircraft
identification) ’
Note: R response
attribute. N/A
SPCU -4 ATS acknowledgement for the
pilot use of the in -trail procedure
when the ITP aircraft is ahead of
both reference aircraft. This message element is always
concatenated with a vertical
clearance. ITP AHEAD OF (aircraft
identification) AND AHEAD
OF (aircraft identification) N UM169 ‘ITP AHEAD
OF (aircraft
identification) AND
AHEAD OF (aircraft
identification) ’
Note: R response
attribute. N/A
F-40
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPCU -5 ATS acknowledgement for the
pilot use of the in -trail procedure
when the ITP aircraft is behind
one reference aircraft and ahead of one reference aircraft. This message element is always
concatenated with a vertical
clearance. ITP BEHIND (aircraft
identification) AND AHEAD
OF (aircraft identification) N UM169 ‘ITP BEHIND
(aircraft identification)
AND AHEAD OF
(aircraft identification) ’
Note: R response
attribute. N/A
F-41
10/3/17 AC 90 -117
Appendix F
Table F-18. Spacing Downlink Messages (SPCD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPCD -1 Advisory indicating that the pilot
has the ITP equipment, and
provides the specified distance to
the reference aircraft, including
aircraft identification. This
message element is always
concatenated with a vertical
request. ITP (specified distance)
BEHIND (aircraft
identification) N DM67 ‘ITP (distance)
BEHIND (aircraft
identification) ’ N/A
SPCD -2 Advisory indicating that the pilot
has the ITP equipment, and
provides the specified distance from the reference aircraft, including aircraft identification.
This message element is always
concatenated with a vertical
request. ITP (specified distance)
AHEAD OF (aircraft
identification) N DM67 ‘ITP (distance)
AHEAD OF (aircraft
identification) ’ N/A
SPCD -3 Advisory indicating that the pilot
has the ITP equipment, and
provides the specified distance to
both reference aircraft, including
aircraft identification. This
message element is always
concatenated with a vertical
request. ITP (specified distance)
BEHIND (aircraft
identification) AND (specified
distance) BEHIND (aircraft
identification) N DM67 ‘ITP (distance)
BEHIND (aircraft
identification ) AND
(distance) BEHIND
(aircraft identification')’
Note: Used with a
vertical request,
indicating an ITP request
when there are two reference aircraft, both
behind. N/A
F-42
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SPCD -4 Advisory indicating that the pilot
has the ITP equipment, and
provides the specified distance from both reference aircraft, including aircraft identification.
This message element is always
concatenated with a vertical request. ITP (specified distance)
AHEAD OF (aircraft
identification) AND (specified
distance) AHEAD OF (aircraft
identification) N DM67 ‘ITP (distance)
AHEAD OF (aircraft
identification) AND
(distance) AHEAD OF
(aircraft identification)’
Note: Used with a vertical request,
indicating an ITP request
when there are two reference aircraft, both
ahead. N/A
SPCD -5 Advisory indicating that the pilot
has the ITP equipment, and
provides the specified distance to
one reference aircraft and the specified distance from another reference aircraft, including aircraft identification. This message element is always
concatenat ed with a vertical
request. ITP (specified distance)
BEHIND (aircraft
identification) AND (specified
distance) AHEAD OF (aircraft
identification) N DM67 ‘ITP (distance)
BEHIND (aircraft
identification) AND
(distance) AHEAD OF
(aircraft identification)’
Note: Used with a
vertical request,
indicating an ITP request
when there are two
reference aircraft, one behind and the other
ahead. N/A
F-43
10/3/17 AC 90 -117
Appendix F
Table F -19. Emergency/Urgency Uplink Messages (EMGU )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
EMGU -1 Request to provide the fuel
remaining (time) and the
number of persons on board. REPORT ENDURANCE
AND PERSONS ON BOARD Y UM131 REPORT
REMAINING FUEL
AND SOULS ON
BOARD
Note: NE response
attribute. N/A
EMGU -2 Instruction to immediately
comply with the associated
instruction to avoid imminent
situation. IMMEDIATELY N Used in combination
with LVLU -6 and
LVLU -9, which is
implemented in
FANS 1/A as:
UM38 IMMEDIATELY
CLIMB TO (altitude)
UM39
IMMEDIATELY
DESCEND TO
(altitude) N/A
EMGU -3 Request to confirm an ADS - C
indicated emergency. CONFIRM ADS -C
EMERGENCY A/N UM169 ‘CONFIRM
ADS -C
EMERGENCY’
Note: R response
attribute. N/A
F-44
10/3/17 AC 90 -117
Appendix F
Table F -20. Emergency/Urgency Downlink Messages (EMGD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
EMGD -1 Indication of an urgent situation. PAN PAN PAN Y DM55 PAN PAN PAN
Note: N response
attribute. N/A
EMGD -2 Indication of an emergency
situation. MAYDAY MAYDAY
MAYDAY Y DM56 MAYDAY
MAYDAY MAYDAY
Note: N response
attribute. N/A
EMGD -3 Report indicating fuel remaining
(time) and number of persons on
board. (remaining fuel)
ENDURANCE AND (persons
on board) PERSONS ON
BOARD Y DM57 (remaining fuel)
OF FUEL REMAINING
AND (remaining souls)
SOULS ON BOARD
Note: N response
attribute. N/A
EMGD -4 Indication that the emergency
situation is cancelled. CANCEL EMERGENCY Y DM58 CANCEL
EMERGENCY
Note: N response
attribute. N/A
F-45
10/3/17 AC 90 -117
Appendix F
Table F-21. Standard Response Uplink Messages (RSPU )
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RSPU -1 Indication that the message
cannot be complied with. UNABLE N UM0 UNABLE UM0 UNABLE
RSPU -2 Indication that the message will
be responded to shortly. STANDBY N UM1 STANDBY UM1 STANDBY
RSPU -3 Indication that a long term delay
in response can be expected. REQUEST DEFERRED N UM2 REQUEST
DEFERRED N/A
RSPU -4 Indication that the message is
received. ROGER N UM3 ROGER
UM169 ‘ROGER
MAYDAY’
Note 1: R response attribute.
Note 2 : Used to
acknowledge emergency downlink
reports.
UM169 ‘ROGER
PAN’
Note 1: R response
attribute.
Note 2 : Used to
acknowledge urgency
downlink reports . UM3 ROGER
RSPU -5 Indication that ATC is
responding positively to the
message. AFFIRM N UM4 AFFIRM UM4 AFFIRM
RSPU -6 Indication that ATC is
responding negatively to the
message. NEGATIVE N UM5 NEGATIVE UM5 NEGATIVE
F-46
10/3/17 AC 90 -117
Appendix F
Operational Definition in PANS- ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RSPU -7 Indication that the request has
been forwarded to the next
control unit. REQUEST FORWARDED N UM169 ‘REQUEST
FORWARDED’
Note: R response
attribute. UM211 REQUEST
FORWARDED
RSPU -8 Request to confirm the referenced request since the
initial request was not
understood. The request should
be clarified and resubmitted. CONFIRM REQUEST N UM143 CONFIRM
REQUEST N/A
Table F -22. Standard Response Downlink Messages (RSPD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
RSPD -1 Indication that the instruction is
understood and will be complied
with. WILCO N DM0 WILCO DM0 WILCO
RSPD -2 Indication that the instruction
cannot be complied with. UNABLE N DM1 UNABLE DM1 UNABLE
RSPD -3 Indication that the message will
be responded to shortly. STANDBY N DM2 STANDBY DM2 STANDBY
RSPD -4 Indication that the message is
received. ROGER N DM3 ROGER
Note: ROGER is the only
correct response to an
uplink free text message. DM3 ROGER
RSPD -5 Indication of a positive response
to a message. AFFIRM N DM4 AFFIRM DM4 AFFIRM
RSPD -6 Indication of a negative response
to a message. NEGATIVE N DM5 NEGATIVE DM5 NEGATIVE
F-47
10/3/17 AC 90 -117
Appendix F
Table F -23. Supplemental Uplink Messages (SUPU )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SUPU -1 Indication that the associated
instruction is to be executed
when the pilot is ready. WHEN READY N UM164 WHEN
READY N/A
SUPU -2 Indication that the associated
message is issued due to the
specified reason. DUE TO (specified reason
uplink) N UM166 DUE TO
TRAFFIC
UM167 DUE TO
AIRSPACE
RESTRICTION N/A
SUPU -3 Instruction to execute the
associated instruction at the
aircraft’s best performance rate. EXPEDITE N Used in combination
with LVLU -6, which is
implemented in FANS
1/A as:
UM36 EXPEDITE
CLIMB TO (altitude) . N/A
SUPU -4 Indication that the associated
instruction is either a revision to a previously issued instruction
or is different from the requested
clearance. REVISED
(revision reason[O]) N UM170 ‘REVISED
(revision reason[O]) ’
Note: R response
attribute. N/A
SUPU -5 Indication that the associated
instruction is to be executed at
the earliest point when the pilot
is able. WHEN ABLE N N/A
Note: This message
element is part of
UM75. N/A
F-48
10/3/17 AC 90 -117
Appendix F
Table F -24. Supplemental Downlink Messages (SUPD )
Operational Definition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SUPD -1 Indication that the associated
message is issued due to
specified reason. DUE TO (specified reason
downlink) N DM65 DUE TO
WEATHER DM65 DUE TO
WEATHER
SUPD -1 Indication that the associated
message is issued due to
specified reason. DUE TO (specified reason
downlink) N DM66 DUE TO
AIRCRAFT
PERFORMANCE DM66 DUE TO
AIRCRAFT
PERFORMANCE
Table F -25. Free Text Uplink Messages (TXTU )
Operational D efinition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
TXTU -1 (free text)
Note: M alert attribute. R UM169 (free text) UM203 (free text)
TXTU -2 (free text)
Note: M alert attribute. N UM169 (free text)
Note: R response
attribute. UM183 (free text)
TXTU -3 (free text)
Note: N alert attribute. N UM169 (free text)
Note: R response
attribute. N/A
TXTU -4 (free text)
Note: M alert attribute. W/U UM169 (free text)
Note: R response
attribute. UM196 (free text)
TXTU -5 (free text)
Note: M alert attribute. A/N UM169 (free text)
Note: R response
attribute. UM205 (free text)
F-49
10/3/17 AC 90 -117
Appendix F
Table F-26. Free Text Downlink Messages (TXTD )
Operational D efinition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended Use Format for Message Element
Display Resp. FANS 1/A ATN B1
TXTD -1 (free text)
Note: M alert attribute. Y DM68 (free text)
Note 1: Urgency or
Distress Alr (M).
Note 2: Selecting any of
the emergency message
elements will result in
this message element
being enabled for the
pilot to include in the
emergency message at
their discretion. N/A
TXTD -2 (free text)
Note: M alert attribute. N DM67 (free text) DM98 (free text)
F-50
10/3/17 AC 90 -117
Appendix F
Table F-27. System Management Uplink Messages (SYSU )
Operational D efinition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SYSU -1 System -generated notification
of an error. ERROR (error information) N UM159 ERROR
(error information) UM159 ERROR
(error information)
SYSU -2 System -generated notification
of the next data authority or the
cancellation thereof. NEXT DATA AUTHORITY
(facility designation[O]) N UM160 NEXT
DATA AUTHORITY (ICAO facility designation)
Note: The facility designation is
required. UM160 NEXT DATA
AUTHORITY
(facility)
Note: Facility parameter can
specify a facility designation
or no facility.
SYSU -3 System -generated notification
that received message is not
supported. MESSAGE NOT SUPPORTED BY THIS ATC
UNIT N UM169 ‘MESSAGE
NOT SUPPORTED BY THIS ATC
UNIT’
Note: R response
attribute. UM162 MESSAGE NOT
SUPPORTED BY THIS
ATS UNIT
SYSU -4 System -generated notification
that the received is acceptable
for display. LOGICAL
ACKNOWLEDGEMENT N N/A UM227 LOGICAL
ACKNOWLEDGEMENT
SYSU -5 System -generated message
indicating that requests for logical acknowledgements are
not permitted. USE OF LOGICAL
ACKNOWLEDGEMENT
PROHIBITED N N/A UM233 USE OF LOGICAL
ACKNOWLEDGEMENT PROHIBITED
Note: ATN B1 ground
systems may not use UM
(as par ETSI CS) since the
use of LACK is required.
F-51
10/3/17 AC 90 -117
Appendix F
Operational D efinition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SYSU -6 Advisory providing the
maximum one -way uplink
message transmission delay. LATENCY TIME VALUE
(latency value) N UM169 ‘SET MAX
UPLINK DELAY
VALUE TO (delayed message parameter)
SECONDS’
Note 1: R response
attribute.
Note 2: On FANS 1/A
aircraft, this message requires specific action from the pilot to manually set the
latency value. N/A
SYSU -7 Indication that the received
message has a latency greater
than the requirement. MESSA GE RECEIVED TOO
LATE, RESEND MESSAGE OR CONTACT BY VOICE N N/A UM159 ERROR
(error information) +
UM183 ‘DOWNLINK
DELAYED USE – VOICE’
Note: The error information
is set to the value (2).
F-52
10/3/17 AC 90 -117
Appendix F
Table F -28. System Management Downlink Messages (SYSD )
Operational D efinition in PANS -ATM (Doc 4444) CPDLC Message Sets
Message Element
Identifier Message Element Intended
Use Format for Message Element
Display Resp. FANS 1/A ATN B1
SYSD -1 System -generated notification
of an error. ERROR (error information) N DM62 ERROR
(error information) DM62 ERROR
(error information)
SYSD -2 System -generated notification
that the received message is
acceptable for display. LOGICAL
ACKNOWLEDGEMENT N N/A DM100 LOGICAL
ACKNOWLEDGEMENT
SYSD -3 System -generated rejection of
any CPDLC message sent
from a ground facility that is
not the current data authority. NOT CURRENT DATA
AUTHORITY N DM63 NOT CURRENT
DATA AUTHORITY DM63 NOT CURRENT
DATA AUTHORITY
SYSD -4 System -generated notification
that the ground facility is now
the current data authority. CURRENT DATA
AUTHORITY N N/A DM99 CURRENT DATA
AUTHORITY
SYSD -5 System -generated notification
that the ground system is not
designated as the next data
authority (NDA), indicating
the identity of the Current
Data Authority. Identity of the
Next Data Authority, if any, is
also reported. NOT AUTHORIZED NEXT
DATA AUTHORITY
(facility designation)
(facility designation[O]) N DM64 (ICAO facility
designation)
Note: Use by FANS 1/A
aircraft in B1
environments. DM107 NOT AUTHORIZED
NEXT DATA AUTHORITY
Note: CDA and NDA cannot be
provided.
SYSD -6 Indication that the received
message has a latency greater
than the requirement. MESSAGE RECEIVED TOO
LATE, RESEND MESSAGE OR CONTACT BY VOICE N DM67 ‘MESSAGE
RECEIVED TOO LATE, RESEND
MESSAGE OR
CONTACT BY
VOICE’
Note: Sent with DM62. DM 98 ‘MESSAGE
RECEIVED TOO LATE,
RESEND MESSAGE OR
CONTACT BY VOICE’
Note: Sent with DM62.
SYSD -7 System -generated notification
that the aircraft is in the
inhibited state. AIRCRAFT CPDLC
INHIBITED N N/A DM 98 ‘AIRCRAFT CPDLC
INHIBITED'
F-53
10/3/17 AC 90 -117
Appendix F
Table F-29. FANS 1/A Uplink Messages Not Recommended for Use
Message Element Justification
UM49 CROSS (position) AT AND MAINTAIN (altitude) Avoid use of this message due to inability of aircraft automation to maintain
the altitude restriction.
UM62 AT (time) CROSS (position) AT AND MAINTAIN (altitude) Avoid use of this message due to inability of aircraft automation to maintain the altitude restriction.
UM85 EXPECT (route clearance) Avoid use of this message element due to potenti al misinterpretation.
UM86 AT (position) EXPECT (route clearance) Avoid use of this message element due to potential misinterpretation.
UM87 EXPECT DIRECT TO (position) Avoid use of this message element due to potential misinterpretation.
UM88 AT (position) EXPECT DIRECT TO (position) Avoid use of this message element due to potential misinterpretation.
UM89 AT (time) EXPECT DIRECT TO (position) Avoid use of this message element due to potential misinterpretation.
UM90 AT (altitude) EXPECT DIRECT TO (position) Avoid use of this message element due to potential misinterpretation.
UM162 SERVICE UNAVAILABLE Avoid use of this message element due to potential misinterpretation.
UM6 EXPECT (altitude) Avoid use of this message element due to potential misinterpretation.
UM11 EXPECT CRUISE CLIMB AT (time) Avoid use of this message element due to potential misinterpretation.
UM12 EXPECT CRUISE CLIMB AT (position) Avoid use of this message element due to potential misinterpretation.
UM13 A T (time) EXPECT CLIMB TO (altitude) Avoid use of this message element due to potential misinterpretation.
UM14 AT (position) EXPECT CLIMB TO (altitude) Avoid use of this message element due to potential misinterpretation.
UM15 AT (time) EXPECT DESCENT TO (altitude) Avoid use of this message element due to potential misinterpretation.
UM16 AT (position) EXPECT DESCENT TO (altitude) Avoid use of this message element due to potential misinterpretation.
UM17 AT (time) EXPECT CRUISE CLIMB T O (altitude) Avoid use of this message element due to potential misinterpretation.
UM49 CROSS (position) AT AND MAINTAIN (altitude) Avoid use of this message element due to potential misinterpretation.
UM62 AT (time) CROSS (position) AT AND MAINTAIN (altitude) Avoid use of this message element due to potential misinterpretation.
UM18 AT (position) EXPECT CRUISE CLIMB TO (altitude) Avoid use of this message element due to potential misinterpretation.
UM33 CRUISE (altitude) Avoid use of this message element due to potential misinterpretation.
UM34 CRUISE CLIMB TO (altitude) Avoid use of this message element due to potential misinterpretation.
F-54
10/3/17 AC 90 -117
Appendix F
Message Element Justification
UM35 CRUISE CLIMB ABOVE (altitude) Avoid use of this message element due to potential misinterpretation.
UM40 IMMEDIATELY STOP CLIMB AT (altitude) Avoid use of this message element due to potential misinterpretation.
UM41 IMMEDIATELY STOP DESCENT AT (altitude) Avoid use of this message element due to potential misinterpretation.
UM175 REPORT REACHING (altitude) Avoid use of this message element due to potential misinterpretation.
UM42 EXPECT TO CROSS (position) AT (altitude) Avoid use of this message element due to potential misinterpretation.
UM43 EXPECT TO CROSS (position) AT OR ABOVE (altitude) Avoid use of this message element due to potential misinterpretation.
UM44 EXPECT TO CROSS (position) AT OR BELOW (altitude) Avoid use of this message element due to potential misinterpretation.
UM45 EXPECT TO CROSS (position) AT AND MAINTAIN (altitude) Avoid use of this message element due to potential misinterpretation.
UM103 AT (time) EXPECT (speed) TO (speed) Avoid use of this message element due to potential misinterpretation.
UM104 AT (position) EXPECT (speed) TO (speed) Avoid use of this message element due to potential misinterpretation.
UM105 AT (altitude) EXPECT (speed) TO (speed) Avoid use of this message element due to potential misinterpretation.
UM165 THEN Avoid use of this message element due to potential misinterpretation.
UM235 ROGER 7500 Avoid use of this message element due to potential misinterpretation.
UM168 DISREGARD Not operationally required.
Note: These messages have been excluded from future B2 implementation .
UM176 MAINTAIN OWN SEPARATION AND VMC Not operationally required.
Note : These messages have been excluded from future B2 implementation .
UM152 WHEN CAN YOU ACCEPT (specified distance) (direction) OFFSET Not operationally required.
Note : These messages have been excluded from future B2 implementation .
UM115 DO NOT EXCEED (speed) Not operationally required.
Note : These messages have been excluded from future B2 implementation .
UM182 CONFIRM ATIS CODE Not operationally required.
Note : These messages have been excluded from future B2 implementation .
UM169 ‘TRANS MIT ADS -B IDENT’ Use of SQUAWK IDENT is recommended.
UM169 ‘IDENTIFICATION TERMINATED’ Use of SURVEILLANCE SERVICE TERMINATED is recommended.
UM132 CONFIRM POSITION Use of ADS -C is recommended.
UM133 CONFIRM ALTITUDE Use of ADS -C is recommended.
F-55
10/3/17 AC 90 -117
Appendix F
Message Element Justification
UM138 CONFIRM TIME OVER REPORTED WAYPOINT. Use of ADS -C is recommended.
UM139 CONFIRM REPORTED WAYPOINT Use of ADS -C is recommended.
UM140 CONFIRM NEXT WAYPOINT Use of ADS -C is recommended.
UM141 CONFIRM NEXT WAYPOINT ETA. Use of ADS -C is recommended.
UM142 CONFIRM ENSUING WAYPOINT Use of ADS -C is recommended.
UM146 REPORT GROUND TRACK Use of ADS -C is recommended.
UM181 REPORT DISTANCE (to/from) (position) Use of ADS -C is recommended.
UM145 CONFIRM HEADING Use of ADS -C is recommended.
UM177 AT PILOTS DISC RETION Not globally accepted. In airspace managed by the United States, when the
controller issues UM177 AT PILOTS DISCRETION in conjunction with
altitude assignments, the associated instruction to climb or descend may be executed when convenient and at any preferred rate. The aircraft may
temporarily maintain intermediate levels but once the aircraft has vacated a
level it may not return to that level.
F-56
10/3/17 AC 90 -117
Appendix F
Table F -30. FANS 1/A Downlink Messages Not Recommended for Use
Message Element Justification
DM69 REQUEST VMC DESCENT Avoid use of this message element due to potential misinterpretation
DM75 AT PILOTS DISCRETION Avoid use of this message element due to potential misinterpretation
DM 67 ‘WHEN CAN WE EXPECT DESCENT TO (altitude) ’ Avoid use of this message due to potential misinterpretation of subsequent
response. Use of LVLD -6 WHEN CAN WE EXPECT LOWER LEVEL and
LVLD -7 WHEN CAN WE EXPECT HIGHER LEVEL is recommended.
DM67 ‘WHEN CAN WE EXPECT CLIMB TO (altitude) ’ Avoid use of this me ssage due to potential misinterpretation of subsequent
response. Use of LVLD -6 WHEN CAN WE EXPECT LOWER LEVEL and
LVLD -7 WHEN CAN WE EXPECT HIGHER LEVEL is recommended.
DM74 REQUEST TO MAINTAIN OWN SEPARATION AND VMC Not operationally required.
Note: Thes e messages have been excluded from future B2 implementation.
DM8 REQUEST CRUISE CLIMB TO (altitude) Not operationally required.
Note: These messages have been excluded from future B2 implementation.
DM54 WHEN CAN WE EXPECT CRUISE CLIMB TO (altitude) Not operationally required.
Note: These messages have been excluded from future B2 implementation.
DM72 REACHING (altitude) Not operationally required.
Note: These messages have been excluded from future B2 implementation.
DM79 ATIS (ATIS code) Not operation ally required.
Note: These messages have been excluded from future B2 implementation.
DM67 ‘MONITORING (unit name) (frequency) ’ Not operationally required.
Note: These messages have been excluded from future B2 implementation.
DM16 AT (position) REQUEST OFFSET (specified distance) (direction) OF
ROUTE Not operationally required.
Note: These messages have been excluded from future B2 implementation.
DM17 AT (time) REQUEST OFFSET (specified distance) (direction) OF
ROUTE Not operationally required .
Note: These messages have been excluded from future B2 implementation.
DM26 REQUEST WEATHER DEVIATION TO (position) VIA
(route clearance) Not operationall y required.
Note: These messages have been excluded from future B2 implementation.
DM33 PRESENT PO SITION (position) Use of ADS -C is recommended.
DM36 PRESENT GROUND TRACK (degrees) Use of ADS -C is recommended.
F-57
10/3/17 AC 90 -117
Appendix F
Message Element Justification
DM42 NEXT WAYPOINT (position) Use of ADS -C is recommended.
DM43 NEXT WAYPOINT ETA (time) Use of ADS -C is recommended.
DM44 ENSUING WAYPOINT (position) Use of ADS -C is recommended.
DM45 REPORTED WAYPOINT (position) Use of ADS -C is recommended.
DM46 REPORTED WAYPOINT (time) Use of ADS -C is recommended.
DM78 AT (time) (distance) (to/from) (position) Use of ADS -C is recommended.
DM32 PRESENT ALTITUDE (altitude) Use of ADS -C is recommended.
DM35 PRESENT HEADING (degrees) Use of ADS -C is recommended.
DM19 REQUEST (speed) TO (speed) Use of SPDD -1 REQUEST (speed) is recommended.
DM50 WHEN CAN WE EXPECT (speed) TO (speed) Use of SPD D-1 REQUEST (speed) is recommended.
Table F -31. ATN B1 Uplink Messages Not Recommended for Use
Message Element Justification
UM165 THEN Avoid use of this message element due to potential misinterpretation.
Table F-32. ATN B1 Downlink Messages Not Recommended for Use
Message Element Justification
DM89 MONITORING (unit name) (frequency) Not operationally required.
Note: This message has been excluded from future B2 implementation.
F-58
10/3/17 AC 90 -117
Appendix G
AP
PENDIX G. TERMINOLOGY AND ACRONYMS
G.
1 Terminology.
1. Aeronautical Telecommunication s Network (ATN). A global inter -network
architecture that allows ground, air-ground, and avionic data subnetworks to
exchange digital data for the safety of air navigation and for the regular, efficient, and economic operation of A ir Traffic S ervices (ATS) .
2. Air Navigation Services P rovider (ANSP) . An organization responsible for the
provision of ATS .
3. Air Traffic Data Link Service. A data communication capability comprising
air/ground and ground/ground data network services, specified data link message sets and protocols, aircraft equipment, Air Traffic Service Unit (ATS U) facility
equipment, and operational procedures intended to provide primary or supplemental ATS U communications.
4. Air Traffic Service Unit (ATSU). This domain includes the controller and the
ATSU system which consists of an end system where data communications applications reside, a ground to ground router, a ground to ground communication network, and human -machine i nterface (HMI).
5. Aircraft Communications Addressing and Reporting System (ACARS). ACARS
is a digital data link system for transmission of short messages between aircraft and
ground stations via airband radi o or satellite. ACARS as a term refers to the complete
air and ground system, consisting of a service provider and aircraft/ ground
equipment.
6. Allocations. For approval, design, and monitoring purposes, performance requirements are provided against allocated human and technical Air Traffic System Management ( ATM )/Communication, Navigation, and Surveillance ( CNS ) elements
(i.e., the aircraft system, aircraft operator, ANSP , and Communication Service
Provider (CSP)) of the data communications transaction.
7. Automatic Dependent Surveillance -Contract (ADS -C). ADS -C is a surveillance
information system using automated reports. An agreement is established between the ground system and the aircraft via a data link. Without pilot input, the ATSU can establish a “co ntract” to provide reports of aircraft position, altitude, speed, elements
of navigational intent, and meteorological data. The system can generate the following types of reports:
• Demand : An ATSU can request an update as needed, and this does not affect
an existing contact preset rate.
• Event : A change in vertical rate, lateral deviation , or altitude automatically
triggers a report.
• Periodic : The ATSU can set or alter the update rate as needed (a higher update
rate is usually required in high traffic areas or with reduced lateral separations ).
G-1
10/3/17 AC 90 -117
Appendix G
8. Availability. The probability that an operational communication transaction can be
initiated when needed.
9. Communication Transaction Time . The maximum time for the completion of the
operational communication transaction, after which the initiator should revert to an
alternative procedure.
10. Continuity. The probability that an operational communication transaction can be
completed within the communication transaction time.
11. Controller- Pilot Data Link C ommunications (CPDLC). CPDLC is a two -way
data- link communication system by which controllers can transmit digital text
messages to an aircraft as an alternative to voice communications. Messages from an aircraft to the ATSU may follow a standard format or may be free text. Mes sages
from a controller normally follow a standard format and usually require a response from the pilot .
12. Current D ata Authority (CDA). The designated ground system through which a
CPDLC dialogue between a pilot and a controller currently responsible for the flight is permitted to take place.
13. Data L ink Communication System. A data link communication system is a means
of transmitting and receiving digital information. “ Data link ” is a generic term that
encompasses different types of data link communication systems and subnetworks.
14. Departure Clearance (DCL). DCL (CPDLC -DCL) is the initial phase of
U.S. domestic airspace implementation of data commun ication and is limited to
tower services. CPDLC -DCL provides automated assistance for requesting and
delivering initial and revised DCL s using CPDLC. The DCL includes flight plan
route, climb via and/or initial/requested altitude, beacon code assig nment,
and departure frequency.
15. Downlink M essage (DM). A CPDLC message sent from an aircraft.
16. Future Air Navigation Sys tem (FANS). FANS is an avionics system which
provides direct data link communication between the pilot and the air traffic controller. The communications include air traffic control (ATC) clearances, pilot
requests , and P osition R eporting (PR).
17. Integrity. The probability of one or more undetected errors in a completed
communication transaction.
18. Maximum Accumulated U nplanned O utage T ime. A value that defines the
acceptable accumulated duration of unplanned outages that exceed the unplanned outage duration l imit in a specified time period.
Note: Unplanned outages that are less than the unplanned outage duration limit
are considered against the criterion for continuity.
G-2
10/3/17 AC 90 -117
Appendix G
19. Maximum Number of U nplanned O utages. A value that defines the acceptable
number of unplanned outa ges that exceed the unplanned outage duration limit in a
specified time period.
Note: Unplanned outages that are less than the unplanned outage duration limit
are considered against the criterion for continuity.
20. Minimum E quipment L ist (MEL). A list whic h provide s for the operation
of aircraft, subject to specified conditions, with particular equipment inoperative,
prepared by an operator in conformity with, or more restrictive than, the Master
Minimum Equipment List ( MMEL ) established for the aircraft type.
21. Next D ata Authority (NDA) . The ground system so designated by the CDA through
which an onward transfer of comm unications and control can take place.
22. Performance -Based Communication and Surveillance (PBCS) . PBCS is a concept
that applies required communication performance (RCP) and required surveillance performance (RSP) specifications to ensure appropriate performance levels for relevant ATM operations (e.g. , application of a reduced separation minimum).
23. Pre-Departure Clearance (PDC) . A PDC is a clearance that is issued in a text
format rather than being issued audibly over a clearance delivery frequency. This text
clearance is issued through the use of a data link communication computer system
and is relayed from a dispatch system to the pilot via an ACARS message or a
terminal gate printer.
24. Required C ommunication Performance (RCP) . A set of requirements for ATS
provision, aircraft capability, and operations needed to support performance -based
communication within a defined airspace.
• RCP A vailability - Aircraft (A
AIR). An RCP allocation that specifies the
required probability that the aircraft system is serviceable for the relevant communication capability.
• RCP A vailability – CSP (A
CSP). An RCP allocation that specifies the required
probability that the CSP systems are available to provide the required level of
communication service, given the ATS U’s system is available.
25. Required Surveillance P erformance (RSP). A statement of the performance
requirements for operational surveillance in s upport of specific ATM functions.
26. Satellite Communication (SAT COM ). The Aviation SATCOM is a worldwide
mobile communications system providing voice and data communications services between aircraft subnetworks and ground subnetworks.
27. Secondary Surveillance Radar (SSR). A type of radar used by ATSU to transmit
and receive data on transponder equipped aircraft. This data includes barometric
altitude and identification codes .
28. Supplemental Type Certificate (STC). An STC is a type certificate (TC) issued
when an applicant has received FAA approval to modify an aeronautical product from
its original design .
G-3
10/3/17 AC 90 -117
Appendix G
29. Surveillance Transaction Time. The surveillance transaction time specifies the
maximum time for the completion of the operational surveillance process. This
parameter is an indication of time criticality.
30. Type Certificate (TC). A TC is issued by th e FAA when the airworthiness of an
aircraft manufacturing design has been de termined to be acceptable. Once issued, the
design cannot be changed without approval from the FAA.
31. Uplink M essage (UM). A CPDLC message sent from a ground system.
G-4
10/3/17 AC 90 -117
Appendix G
G.2 Acronyms .
Acronym Meaning
4-D Four -Dimensional
4DTRAD Four -Dimensional Trajectory Data Link
14 CFR Title 14 of The Code of Federal Regulations
AC Advisory Circular
ACARS Aircraft Communication s Addressing and Reporting System
ACL Air Traffic Control Clearance
ACM Air Traffic Control Communication Management
ACP Actual Communications Performance
ACTP Actual Communication Technical Performance
AD Airworthiness Directive
ADS Automatic Dependent Surveillance
ADS -C Automatic Dependent Surveillance -Contract
AEG Aircraft Evaluation Group
AFM Airplane Flight Manual
AFN Air Traffic Service Facilities Notification
AIP Aeronautical Information Publication
AIS Aeronautical Information Service
AMC Air Traffic Control Microphone Check
ANSP Air Navigation Service Provider
AOC Aeronautical Operational Control
ASP Actual Surveillance Performance
ATC Air Traffic Control
ATIS Automat ic Terminal Information Service
ATM Air Traffic System Management
ATN Aeronautical Telecommunication s Network
ATN B1 Aeronautical Telecommunication s Network Baseline 1
ATS Air Traffic Service
ATSU Air Traffic Service Unit
G-5
10/3/17 AC 90 -117
Appendix G
Acronym Meaning
B2 Baseline 2
CADS Centralized ADS -C System
CDA Current Data Authority
CDU Control Display Unit
CFR Code of Federal Regulations
CM Context Management
CNS Communication, Navigation, and Surveillance
CPDLC Controller -Pilot Data Link Communication
CRA Central Reporting Agency
CRD Clearance Request and Delivery
CRM Crew Resource Management
CSP Communication Service Provider
CVR Cockpit Voice Recorder
CWA Central Weather Advisory
D-ATIS Digital Automat ic Terminal Information S ervice
D-TAXI Data Link Taxi
DCL Departure Clearance
DCNS Data Communications Network Service
DLIC Data Link Initiation Capability
DLMA Data Link Monitoring Agency
DM Downlink Message
DRNP Dynamic Required Navigation Performance
DSC Downstream Clearance
DT RSP Data Delivery Time (associated with nominal continuity – 95 percent)
EPP Extended Projected Profile
ERAM En Route Automation Modernization
ET Expiration Time
EUROCAE European Organization for Civil Aviation Equipment
FAA Federal Aviation Administration
FANS Future Air Navigation System
G-6
10/3/17 AC 90 -117
Appendix G
Acronym Meaning
FBO Fixed -Base Operator
FDR Flight Data Recorder
FIR Flight Information Region
FMS Flight Management System
GA General Aviation
GOLD Global Operational Data Link (GOLD) Manual (Doc 10037)
GPS Global Positioning System
HF High Frequency (radio)
HFDL High Frequency Data Link
HMI Human -Machine Inter face
ICAO International Civil Aviation Organization
IER Information Exchange and Reporting
IFO International Field Office
IM Interval Management
INTEROP Interoperability Requirements Standards
ISPA CG Informal South Pacific Air Traffic Services Coordinating Group
ITP In-Trail Procedures
LOA Letter of Authorization
MEL Minimum Equipment List
MET I Meteorological Information
MMEL Master Minimum Equipment List
M/M/S Make, Model, and Series
MOPS Minimum Operational Performance Standard
MSpec Management Specification
MTBO Mean Time Between Outages
MU Management Unit
NAT North Atlantic
NDA Next Data Authority
NM Nautical Mile
NSDA National Single Data Authority
G-7
10/3/17 AC 90 -117
Appendix G
Acronym Meaning
OCD Oceanic Clearance Delivery
OCL Oceanic Clearance
OEM Original Equipment Manufacturer
OPR Operational Problem Report
OpSpec Operation s Specification
OT RSP data overdue time (associated with operational continuity)
PANS Procedures for Air Navigation Service
Part 91K Part 91 Subpart K
PBCS Performance -Based Communication and Surveillance
PBN Performance -Based Navigation
PDC Pre-Departure Clearance
PI Principal Inspector
PIREP Pilot Weather Report
POI Principal Operations Inspector
PORT Pilot Operational Response Time
PR Position Reporting
RA Radar Associate
RCP Required Communication Performance
RCP A AIR RCP Availability – Aircraft
RCP A CSP RCP Availability – CSP
RCP C RCP Continuity
RCP I RCP Integrity
RCTP Required Communication Technical Performance
RF Radio Frequency
RLatSM Reduced Lateral Separation Minima
RMA Regional Monitoring Agency
RNAV Area Navigation
RNP Required Navigation Performance
RSMP Required Surveillance Monitored Performance
RSP Required Surveillance Performance
G-8
10/3/17 AC 90 -117
Appendix G
Acronym Meaning
RSP A AIR RSP Availability – Aircraft
RSP A CSP RSP Availability – CSP
RSP C RSP Continuity
RSP I RSP Integrity
RSTP Required Surveillance Technical Performance
RTF Radio Telephone
SATCOM Satellite Communication
SBB SwiftBroadband
SBD Short Burst Data
SDP Service Delivery Point
SELCAL Selective -Calling System
SID Standard Instrument Departure
SIGMET Significant Meteorological Information
SITA Société International de Télécommunications Aeronautiques
SOC Statement of Compliance
SPR Safety and Performance Requirements
SSR Secondary Surveillance Radar
STC Supplemental Type Certificate
TC Type Certificate
TDLS Tower Data Link Services
TSO Technical Standard Order
TWIP Terminal Weather Information for Pilots
UM Uplink Message
VDL Very High Frequency Data Link
VHF Very High Frequency (radio)
G-9
Advisory Circular Feedback Form
If you find an error in this AC, have recommendations for improving it, or have suggestions for
new items/subjects to be added, you may let us know by contacting the Flight Technologies
Division (AFS-400) at 9-AWA-AFS400-COORD@faa.gov or the Flight Standards Directives
Management Officer at 9-AWA-AFS-140-Directives@faa.gov .
Subject: AC 90-117, Data Link Communications
Date: _______________
______
Please check all appropriate line items:
An error (procedural or typographical) has been noted in paragraph ____________
on page _______ .
Recommend paragraph _____________ on page __________ be changed as follows:
______________________________________________________________________
______________________________________________________________________
In a future change to this AC, please cover the following subject:
(Briefly describe what you want added.)
______________________________________________________________________
______________________________________________________________________
Other comments:
______________________________________________________________________
______________________________________________________________________
I would like to discuss the above. Please contact me.
Submitted by: Date: ______________________
Fly GACA is an independent educational platform. It is not affiliated with, endorsed by, or operated by the General Authority of Civil Aviation (GACA) or the Government of the Kingdom of Saudi Arabia. The official and authoritative source for all civil aviation regulations, publications, and aeronautical information is always GACA. Always verify against the latest official GACA publication at gaca.gov.sa.